INTRODUCTION
¶ 1 This case involves a dispute over whether Plaintiff Stanford M. Ellsworth is bound by the arbitration provision of a construction and remodeling contract. The district court granted summary judgment in favor of Defendant Lowell Construction Company (Lowell), finding that Mr. Ells-worth was bound by the arbitration provision and dismissing Mr. Ellsworth’s suit for declaratory relief. Mr. Ellsworth appealed, arguing that: (1) the district court erred in granting Lowell’s motion for summary judgment because of disputed material facts; and (2) the district court erred by dismissing Mr. Ellsworth’s action rather than issuing a stay pending the conclusion of the arbitration proceedings as required by Utah Code section 78-31a-108(7) (2002). We hold that the district court erred in entering summary judgment in favor of Lowell because, as a matter of law, the facts of this case do not amount to direct and specific evidence of an agreement to arbitrate. 1 Because our holding is disposi-tive of this appeal, we do not address whether the district court should have stayed the proceedings.
BACKGROUND
¶ 2 “When reviewing a district court’s grant of summary judgment, we view the facts and all reasonable inferences drawn therefrom in the light most favorable to the nonmoving party, here the plaintiff. We reсite the facts accordingly.”
Wayment v. Clear Channel Broad., Inc.,
¶ 3 In' 1997, Mr. Ellsworth married Carol Lee Fairbanks Naylor. Prior to marriage, Ms. Naylor owned a house and property located in Salt Lake City, and the couple resided in Ms. Naylor’s home throughout their marriage. 2 During the marriage, Ms. Naylor remained the sole legal owner of the house. In April 2002, a tree fell on Ms. Naylor’s home. Shortly thereafter, Ms. Nay-lor began planning for repairs to the damaged house; the repairs were to be paid for by an insurance policy. 3
¶ 4 Ms. Naylor negotiated the terms of a contract to repair the home with Gary Ev-ershed, with the work to be completed by Lowell. 4 Mr. Ellsworth was present during conversations Ms. Naylor had with Mr. Ev-ershed but never represented that he intended to be a party to the agreement, that he had any ownership interest in the house, or that Ms. Naylor had authority to act as his agent. ’ On June 11, 2002, Mr. Evershed presented a contract (the June 11 Agreement), prepared by Lowell, to Ms. Naylor. On the June 11 Agreement’s cover page, both Ms. Naylor and Mr. Ellsworth were listed as “Owners,” and the “Project” was identified as *986 the “Naylor/Ellsworth Residence.” 5 However, the signature page had only one signature line, labeled “Owner.” Ms. Naylor signed the June 11 Agreement’s signature page as “Owner”; Mr. Ellsworth did not.
¶5 After the June 11 Agreement was entered, Ms. Naylor and Lowell began negotiating for Lowell to perform additional remodeling work on the home. The circumstances surrounding Mr. Ellsworth’s involvement in those negotiations are substantially similar to those of the June 11 Agreement. A contract for that project (the June 20 Agreement), prepared by Lowell, was presented to Ms. Naylor on June 20, 2002. As with the June 11 Agreement, the cover page of the June 20 Agreement listed both Ms. Naylor and Mr. Ellsworth as “Owners” and identified the “Project” as the “Naylor/Ellsworth Residence Remodel.” The June 20 Agreement’s signature page also had only one signature line, underscored by the word “Owner,” and the contract was signed only by Ms. Naylor.
¶ 6 The terms of the June 11 Agreement and thе June 20 Agreement are nearly identical, particularly the provisions relevant to this appeal. 6 The arbitration provision at issue here, found at item 10.8 of the June 11 Agreement and item 15.8 of the June 20 Agreement, provides as follows: “All claims or disputes between the Contractor and the Owner arising out of or relating to the Contract Documents, or the breach thereof, shall be decided by arbitration.”
¶ 7 The dispute in this case arises specifically from the events following the signing of the contract, which are hotly debated by the parties. From the facts in the record, it appears that Mr. Evershed approached Mr. Ellsworth on several occasions, outside the presence of Ms. Naylor, in order to talk about the project. Mr. Ellsworth claims that, on аll of these occasions, he deferred making any decisions about the project until he could speak with Ms. Naylor. On the other hand, Lowell claims that on certain occasions Mr. Evershed discussed costs of the project with Mr. Ellsworth, and Mr. Ells-worth asked him not to tell Ms. Naylor about the total costs of some parts of the work. Mr. Ellsworth denies this. In April 2003, Lowell represented that it had comрleted the work and sent a final bill to Ms. Naylor.
¶ 8 Following the completion of the project, a dispute arose between Ms. Naylor and Lowell concerning unperformed work that was nevertheless billed to the insurance company, disputed costs, undelivéred invoices, and a lack of supporting documentation of the costs of the project. 7 Through their attorneys, Ms. Naylor and Lowell exchanged a series of correspondence regarding their disputes.
