OPINION OF THE COURT
Appellants Edward and Deborah LeJeune appeal from the district court’s grant of summary judgment for the Appellees Bliss-Salem, Inc. and General Electric Co. 1 The Le-Jeunes brought this negligence and strict products liability action against Appellees when Mr. LeJeune was injured while working on a piece of machinery Appellees had repaired. For the reasons that follow, we affirm the district court.
*1071 I.
Mr. LeJeune, a Pennsylvania resident, worked at a Delaware steel mill as an “oiler” or “lube man.” As such, he was responsible for checking the oil and lubrication of various machines. Mr. LeJeune’s accident occurred on a piece of machinery known as a “table.” Tables consist of a frame which holds large steel cylinders weighing two to five tons each. The cylinders, powered by motors, are rotated in order to transport hot steel slabs from one processing machine to another. Gaps, approximately two inches in width, exist between cylinders. Mr. LeJeune, believing a certain table was deactivated, jumped on top of the cylinders in order to do his maintenance work. The cylinders were activated, and, as they began to roll, Mr. Le-Jeune was caught in the gap between them. His injuries were serious and extensive.
Appellees’ involvement with the steel mill began when CitiSteel, the owner of the mill, hired Appellees in 1988 to refurbish the steel mill machinery. The mill had been shut down for two years and had deteriorated into a serious state of disrepair. General Electric employees were on-site for eight months repairing equipment. Some refurbishing work took place at a General Electric shop in Pennsylvania. Bliss-Salem performed most of its refurbishing work at its Ohio plant. Appellees finished their work at the steel mill approximately three years before Mr. Le-Jeune’s accident occurred.
Basing their claim on tort theories of negligence and strict products liability, Appellants argue that the contracts between CitiSteel and Appellees created a duty requiring Appellees to redesign the steel mill equipment, eliminating any safety problems. They argue that this duty included a duty to warn of any hazards inherent in the machinery. Appellees argue that the contracts simply required them to put the mill machinery back into working order and that any duty on their part did not extend to reevaluating the safety aspects of the various machinery involved.
II.
Before we address the tort issues in this case, we must first decide which state’s law applies. In choosing which law applies, a federal court sitting in diversity must apply the choice-of-law rules of the forum state.
Klaxon v. Stentor Electric Mfg. Co.,
Pennsylvania choice-of-law analysis consists of two parts. First, the court must look to see whether a false conflict exists. Then, if there is no false conflict, the court determines which state has the greater interest in the application of its law.
See Cipolla v. Shaposka,
On the other hand, Delaware’s interests would be impaired if Pennsylvania law were applied. Delaware has an interest in prescribing the rules governing torts occurring nonfortuitously within its borders. Under Pennsylvania choice of law analysis, a false conflict exists “where the accident is fortuitous and the state where the accident occurred has no interest in the regulatory standard at issue.”
Reyno v. Piper Aircraft Co.,
Here the occurrence of the accident in Delaware was not fortuitous. Delaware was the site of the accident (as well as the place where much of the alleged negligent conduct took place) because of the steel mill’s fixed location in that state. If Pennsylvania law were applied, Delaware’s interest in regulating purposeful economic activity within its borders would be impaired. We cannot agree with Appellants’ assertion that Delaware has no interest in this case simply because Appellees have limited contacts with that state. A state’s interest in enforcing its tort law is not constrained to protecting residents from harm or suit.
See Schmidt v. Duo-Fast, Inc.,
No. 94-6541,
We must next examine which state has a greater interest in having its law applied. In making this determination, we look
to see what contacts each state has with the accident, the contacts being relevant only if they relate to the “policies and interest underlying the particular issue before the court.” When doing this it must be remembered that a mere counting of contacts is not what is involved. The weight of a particular state’s contacts must be measured on a qualitative rather than quantitative scale.
Cipolla v. Shaposka,
III.
Applying Delaware law, we can immediately dispose of Appellants’ product liability claim. Appellants’ claim fails because Delaware does not recognize strict products liability.
