77 Pa. Super. 196 | Pa. Super. Ct. | 1921
Opinion by
The complaints filed by the state highway commissioner in his official capacity averred that a certain state highway was twice crossed at grade by the track of the Erie Railroad Company in Richmond Township, Tioga County; that the two crossings were about seven thousand feet apart; that they were dangerous and should be abolished. Upon notice of the complaints the railroad company filed a formal answer denying that the crossings were dangerous or that there was any real necessity for their abolition. A brief hearing followed at which there appeared before the commission one of the engineers of the State Highway Department. He described the locations of the crossings and testified: “The State Highway Department proposes, in order to remove the travel from those crossings, to relocate the line (of the highway) to the east side of the railroad— build an entirely new highway.” Further on in his testimony, in answer to a question as to the extent of the travel on this highway, he said: “At the present time it isn’t very heavy. It is though on the trunk line leading from New York State directly to Williamsport.” He gave it as his opinion that the more northerly of the two crossings was the more dangerous and could be entirely eliminated without seriously affecting the convenience of the local community, but that as to the southerly of the two crossings, local conditions would require that it remain open. He testified that the entire cost of the execution of the plan of the State Highway Department for eliminating this crossing would be $178,000 exclu
At the second hearing on August the 18th the same highway department engineer again testified, going over some of the matters as to local conditions of the former hearing and wasi then asked: “Q. — What does your plan (the State Highway Department’s plan) contemplate as to the method in which these two crossings should be eliminated? A. — By continuing the highway on the east side of the track from the southern crossing to a point about 3,000 feet beyond the northern crossing where it will join the present highway. Q. — Does that contemplate abolishing both of these crossings? A. — It. would remove the state highway from both crossings.” The County of Tioga having filed an elaborate answer setting forth in detail the financial condition of the county and its inability to contribute any sum towards the proposed improvement, its county commissioner was
We have now before us the substance of all of the material testimony produced before the Public Service Commission. There followed a second and final order of the commission on September 14,1920, and we quote briefly from the report of that date for the purpose of getting clearly before us the action of the commission and the line of reasoning that led to it. “At a former hearing both of these crossings were declared dangerous and their abolition ordered. The State Highway Department has filed plans promding for the reconstruction of the highway between the two crossings along the east side of the railroad track. (Italics ours.)......The plan proposes that the northerly of the two crossings be entirely closed and the present highway between the two crossings remain open for the convenience of the public residing along the same, they being able to reach the new state highway by using the present grade crossing located at the station of respondent. The southerly grade crossing will be closed to all except the local traffic; the through traffic being diverted along the relocated highway. The plans as submitted are satisfactory to the county, township and railroad company. The estimated cost of constructing and relocating the highway in accordance with the plans submitted, excluding land damages and the cost of concrete paving, is about $105,000......That the respondent railroad company is assessed and shall pay to the State Highway Department towards the cost of the elimination of the crossing the sum of $40,000.” Further assessments against the County of Tioga, the Township of Richmond, the contribution to be made by the Public Service Commission and the assessment of the remaining portion of the cost against the State Highway Department are set forth in the report. The Erie Railroad Company has appealed to this court.
In 1911 the legislature of Pennsylvania appears to have finally determined it would no longer attempt to' expand or develop the then existing system of road making in the Commonwealth. Long years of painful experience had at last brought the conviction that if we were to look forward to a system of highways that could, in time, be developed so as to reasonably meet the necessities of the State and the demands of its people, the foundations of that system must be laid by the State itself. They must needs be as. broad as our territory. Their design and the execution of that design must be marked by that unity of purpose and effort which is the attribute of the sovereign and must be supported by a never-failing stream of financial aid, the source of which could only be the taxing power of the Commonwealth. ■ By the Act of May 31, 1911, P. L. 468, the statute itself designated and described two hundred and ninety-six separate trunk routes, each one of which thereafter should become a state highway, to be constructed and
In 1913 another marked advance was made in the policy of the State and the administration of its affairs by the creation of a Public Service Commission by the Act of July 26, P. L. 1374. The broad purpose of the creation of that commission and the conferring upon it of very wide and unusual powers was to regulate the formation of new and the operation of all public service companies doing business within the Commonwealth. It is quite clear there was no legislative intent to confuse the powers of these two great departments nor to make one dependent on the other, save and save only where a highway was, or was to be crossed at grade by, or was to be carried over or under the tracks or facilities of a public service company. Within its own proper sphere each was the state itself. The Public Service Commission, in section 12, of article V, of the Act of
1. The two orders of the Public Service Commission read together leave some doubt as to whether they actually abolished one grade crossing or two. It is of the utmost importance to the appellant railroad company to have precise information on this point. That both crossings were abolished by the first order is clear. The second order, following the suggestion advanced by the highway engineer in his testimony, seems to leave it uncertain whether or not the second of the two crossings was to be closed only to through travel and left open for local travel. This question can be easily disposed of when the commission makes its further report.
2. No one denies the power of the commission to abolish either or both of the crossings referred to in the complaint. Nor is it questioned that if the commission determined to abolish both crossings, and that act should necessitate some readjustment of the local road system to avoid undue inconvenience to the local travel, the commission may make such change in that local system of roads even to the laying out of a new one. But it ought to be clear that the new road to be laid out by the commission under such circumstances, is not to be a state
3. We are inclined to think the apparently inadequate consideration given to these questions by the commission results from the mistake of fact indicated in the following sentence taken from the report: “The plans as
We have therefore determined to set aside tbe order of tbe commission appealed from and remit tbe record to that body for such further consideration along tbe lines set out by this opinion as they may deem adequate for a just and proper determination of tbe questions raised by tbe complaint and answer. It is so ordered.