¶ 9 In June 2004, Lowell filed a Demand for Arbitration with the American Arbitration Association (AAA) against both Mr. Ells-worth and Ms. Naylor. Mr. Ellsworth objected to the jurisdiction of the arbitrator, claiming that he was not party to either the June 11 Agreement or the June 20 Agreement, which contain the arbitration clauses on which Lowell bаsed its demand. In September of that year, Mr. Ellsworth also filed a complaint naming the AAA, Lowell, and Ms. Naylor as defendants. In his complaint, Ellsworth asked for (1) a declaratory judgment that he is not a party to the June 11 Agreement or the June 20 Agreement and is therefore not subject to the agreements’ arbitration clauses, and (2) a stay of the arbitration proceedings and a permanent injunction prohibiting Lowell and the AAA from proceeding against him through methods of dispute resolution that he did not bargain *987 for. Ms. Naylor answered Mr. Ellsworth’s complaint and made counterclaims and cross-claims against the other parties. 8 She also moved to stay the arbitration proceedings. 9 Lowell opposed that motion and moved to dismiss all claims against it and to compel arbitration.
¶ 10 A hearing concerning Ms. Naylor’s motion to stay аrbitration and Lowell’s motion to dismiss the complaint and compel arbitration was held before the district court on January 31, 2005. After the hearing, the court granted Lowell’s motion to dismiss Mr. Ellsworth’s action, denied Ms. Naylor’s motion for a stay of the arbitration proceedings, and ordered the parties to arbitrate. Mr. Ellsworth appealed to this court on April 11, 2005. We originally transferred the cаse to the Utah Court of Appeals' pursuant to Utah Code section 78-2-2(4) (2002). We then recalled the case on February 21, 2006, after briefs had been filed but before the court of appeals had heard oral argument. We have jurisdiction over this matter pursuant to Utah Code section 78-2-2(3)© (2002). •
STANDARD OF REVIEW
¶ 11 While Lowell moved to dismiss Mr. Ellsworth’s complaint pursuant to rule 12(b)(6) of the Utah Rules of Civil Procedure, when “matters outside the pleading are presented to and not excluded by the court, the motion shall be treated as one for summary judgment and disposed of as provided in Rule 56.” Utah R. Civ. P. 12(b) (2006). Because “affidavits or other evidence” were presented to, and not excluded by, the district court, we review that court’s decision as a summary judgment.
DOIT, Inc. v. Touche, Ross & Co.,
¶ 12 “[A] challenge to a summary judgment presents for review оnly conclusions of law because, by definition, cases decided on summary judgment do not resolve factual disputes.”
Schurtz v. BMW of N. Am., Inc.,
ANALYSIS
¶ 13 Mr. Ellsworth appeals the judgment and order of the district court on two grounds. First, he argues that the district court erred by granting summary judgment in favor of Lowеll. Second, he argues that the district court was required, under Utah law, to stay the judicial proceeding pending the outcome of the arbitration instead of dismissing his suit. We agree with Mr. Ells-’ worth that the district court’s grant of summary judgment in favor of Lowell was improper and erroneous. Moreover, under the facts of this case, we do not believe that direct and specific evidence of an assent to arbitrate by Mr. Ellsworth exists. Accordingly, we holdi as a matter of law, that Mr. Ellsworth is not bound by the arbitration clause. We reverse and remand to the district court with, instructions to enter declaratory relief and grant an injunction in favor of Mr. Ellsworth. Because our holding disposes of Mr. Ellsworth’s appeal, we do not address whether the district court should have stayed the proceedings.
¶ 14 Arbitration is a matter of contract law,
Cade v. Zions First Nat’l Bank,
¶ 15 The district court erred in granting summary judgment for Lowell because the facts offer no direct and specific evidence of an agreement to arbitrate. The district court relied on two things to support its decision that Mr. Ellsworth was bound by the agreement to arbitrate: first, the contract itself, and second, Mr. Ellsworth’s participation in decision-making related to the contract.
I. THE APPEARANCE OF MR. ELLS-WORTH’S NAME ON THE CONTRACT DOCUMENTS, BY ITSELF, IS INSUFFICIENT EVIDENCE TO SHOW THAT HE ASSENTED TO THE AGREEMENT TO ARBITRATE
¶ 16 First, the district court relied on the actual contract in making its decision. Specifically, the court relied on the fact that Mr. Ellsworth was identified as an “Owner” and his residence was designated as the “Project.” We do not think that the mere fact that Mr. Ellsworth’s name appears on the cover page of the contract, without more, is sufficient to constitute assent to arbitrate with Lowell, especially when the contract was drafted by Lowell and unsigned by Mr. Ellsworth.
¶ 17 Moreover, the remainder of the contract makes the inclusion of Mr. Ells-worth’s name ambiguous. Any ambiguity in a contract is to be construed against the drafter, in this case, Lowell.
Nielsen v. O’Reilly,
¶ 18 We hold that the fact that a person’s name appears on a contract as a party to it, without more, is not direct and specific evidence that that particular person has assented to the agreement to arbitrate. In this case, it is thereforе insufficient as a matter of law to show that Mr. Ellsworth assented to an agreement to arbitrate.
