We granted review in this case to determine whether emotional distress damages are recoverable for the negligent breach of a contract to construct a house. A jury awarded the homeowners the full cost necessary to repair their home as well as damages for emotional distress caused by
I. Factual and Procedural Background
Both parties agree with the facts as ascertained by the Court of Appeal. Barry and Sandra Erlich contracted with John Menezes, a licensed general contractor, to build a “dream house” on their ocean-view lot. The Erlichs moved into their house in December 1990. In February 1991, the rains came. “[Tjhe house leaked from every conceivable location. Walls were saturated in [an upstairs bedroom], two bedrooms downstairs, and the pool room. Nearly every window in the house leaked. The living room filled with three inches of standing water. In several locations water ‘poured in in streams’ from the ceilings and walls. The ceiling in the garage became so saturated ... the plaster liquefied and fell in chunks to the floor.”
Menezes’s attempts to stop, the leaks proved ineffectual. Caulking placed around the windows melted, “ ‘ran down [the] windows and stained them and ran across the driveway and ran down the house [until it] . . . looked like someone threw balloons with paint in them at the house.’ ” Despite several repair efforts, which included using sledgehammers and jackhammers to cut holes in the exterior walls and ceilings, application of new waterproofing materials on portions of the roof and exterior walls, and more caulk, the house continued to leak—from the windows, from the roofs, and water seeped between the floors. Fluorescent light fixtures in the garage filled with water and had to be removed.
“The Erlichs eventually had their home inspected by another general contractor and a structural engineer. In addition to confirming defects in the roof, exterior stucco, windows and waterproofing, the inspection revealed serious errors in the construction of the home’s structural components. None of the 20 shear, or load-bearing walls specified in the plans were properly installed. The three turrets on the roof were inadequately connected to the roof beams and, as a result, had begun to collapse. Other connections in the roof framing were also improperly constructed. Three decks were in danger of ‘catastrophic collapse’ because they had been finished with mortar and ceramic tile, rather than with the light-weight roofing material originally specified. Finally, the foundation of the main beam for the two-story living room was poured by digging a shallow hole, dumping in ‘two sacks of dry concrete mix, putting some water in the hole and mixing it up with a shovel.’ ” This foundation, required to carry a load of 12,000 pounds, could only support about 2,000. The beam is settling and the surrounding concrete is cracking.
According to the Erlichs’ expert, problems were major and pervasive, concerning everything “related to a window or waterproofing, everywhere that there was something related to framing,” stucco, or the walking deck.
Both of the Erlichs testified that they suffered emotional distress as a result of the defective condition of the house and Menezes’s invasive and unsuccessful repair attempts. Barry Erlich testified he felt “absolutely sick” and had to be “carted away in an ambulance” when he learned the full extent of the structural problems. He has a permanent heart condition, known as superventricular tachyarrhythmia, attributable, in part, to excessive stress. Although the condition can be controlled with medication, it has forced him to resign his positions as athletic director, department head and track coach.
Sandra Erlich feared the house would collapse in an earthquake and feared for her daughter’s safety. Stickers were placed on her bedroom windows, and
Plaintiffs sought recovery on several theories, including breach of contract, fraud, negligent misrepresentation, and negligent construction. Both the breach of contract claim and the negligence claim alleged numerous construction defects.
Menezes prevailed on the fraud and negligent misrepresentation claims. The jury found he breached his contract with the Erlichs by negligently constructing their home and awarded $406,700 as the cost of repairs. Each spouse was awarded $50,000 for emotional distress, and Barry Erlich received an additional $50,000 for physical pain and suffering and $15,000 for lost earnings.
By a two-to-one majority, the Court of Appeal affirmed the judgment, including the emotional distress award. The majority noted the breach of a contractual duty may support an action in tort. The jury found Menezes was negligent. Since his negligence exposed the Erlichs to “intolerable living conditions and a constant, justifiable fear about the safety of their home,” the majority decided the Erlichs were properly compensated for their emotional distress.
The dissent pointed out that no reported California case has upheld an award of emotional distress damages based upon simple breach of a contract to build a house. Since Menezes’s negligence directly caused only economic injury and property damage, the Erlichs were not entitled to recover damages for their emotional distress.
We granted review to resolve the question.
II. Discussion
A.
In an action for breach of contract, the measure of damages is “the amount which will compensate the party aggrieved for all the detriment proximately caused thereby, or which, in the ordinary course of things, would be likely to result therefrom” (Civ. Code, § 3300), provided the damages are “clearly ascertainable in both their nature and origin” (Civ. Code, § 3301). In an action not arising from contract, the measure of damages is “the amount which will compensate for all the detriment proximately caused thereby, whether it could have been anticipated or not” (Civ. Code, § 3333).
