Elizabeth Gamble Deaconess Home Ass'n v. Turner Construction Co.Elizabeth Gamble Deaconess Home Ass'n v. Turner Construction Co.
I
Plaintiff is a charitable, nonprofit corporation that owns and operates The Christ Hospital in Cincinnati. On December 12, 1962, it entered into a written agreement for “future projects and studies” with Harry Hake & Harry Hake, Jr. and Associates, Architects (hereafter referred to as “Hake,” intending to include also the other two defendants who successively engaged in rendering architectural services). The agreement was in the form of a letter that specifically incorporated the terms of the printed Standard Form of Agreement Between Owner and Architect (AIA Document B-131, 1961 Edition). The Standard Form provides,
inter alia,
for “Basic Services of The Architect,” and in paragraph C I (4) (c)
2
for the responsibilty of the architect during the construction phase of the project. Under this architectural contract, Hake made certain recommendations at plaintiffs request about the construction of a twelve hundred car garage on the hospital premises, and these having been approved, Hake prepared the necessary “contract documents” (drawings and specifications) for the construction. On May 15, 1967, plaintiff entered into a construction contract with defendant Turner Construction Company (hereinafter referred to as “Turner”) using the Standard Form of Agreement Between Owner and Contractor (AIA Document
Early in 1978, plaintiff’s employees noticed that some concrete surfaces were deteriorating excessively fast. Plaintiff determined that chloride-induced corrosion was the cause of the deterioration, accelerated by the installation of inadequate concrete cover over the steel reinforcing bars and by the application of high porosity concrete. Approximately ten percent of the garage was adversely affected, and plaintiff alleges that the useful life of the garage was reduced from forty to fourteen years. The record does not reveal what, if any, efforts were made to correct the condition or to settle the responsibility for it.
On May 6, 1982, or approximately fourteen years and one month after the garage had been completed, plaintiff filed the instant complaint against Turner and Hake, alleging four separate claims against Turner and two against Hake. The four claims against Turner are: breach of the express promise in the construction contract to comply with the contract documents; breach of express warranties; breach of three implied warranties, i.e., that materials would be fit for the intended use, that the garage would be constructed in a workmanlike manner, and that it would be reasonably fit for its intended purpose over a reasonable life; and negligence in construction of the garage. The two claims against Hake are breach of the express terms of the architectural contract, and negligence in failing to furnish effective supervision over Turner’s construction. Plaintiff demanded damages of $6,050,000.
Hake filed a motion to dismiss on grounds the suit was not filed within the ten-year bar of
On appeal, plaintiff presents three assignments of error: first, that the court erred in not finding
II
To state succinctly our decision about the issues underlying the second assignment of error, we hold that
We note, first, that the bar of the statute is not against the bringing of a suit, but against the continuance of the right to sue. The claims to which the statute applies cease to exist after the ten-year period. The statute provides an absolute nullification of the right to sue. See
Kittson County
v.
Wells, Denbrook & Associates, Inc.
(1976),
Turning to the language of the statute, we note that the actions which it bars are those for damages for injury to person or property arising out of the defective and unsafe condition of an improvement to real property, and that the statute does not bar actions against those persons in actual possession and control of the real estate improvement at the time the defective and unsafe condition constitutes the proximate cause of the claimed injury. These are terms generally (if not exclusively) used in the definition and description of torts; they are not normally employed in contract or warranty law. This language demonstrates to us an intent to limit the bar to actions in tort.
Further, while we have no legislative history to help us interpret the statute, we can note, as other courts have, that a wave of political pressure caused the adoption of statutes of limitations or statutes of repose barring damage claims against architects, engineers and builders.
E. A. Williams, Inc.
v. Russo
Development Corp.
(1980),
“* * * These statutes resulted from pressures brought to bear upon state legislatures by the architectural profession and construction industry after a major extension of their potential liability. The shelter of the privity of contract doctrine, which insulated architects and braiders from liability to third parties long after the doctrine’s demise in manufacturers’ product liability cases, was shattered in the early 1960’s.”
This suggests that the design of the statute was to limit actions in tort.
Finally, we note that the Ohio Legislature did not use language that would have expressly brought actions in contract within the ambit of the statute. Other jurisdictions have expressly included contractual claims. See, e.g., New Jersey Stat. Ann., Cum. Supp., Section 2A:14-1.1; Kentucky Rev. Stat. Ann., Section 413.135; Minn. Stat., Section 541.051, Subdivision 1. The Model Statute endorsed by the American Institute of Architects in 1967 quite clearly bars actions “whether in contract (oral or -written, sealed or unsealed), in tort or otherwise.” The absence of any specific reference to contract actions adds strength to our conclusion that the Ohio statute applies only to actions in tort.