II. MR. ELLSWORTH’S PARTICIPATION IN DECISION-MAKING RELATED TO THE CONTRACT DID NOT BIND HIM TO THE AGREEMENT TO ARBITRATE UNDER THE DOCTRINES OF NONSIGNA-TORY ESTOPPEL OR AGENCY
¶ 19 Of course, no signature is required for a person to become party to a contract.
Commercial Union Assocs. v. Clayton,
¶ 20 We do not believe that the non-signatory estoppel exception applies to Mr. Ellsworth. The rationale behind this excеption is that a nonsignatory should be es-topped from avoiding arbitration when the nonsignatory seeks to benefit from some portions of the contract but avoid the arbitration provisions.
Id.
at 418. In cases where es-toppel has been implemented
against a non-signatory,
the nonsignatory has sued a signatory on the contract to his benefit but sought to avoid the arbitration provision of the same contract.
12
See Bridas S.A.P.I.C. v. Gov’t of Turkm.,
¶ 21 Furthermore, Mr. Ellsworth is not bound to the arbitration agreement through the nonsignatory theory of agency. There is no evidence that Ms. Naylor had the authority to act as an agent for Mr. Ells-worth.
13
Mr. Evershed does not explicitly claim in his affidavit that he ever believed that Ms. Naylor had an agent’s authority. Even if Lowell believed this, there is a lack of evidence of any conduct by Mr. Ellsworth or Ms. Naylor which might have led to that conclusion. Instead, Mr. Ellsworth claims that the couple made no representation to Lowell that Ms. Naylor had an agent’s authority. “ ‘[T]he [spouse’s] authority to act for [the other spouse] is not implied from the marital relation, nor from the mere fact that
*990
he occupiеd, or managed and controlled, [the other spouse’s] property....’”
Macris v. Sculptured Software, Inc.,
¶22 Finding no nonsignatory estoppel as relied on by the district court and, further, finding no evidence of an agency relationship between the spouses, we conclude that the district court erred in finding that Mr. Ells-worth participated in the contract in a manner that would manifest his assent to the arbitration agreement.
CONCLUSION
¶ 23 The facts of the case, even as alleged by Lowell, do nоt indicate direct and specific evidence of an agreement to arbitrate. Mr. Ellsworth’s name on the contract documents alone is insufficient evidence of his assent to arbitration. Additionally, any participation by Mr. Ellsworth was insufficient to bind him to the agreement to arbitrate under the theories of nonsignatory estoppel or agency. The district court erred in granting summary judgmеnt for Lowell Construction Company and dismissing Mr. Ellsworth’s complaint. Mr. Ellsworth is entitled to judgment as a matter of law, and the decision of the district court is reversed and the case remanded.
Notes
. The sole issue before this court concerns the forum that dispute resolution should take between Mr. Ellsworth and Lowell. Any othеr questions regarding contractual obligations outside this narrow issue are not before us.
. The marriage is now dissolved.
. Mr. Ellsworth states in his affidavit that the insurance policy was "never in [his] name” and that he believes it “remained in the name of Ms. Naylor's deceased husband, Douglas.”
. Mr. Evershed is a representative and principal of Lowell.
. The parties dispute the facts surrounding a previous draft of the agreement, which Lowell claims misidentified Mr. Ellsworth's first name. In his affidavit, Mr. Evershed claims that the mistake was corrected when brought to his attention by Mr. Ellsworth and Ms. Naylor. In his own affidavit, Mr. Ellsworth denies that he said anything to Mr. Evershed about the error.
. The contracts differ as to material terms such as the specific tasks to be performed, the dates of performance, and the provisions for payment of costs. However, the remainder of the contracts apparently сome from the same form contract.
.Lowell asserts that the discrepancy in the quoted and actual costs, as well as the failure to deliver invoices and supporting documentation to Ms. Naylor and Mr. Ellsworth, is the result of active fraud and concealment by Mr. Ellsworth. Mr. Ellsworth denies this.
. Mr. Ellsworth’s claims against Ms. Naylor and her counterclaims against him were dismissed by stipulation of the parties in April 2005. Mr. Ellsworth also voluntarily dismissed his claims against the AAA.
. Mr. Ellsworth joined Ms. Naylor's motion to stay arbitration.
. We believe that in finding this fact, the district court erred since summary judgments should not resolve factual disputes.
Schurtz v. BMW of N. Am. Inc.,
.Mr. Ellsworth correctly points out that the nonsignatory estoppel exception has never been applied in Utah. Nevertheless, we know of no reason why it could not be, in the apprоpriate situation.
Traditionally, five theories for binding a non-signatory to an arbitration agreement have been recognized: (1) incorporation by references; (2) assumption; (3) agency; (4) veil-piercing/alter-ego; and (5) estoppel.
Int’l Paper Co. v. Schwabedissen Maschinen & Anlagen GMBH,
. Another variety of nonsignatory estoppel is that enforced
by a nonsignatory
when the signatory plaintiff sues a nonsignatory defendant on the contract but seeks to avoid the contract-mandated arbitration by relying on the fact that the defendant is a nonsignatory.
Bridas,
. The parties briefed the agency issue from this point of view — Ms. Naylor as the agent of Mr. Ellsworth. We note that the result would be the same regardless of which spouse we consider the agent.