“Contract damages are generally limited to those within the contemplation of the parties when the contract was entered into or at least reasonably foreseeable by them at that time; consequential damages beyond the expectation of the parties are not recoverable. [Citations.] This limitation on available damages serves to encourage contractual relations and commercial activity by enabling parties to estimate in advance the financial risks of their enterprise.” (Applied Equipment Corp. v. Litton Saudi Arabia Ltd. (1994)
“ ‘[T]he distinction between tort and contract is well grounded in common law, and divergent objectives underlie the remedies created in the two areas. Whereas contract actions are created to enforce the intentions of the parties to the agreement, tort law is primarily designed to vindicate “social policy.” [Citation.]’” (Hunter v. Up-right, Inc. (1993)
B.
In concluding emotional distress damages were properly awarded, the Court of Appeal correctly observed that “the same wrongful act may constitute both a breach of contract and an invasion of an interest protected by the law of torts.” (North American Chemical Co. v. Superior Court (1997)
The Court of Appeal also noted that “[a] contractual obligation may create a legal duty and the breach of that duty may support an action in tort.” This is true; however, conduct amounting to a breach of contract becomes tortious only when it also violates a duty independent of the contract arising from principles of tort law. (Applied Equipment, supra,
Tort damages have been permitted in contract cases where a breach of duty directly causes physical injury (Fuentes v. Perez (1977) 66 Cal.App.3d 163, 168, fn. 2 [
Plaintiff’s theory of tort recovery is that mental distress is a foreseeable consequence of negligent breaches of standard commercial contracts. However, foreseeability alone is not sufficient to create an independent tort duty. “ ‘Whether a defendant owes a duty of care is a question of law. Its existence depends upon the foreseeability of the risk and a weighing of policy considerations for and against imposition of liability.’ [Citation.]” (Burgess v. Superior Court (1992)
The question thus remains: is the mere negligent breach of a contract sufficient? The answer is no. It may admittedly be difficult to categorize the cases, but to state the rule succinctly: “[C]ourts will generally enforce the breach of a contractual promise through contract law, except when the actions that constitute the breach violate a social policy that merits the imposition of tort remedies.” (Freeman & Mills, supra,
The special relationship test, which has been criticized as illusory and not sufficiently precise (Putz & Klippen, Commercial Bad Faith: Attorneys Fees—Not Tort Liability—Is the Remedy for “Stonewalling” (1987) 21 U.S.F. L.Rev. 419, 478-479), has little relevance to the question before us. Menezes is in the business of building single-family homes. He is one among thousands of contractors who provide the same service, and the Erlichs could take their choice among any contractors willing to accept work in the area where their home would be constructed. Although they undoubtedly relied on his claimed expertise, they were in a position to view, inspect, and criticize his work, or to hire someone who could. Most significantly, there is no indication Menezes sought to frustrate the Erlichs’ enjoyment of contracted-for benefits. He did build a house. His ineptitude led to numerous problems which he attempted to correct. And he remains ultimately responsible for reimbursing the cost of doing the job properly.
Moreover, since, as Foley noted, the insurance cases represented “a major departure from traditional principles of contract law,” any claim for automatic extension of that exceptional approach whenever “certain hallmarks and similarities can be adduced in another contract setting” should be carefully considered. (Foley, supra,
Our previous decisions detail the reasons for denying tort recovery in contract breach cases: the different objectives underlying tort and contract breach; the importance of predictability in assuring commercial stability in contractual dealings; the potential for converting every contract breach into a tort, with accompanying punitive damage recovery, and the preference for legislative action in affording appropriate remedies. (Freeman & Mills, supra,
Generally, outside the insurance context, “a tortious breach of contract . . . may be found when (1) the breach is accompanied by a traditional common law tort, such as fraud or conversion; (2) the means used to breach the contract are tortious, involving deceit or undue coercion or; (3) one party intentionally breaches the contract intending or knowing that such a breach will cause severe, unmitigable harm in the form of mental anguish, personal hardship, or substantial consequential damages.” (Freeman & Mills, supra,
In this case, the jury concluded Menezes did not act intentionally; nor was he guilty of fraud or misrepresentation. This is a claim for negligent breach of a contract, which is not sufficient to support tortious damages for violation of an independent tort duty.