Our decision is in agreement with those of other courts; see
Securities-Intermountain, Inc.
v.
Sunset Fuel Co.
(1980),
Rights enforceable as torts differ from rights enforceable as contracts both in the nature of the interest protected and in the origin of the duties and rights that are enforceable at law. “Tort actions are created to protect the interest in freedom from various kinds of harm. * * * Contract actions are created to protect the interest in having promises performed.” Prosser, (4 Ed. 1971) 613, Section 92. Torts are based on duties of conduct that are imposed by law, stem from general social policy, and protect all persons within range of the harm or injury to be anticipated from a breach of the duty of conduct. Contractual duties, on the other hand, arise from the specific agreement of the parties and are owed only to those who exchange the promises contained in the
Turning to plaintiffs complaint in this appeal, those claims that arise
ex contractu
are governed by the fifteen-year limitation of
The claims that are clearly
ex delicto
on the face of the complaint are: the fourth, for negligent construction by Turner proximately causing damage; and the sixth, for negligent supervision by Hake proximately causing damage. Without deciding at this time whether these negligence claims can be pursued simultaneously with and alternatively to the contract claims, they fall within the contemplation of
The third claim of plaintiffs complaint is addressed to breaches of three implied warranties. We believe that none of these claims is valid. Breach of an implied warranty that materials incorporated into the construction would be fit for their intended purpose has no application because the “goods” (being the materials incorporated in the garage) were not sold to plaintiff as “goods,” but were incorporated in an improvement to plaintiffs real estate in accordance with the construction contract. Under the definition of “goods” in
Breach of an implied warranty of construction in a workmanlike manner is an action
ex delicto
and barred by
Finally, there is no such claim in Ohio as one for breach of implied warranty that a real property structure, when completed, will be suitable for its intended purpose.
Mitchem
v.
Johnson
(1966),
The second assignment of error has merit insofar as it is directed at .dismissal of the first, second and fifth claims under the bar of
Ill
In its third assignment of error, plaintiff claims the trial court erred in holding that its decision was controlled by
Strauss.
We agree, because
Strauss
is distinguishable on the facts. In that case, the gravamen of the complaint as interpreted by the appellate court was to assert a claim of negligence. As illustrated by
Hibbett
v.
Cincinnati
(1982),
In the complaint
sub judice,
on the other hand, plaintiff has clearly stated separate and distinct claims, some
IV
In the first assignment of error, plaintiff argues that
The nullification effect of
We find no merit in the first assignment of error and hold that
Plaintiff does not convince us that the statute violates its rights of equal protection. Assuming
arguendo
that plaintiff has standing to raise the issue of whether the statute protects certain persons unfairly while it withholds the same protection from others, we believe the test to be applied for equal protection purposes is the “rational basis” test. The “strict scrutiny” test is not applicable, because plaintiff is not a member of a specially protected “suspect class,” to use the shortcut language now in vogue, nor is plaintiffs right to sue architects and builders in tort a “fundamental right.” Applying the “rational basis” test, we hold that the favored treatment given to architects, engineers, builders and others was justified. The legislature rationally intended to limit the tort liability of those potential defendants whose exposure to claims was excessively broad, considering recent changes in negligence law such as the elimination of the “privity of contract” defense and the accrual of actions upon discovery of injury,
8
when weighed against the lack of control over the possession of improvements, the unsafe condition of which caused the injury. We will not detail our reasoning further, and adopt the reasoning admirably set forth in
Yarbro
v.
Hilton Hotels Corp.
(Colo. 1982),
V
We reverse the judgment below insofar as it dismissed plaintiff s first, second and fifth claims under
Judgment reversed in part, affirmed in part, and cause remanded.
