54 S.W. 798 | Tex. App. | 1899
Appellant instituted this suit against appellee to recover the sum of $1470.80 on an express contract for lighting the city for a period of three months. Appellee pleaded a general denial and that the motion authorizing the contract had been vetoed by the mayor, and that the city was not liable on the contract because it lacked mutuality, and was therefore void. The cause was tried by the court and judgment rendered in favor of appellee.
On the 26th day of January, 1899, appellant proposed to the city council, at a regular meeting thereof, to light the streets of El Paso upon certain terms for a certain time, and the proposition was referred to a committee which reported favorably upon it. "Whereupon it was moved and seconded that the report of the committee be adopted and the proposition be accepted, and that the mayor be authorized and instructed to enter into a contract with the El Paso Electric Light and Power Company under the terms and conditions of the proposition submitted by said company, for the term of five years." The motion was carried, and the following day a contract, prepared by the attorney of appellant, was signed by it and the mayor of El Paso. The contract is as follows:
"This contract, made and entered into this 27th day of January, 1899, by and between the city of El Paso, a municipal corporation, party of the first part, and the El Paso Gas, Electric Light and Power Company, a corporation duly incorporated under the laws of the State of Texas, party of the second part, witnesseth: That for and in consideration of $9.25 per light, per month, in cash, or its equivalent in city warrants, to be paid monthly, the said party of the second part agrees to furnish the city as many electric lights as the city may designate, of 1200 candlepower each, to be lighted and turned off by moon schedule. Said lights shall be placed at such places as the City of El Paso through its city council may direct; provided, however, that the said party of the second part shall not be compelled to run more than 990 feet of line between lights for more than 25 per cent of all lights ordered by the city, and for other lights not more than 660 feet of line between lights. It is further stipulated that said lights shall not be hung less than twenty-five feet higher than the grade of the street. The power of the lights shall be governed, tested, and regulated by any standard device for testing the same; and should said party of the second part fail to furnish 1200-candle power lights, a proper reduction shall be made in proportion to the power furnished; and should said second party fail for sixty days after notice to remedy said lights so as to have the same reach the standard of 1200-candle power, then the city shall, at its option, abandon said contract and terminate the same.
"This contract shall take effect and be in force from and after the first day of February, 1899, and shall continue in force for the term of five years from that date.
"It is further stipulated that lights shall be hung in the center of cross streets in all cases where, in the judgment of the city council, a *311 better result can be obtained than by hanging them at the corners of the streets. The party of the second part shall furnish all lights required after thirty days notice from the city council that such lights are desired and have been ordered; and the said second party further obligates itself to remove and replace all such lights as the city council may designate, the cost of such removal to be paid by the said party of the first part.
"In testimony whereof, the parties have hereunto set their hands and seals, this the date and day first above written, by virtue of resolutions upon the part of the representative body of each corporation. Signed and delivered in duplicate."
On the 31st of January the mayor wrote a message vetoing the motion authorizing the contract, on the grounds that it did not provide for reasonable rates to private parties, and that it was for too long a period. The message was submitted to the city council on February 2d, their action reconsidered, and the veto sustained by an unanimous vote. Prior to the making of the contract herein set forth appellant had furnished the city with lights at places designated by it, and for the months of February, March, and April appellant furnished the lights at places designated under former contracts, and on April 27th presented the account to the council for the amount sued for. The account was referred to the finance committee, which reported as follows:
"Your committee, to whom was referred the bills of the El Paso Gas, Electric Light and Power Company for the months of February, March, and April, beg leave to report as follows:
"If the said bills at their present figures are intended to be a voluntary reduction in the prices heretofore paid by the city and not presented in furtherance of the alleged contract heretofore vetoed by the mayor, we recommend that they be paid, with the express understanding, however, that such payment shall not in any way be considered as a recognition of the validity of said contract, nor of its ratification, nor of its existence by this council. Should this not be acceptable to the parties interested, we suggest that they may be allowed to withdraw said bills and present others if they see fit to do so."
The report was adopted. Appellant knew of the action of the mayor in vetoing the resolution authorizing the contract, and knew the council had sustained his action.
The charter of El Paso provides that: "All ordinances and resolutions adopted by the council shall, before they take effect, be placed in the office of the city clerk, and if the mayor approve thereof he shall sign the same, and such as he shall not sign he shall return to the city council with his objections thereto." Five days are given in which the veto power can be exercised.