It may ultimately be more useful, in attempting to develop a common law of tortious breach, to affirmatively identify specific practices utilized by contracting parties that merit the imposition of tort remedies (Freeman & Mills, supra,
C.
Even assuming Menezes’s negligence constituted a sufficient independent duty to the Erlichs, such a finding would not entitle them to emotional distress damages on these facts. “The fact that emotional distress damages may be awarded in some circumstances (see Rest.2d Torts, § 905, pp. 456-457) does not mean they are available in every case in which there is an independent cause of action founded upon negligence.” (Merenda v. Superior Court (1992)
Although the Court of Appeal, plaintiffs, and their amici curiae rely substantially on Potter v. Firestone Tire & Rubber Co. (1993)
Second, the water supply of the plaintiffs in Potter had already been contaminated. The prolonged exposure could not be undone. In contrast, the Erlichs could have avoided the threatened injury by moving out of the house until necessary repairs had been completed. If they had, relocation expenses would have been part of their damages. In any event, the general measure of damages where injury to property is capable of being repaired is the reasonable cost of repair together with the value of lost use during the period of injury. (6 Witkin, Summary of Cal. Law (9th ed. 1988) Torts, § 1462, pp. 934-935.)
In short, Potter permitted recovery, within stringent limits, for emotional distress resulting from a personal injury directly caused by the defendant’s tortious conduct. The Erlichs seek recovery for emotional distress engendered by an injury to their property.
To the extent Potter is relevant here, it reiterates that “unless the defendant has assumed a duty to plaintiff in which the emotional condition of the plaintiff is an object, recovery is available only if the emotional distress arises out of the defendant’s breach of some other legal duty and the emotional distress is proximately caused by [breach of the independent duty]. Even then, with rare exceptions, a breach of the duty must threaten physical injury, not simply damage to property or financial interests. [Citations.]” (Potter, supra,
The question was thoroughly explored in Merenda, supra,
In Camenisch, supra,
In Lubner v. City of Los Angeles (1996)
Public policy supports a similar limit where the negligence concerns the construction of a home. In Blagrove v. JB Mechanical, Inc. (Wyo. 1997)
“In deciding whether the plaintiff’s interests are entitled to legal protection against the defendant’s conduct, we must balance the interest of the injured parties against the view that a negligent act should have some end to its legal consequences. . . . We are persuaded that the concerns which have acted to prevent recovery for emotional distress when property is damaged remain relevant and weigh against permitting recovery. While we do not doubt that the Blagroves were justifiably and seriously distressed over the damage to [their home], adopting a rule allowing trial on the issue and recovery if proved would result in unacceptable burdens for both the judicial system and defendants. We therefore hold that emotional distress damages in connection with property damages are not compensable.” (Blagrove, supra, 934 P.2d at pp. 1276-1277; see also Caradonna v. Thorious (1969)
Here, the breach—the negligent construction of the Erlichs’ house—did not cause physical injury. No one was hit by a falling beam. Although the Erlichs state they feared the house was structurally unsafe
The Erlichs may have hoped to build their dream home and live happily ever after, but there is a reason that tag line belongs only in fairy tales. Building a house may turn out to be a stress-free project; it is much more likely to be the stuff of urban legends—the cause of bankruptcy, marital dissolution, hypertension and fleeting fantasies ranging from homicide to suicide. As Justice Yegan noted below, “No reasonable homeowner can embark on a building project with certainty that the project will be completed to perfection. Indeed, errors are so likely to occur that few if any homeowners would be justified in resting their peace of mind on [its] timely or correct completion . . . .” The connection between the service sought and the aggravation and distress resulting from incompetence may be somewhat less tenuous than in a malpractice case, but the emotional suffering still derives from an inherently economic concern.
D.