Notes
“No action to recover damages for any injury to property, real or personal, or for bodily injury or wrongful death, arising out of the defective and unsafe condition of an improvement to real property, nor any action for contribution or indemnity for damages sustained as a result of said injury, shall be brought against any person performing services for or furnishing the design, planning, supervision of construction, or construction of such improvement to real property, more than ten years after the performance or fur
Paragraph CI (4) (c) of the architectural contract reads in full:
“(c) The Architect will make periodic visits to the site to familiarize himself generally with the progress and quality of the work and to determine in general if the work is proceeding in accordance with the Contract Documents. He will not be required to make exhaustive or continuous on site inspections to check the quality or quantity of the work and he will not be responsible for the Contractors’ failure to carry out the construction work in accordance with the Contract Documents. During such visits and on the basis of his observations while at the site, he will keep the Owner informed of the progress of the work, will endeavor to guard the owner against defects and deficiencies in the work of Contractors, and he may condemn work as failing to conform to the Contract Documents. Based on such observations and the Contractors’ Applications for Payment, he will determine the amount owing to the Contractor and will issue Certificates for Payment in such amounts. These Certificates will constitute a representation to the Owner, based on such observations and the data comprising the Application for Payment, that the work has progressed to the point indicated. By issuing a Certificate for Payment, the Architect will also represent to the Owner that, to the best of his knowledge, information and belief based on what his observations have revealed, the quality of the work is in accordance with the Contract Documents. He will conduct inspections to determine the dates of substantial and final completion and issue a final Certificate for Payment.”
Professor Prosser gives the following examples at 613:
“If the defendant undertakes, for a consideration, to pay money to X, and fails to do what he has promised, there is an actionable wrong, not because the law obliges people to make such payments in general, but because he has manifested his consent to assume the obligation, toward X alone. The action in such a case is in contract. But if A negligently runs B down with his automobile, a cause of action arises, not because of any promise to refrain from the commission of the act, but because the law imposes upon A a duty, owed to anyone in his path, to refrain from inflicting such injuries. The remedy in such a case is in tort.”
“Except as provided in section 1302.98 of the Revised Code, an action upon a specialty or an agreement, contract, or promise in writing shall be brought within fifteen years after the cause thereof accrued.”
“An action for any of the following causes shall be brought within four years after the cause thereof accrued:
* *
“(D) For an injury to the rights of the plaintiff not arising on contract nor enumerated in sections 2305.10 to 2305.12, inclusive, 2305.14 and 1304.29 of the Revised Code.”
While the Supreme Court reserved the question of the applicability of
For purposes of this appeal, we assume that the due process and equal protection rights under the state and federal Constitutions are functionally equivalent. See
State, ex rel. Heller,
v.
Miller
(1980),
Prosser, Law of Torts (4 Ed. 1971) 680-682, Section 104.
The following state courts of last resort have upheld the constitutionality of similar statutes, under the provisions of the state constitution, the federal Constitution, or. both:
Arkansas
Carter
v.
Hartenstein
(1970),
Colorado Yarbro v. Hilton Hotels Corp., supra
Kentucky
Carney
v.
Moody
(1983),
Louisiana
Burmaster
v.
Gravity Drainage Dist. No. 2
(La. Í978),
Michigan O’Brien v. Hazelet & Erdal, supra
Minnesota
Calder
v.
City of Crystal
(Minn. 1982),
Mississippi
Anderson
v.
Wagner
(Miss. 1981),
Montana
Reeves
v.
Ille Electric Co.
(1976),
New Jersey
Rosenberg
v.
Town of North Bergen
(1972),
Oregon
Josephs
v.
Bums
(1971),
Pennsylvania
Freezer Storage
v.
Armstrong Cork Co.
(1978),
South Dakota
McMacken
v.
South Dakota
(S.D. 1982),
Tennessee
Harmon
v.
Angus R. Jessup Associates, Inc.
(Tenn. 1981),
Utah
Good
v.
Christensen
(Utah 1974),
Washington
Yakima Fruit & Cold Storage Co.
v.
Central Heating and Plumbing Co.
(1972),
Wisconsin
United States Fire Ins. Co.
v.
E. D. Wesley Co.
(1982),
So have the following intermediate appellate courts:
California
Salinero
v.
Pon
(1981),
Indiana
Beecher
v.
White
(Ind. App. 1983),
New Mexico
Howell
v.
Burk
(App. 1977),
North Carolina'
Lamb
v.
Wedgewood South Corp.
(1982),
Texas
Ellerbe
v.
Otis Elevator Co.
(Tex. Civ. App. 1981),
On the other hand, similar statutes were held to be unconstitutional in the following jurisdictions:
Alabama
Bagby Elevator and Electric Co., Inc.
v.
McBride
(Ala. 1974),
Florida
Overland Construction Co., Inc.
v.
Sirmons
(Fla. 1979),
Hawaii
Fujioka
v.
Kam
(1973),
Illinois
Skinner
v.
Anderson
(1967),
Oklahoma
Loyal Order of Moose, Lodge 1785 v. Cavaness
(Okla. 1977),
South Carolina
Broome
v.
Truluck
(1978),
Wyoming
Phillips
v.
ABC Builders, Inc.
(Wyo. 1980),
See, generally, Annotation (1979),