As above noted, the report of the committee appointed to consider the proposition made by appellant to light the streets was adopted upon a motion, and, although there is no proof to the effect that it was *312
verbal and not in writing, it has been treated by both parties as though it was not in writing, and will be viewed in that way by this court. It is the contention of appellant that being merely a verbal motion, the approval of the mayor was not necessary, and that he had no power or authority under the charter to veto the action of the council, as that instrument authorized the veto of ordinances and resolutions, and not verbal motions. Under the provisions of a charter almost identical, as to the veto power granted to the mayor, the Supreme Court of Texas in the case of the City of Galveston v. Morton,
We will view the case, however, as though every formality essential to the execution of the contract had been strictly complied with, and that the mayor had no power or authority to veto the action of the city council, and look to the contract itself to ascertain whether the city is liable thereon or not. It is provided in the contract that appellant shall furnish such lights "as the city may designate," to be "placed at such places as the city of El Paso, through its city council, may direct." To render this contract effective and operative, it was essential that the city should in some way make the designation provided therein, and it is not contended by appellant that it had any vitality or force until there was such designation directly or impliedly by the city council. We think this clear, and that there was a lack of mutuality in the contract until the city council had, in some manner, designated the number of lights and their location. In an Illinois case in which a lumber company had agreed to buy from a coal company "its requirements of anthracite coal for season of 1886-1887," it was held by the court that the word "requirements" in the connection used meant "needs," and that the contract was enforceable, but it said: "If the word `requirements' as here used is so interpreted as to mean that appellee was only to furnish such coal as appellant should require it to furnish, then it might be said that appellant was not bound to require any coal unless it chose, and that therefore there was a want of mutuality in the contract." Lumber Co. v. Coal Co., 43 N.E. Rep., 774.
In the case of Railway v. Dane, 43 New York, 240, defendant had, by letter, offered to take iron from plaintiff and transport it on specified terms. The latter answered assenting to the proposition. Some time afterward the plaintiff offered iron for transportation, and it was held that because there was no promise to present coal for transportation, there was a lack of mutuality in the contract, and it could not be enforced. This case is cited and approved in Railway v. Scott,
In the case of Vogel v. Pekoc, 42 Northeastern Reporter, 386, decided by the Supreme Court of Illinois, the contract was as follows: "The said parties of the first part agree to employ the said party of the second part to perform such work as they may assign to him from time *314 to time, such service to continue only so long as satisfactory to the said parties of the first part." The court said: "We think it is plain that the parties of the first part were not bound under the terms of the contract to employ the party of the second part for a single day or hour, and, if they had absolutely refused to employ him, he was without remedy in any court of the country."
The intention of the parties to be bound by the contract may be presumed, but that should not influence the action of a court in passing upon the validity of the contract. Courts can give effect to the intention of parties only through the words used by them, and can not make a contract for them. Railway v. Bagley (Kan.), 56 Pac. Rep., 759.
It may be said that the words "may designate" and "may direct" are imperative, and require the city council to take such action, but if the contract is so construed, how many lights is it the duty of the city to designate? Shall it be the number that is necessary for the proper lighting of the city, or the number that it had used prior to the making of the contract in question? Suppose appellant, upon refusal of the city council to abide by the contract, had instituted a suit for damages arising from a breach of the contract, upon what basis would they be calculated? What would be the measure of the damages? No number of lights being designated, there would be no measure of damages. "When no breach of a contract could be assigned which could be compensated by any criterion of damages to be furnished by the contract itself, the contract is void for uncertainty." Howard v. Railway (Ala.), 18 So. Rep., 868; Pulliam v. Schimpf (Ala.), 19 So. Rep., 428.
The city council having not only failed to designate the number and location of the lights, but absolutely repudiated the contract, it is not enforceable, unless this court should hold that it can act in lieu of the council and make the designation, or unless the fact that the lights were not forcibly torn down by the city authorities is to be construed into a designation under the contract.
While the contract, if valid, could not be affected by any act of repudiation upon the part of the city (Beach, Modern Law of Contracts, sections 1143, 1144, and notes), still, under the circumstances of this case, the action of the council in repudiating the contract notified appellant not only that appellee had not made a designation under the contract, but that it absolutely refused so to do. We can not accede to the proposition that, because appellee had been using a certain number of lights of appellant, and did not, after February 1, 1899, have the posts removed and the lamps taken down, this constituted a designation. The city having informed appellant that no designation, under the contract, would be made, and the contract failing in case of no designation, appellant can not with any force or merit insist that because the city had once made a designation of a certain number of lights under a former contract, it would be held to such designation under a new contract. *315
It follows from what has been written that, as the contract was incapable of enforcement, it was not error to cancel it.
The question of quantum meruit does not arise in this suit, the demand being based upon an express contract.
The judgment is affirmed.
Affirmed.
Overruled.
Writ of error refused.