Having concluded tort damages are not available, we finally consider whether damages for emotional distress should be included as consequential or special damages in a contract claim, “Contract damages are generally limited to those within the contemplation of the parties when the contract was entered into or at least reasonably foreseeable by them at the time; consequential damages beyond the expectations of the parties are not recoverable. [Citations.] This limitation on available damages serves to encourage contractual relations and commercial activity by enabling parties to estimate in advance the financial risks of their enterprise.” (Applied Equipment, supra,
“ ‘[W]hen two parties make a contract, they agree upon the rules and regulations which will govern their relationship; the risks inherent in the agreement and the likelihood of its breach. The parties to the contract in essence create a mini-universe for themselves, in which each voluntarily chooses his contracting partner, each trusts the other’s willingness to keep his word and honor his commitments, and in which they define their respective obligations, rewards and risks. Under such a scenario, it is appropriate to enforce only such obligations as each party voluntarily assumed, and to give him only such benefits as he expected to receive; this is the function of contract law.’ ” (Applied Equipment, supra,
Accordingly, damages for mental suffering and emotional distress are generally not recoverable in an action for breach of an ordinary commercial contract in California. (Kwan v. Mercedes-Benz of North America, Inc. (1994)
Cases permitting recovery for emotional distress typically involve mental anguish stemming from more personal undertakings the traumatic results of which were unavoidable. (See, e.g., Burgess v. Superior Court, supra,
Cases from other jurisdictions have formulated a similar rule, barring recovery of emotional distress damages for breach of contract except in cases involving contracts in which emotional concerns are the essence of the contract. (See, e.g., Hancock v. Northcutt (Alaska 1991)
Plaintiffs argue strenuously that a broader notion of damages is appropriate when the contract is for the construction of a home. Amici curiae urge us to permit emotional distress damages in cases of negligent construction of a personal residence when the negligent construction causes gross interference with the normal use and habitability of the residence.
Such a rule would make the financial risks of construction agreements difficult to predict. Contract damages must be clearly ascertainable in both nature and origin. (Civ. Code, § 3301.) A contracting party cannot be required to assume limitless responsibility for all consequences of a breach and must be advised of any special harm that might result in order to determine whether or not to accept the risk of contracting. (1 Witkin, Summary of Cal. Law (9th ed. 1987) Contracts, § 815, p. 733.)
Moreover, adding an emotional distress component to recovery for construction defects could increase the already prohibitively high cost of housing in California, affect the availability of insurance for builders, and greatly diminish the supply of affordable housing. The potential for such broad-ranging economic consequences—costs likely to be paid by the public generally—means the task of fashioning
Permitting damages for emotional distress on the theory that certain contracts carry a lot of emotional freight provides no useful guidance. Courts have carved out a narrow range of exceptions to the general rule of exclusion where emotional tranquillity is the contract’s essence. Refusal to broaden the bases for recovery reflects a fundamental policy choice. A rule which focuses not on the risks contracting parties voluntarily assume but on one party’s reaction to inadequate performance, cannot provide any principled limit on liability.
The discussion in Kwan, a case dealing with the breach of a sales contract for the purchase of a car, is instructive. “[A] contract for [the] sale of an automobile is not essentially tied to the buyer’s mental or emotional well-being. Personal as the choice of a car may be, the central reason for buying one is usually transportation. . . . fl[] In spite of America’s much-discussed ‘love affair with the automobile,’ disruption of an owner’s relationship with his or her car is not, in the normal case, comparable to the loss or mistreatment of a family member’s remains [citation], an invasion of one’s privacy [citation], or the loss of one’s spouse to a gambling addiction [citation]. In the latter situations, the contract exists primarily to further or protect emotional interests; the direct and foreseeable injuries resulting from a breach are also primarily emotional. In contrast, the undeniable aggravation, irritation and anxiety that may result from [the] breach of an automobile warranty are secondary effects deriving from the decreased usefulness of the car and the frequently frustrating process of having an automobile repaired. While [the] purchase of an automobile may sometimes lead to severe emotional distress, such a result is not ordinarily foreseeable from the nature of the contract.” (Kwan, supra,
Most other jurisdictions have reached the same conclusion. (See Sanders v. Zeagler (La. 1997)
We agree. The available damages for defective construction are limited to the cost of repairing the home, including lost use or relocation expenses, or the diminution in value.
Disposition
The judgment of the Court of Appeal is reversed and the matter is remanded for further proceedings consistent with this opinion.
George, C. J., Kennard, J., Baxter, J., and Chin, J., concurred.
Notes
At oral argument, plaintiff cited Sloane v. Southern Cal. Ry. Co. (1896)
Concurrence Opinion
I concur in the majority opinion insofar as it holds that a plaintiff may not recover damages for emotional distress based on a defendant’s negligent breach of a contract to build a house when the defendant has breached no duty independent of the contract. Although I read the record differently as to whether these plaintiffs did, in fact, present an independent claim for negligence, in view of the majority’s conclusion that plaintiffs did not present such a claim (see maj. opn., ante, at pp. 548, 554), the discussion in part C of the majority opinion (id., at pp. 554-558) is unnecessary. I therefore express no opinion on the circumstances under which a tort plaintiff may recover damages for emotional distress.
Mosk, J., concurred.