Cline v. Prowler Indus. of Maryland, Inc.,
Before addressing section 404, we point out that the Delaware Supreme Court has never addressed the applicability of this particular section of the Restatement Second of Torts. We do not need to decide, however, whether the court would adopt the section because, even assuming that it would, we do not believe it creates a duty in this case. Section 404 provides:
One who as an independent contractor negligently makes, rebuilds, or repairs a chattel for another is subject to the same liability as that imposed upon negligent manufacturers of chattels.
Although this language sweeps broadly, it does not impose liability on an independent contractor for work which the independent contractor did not undertake to perform. See section 404 Comment a (independent contractor required to do competently everything “which he undertakes____”). Rather, it is the scope of the undertaking, as defined in the contract, which gives shape to the independent contractor’s duty in tort.
Appellants argue that the contracts entered into by Appellees required them either to warn of safety defects in the machinery or to redesign the machinery in such a way as to eliminate potential hazards. Appellants point to broad language in the contracts such as “General Electric will check the delineated apparatus, analyze, and report findings” and “[wjhereas [CitiSteel] desires to refurbish and revamp the equipment ... and [Bliss-Salem] is qualified and willing to do the work as specified....” App., Vol. II, at 583 (General Electric contract); id. at 628 (Bliss-Salem contract). In particular, Appellants make much of the term “revamp” in the contract. Because Webster’s Unabridged Dictionary defines that term as “to renovate, redo, or revise,” they argue, Appellees assumed a duty to redesign defective parts of the plate mill. However, not only does “renovate, redo, or revise” not necessarily mean “redesign,” our version of Webster’s lists “to put in repair” as the first definition of “revamp.” This definition is entirely consistent with Appellees defense: that their undertaking was limited to “repairing” the mill. In any event, the contract simply states, as a preamble, that Appellant “desires to refurbish and revamp the equipment.” The scope of work that Appellee (as opposed to Appellant) agreed to undertake (as opposed to merely desired) is described later in Article I.
The contracts contain, moreover, ' much more specific language indicating that Appellees were hired to do repair work only. Each contract fills several pages with detailed descriptions of repair work for each machine. For example, the General Electric contract provides the following “scope” for repair of a water pump:
External aluminum oxide blast clean.
Disassemble, clean & visual plus dimensional inspection.*
Assemble (new bearings, gaskets, “O” rings, bolts).
Report.
App., Vol. II, at 589 (General Electric contract). The Bliss-Salem contract is full of similar language. Appellants do not point us to any language in the contracts which specifically required Appellees to redesign a machine or to warn of safety defects. Although the Bliss-Salem contract does contain a few provisions which call for the redesign of particular machine parts, Appellants have failed to alert the court to any provisions which required the redesign of the machinery involved in Mr. LeJeune’s accident. No language in either contract specifically addresses the safety aspects of any piece of machinery. Thus, it is clear from reading the contracts that Appellees undertook to repair rather than redesign the steel mill machinery.
Appellants also attempt to show that Appellees undertook to do more than simple repair work by citing to the following deposition excerpt of Mr. Hearn, a CitiSteel official:
*1074 Q. Now let me ask you if the original specification was deficient, would you expect the contractor to tell you that?
A. Yes. If there was something deficient about a piece of equipment, I would expect somebody to tell me. I’m not an engineer myself. And if we sent a piece of equipment out to Bliss or GE was here and they saw something and said, “Joe, this is not designed correctly, we recommend you don’t do this,” fine, I listen.
App., Vol. I, at 176 (Hearn deposition excerpt). This statement is at best ambiguous concerning Appellees’ supposed duty to redesign and warn about safety aspects of the machinery. In fact, Mr. Hearn also stated in his deposition that Appellees were not required to evaluate safety procedures and were only required to bring machinery back to its original working order. Id. at 172-73. Even were we to construe Mr. Hearn’s statement as Appellants’ wish, it would be clearly contradicted by the clear intent of the parties as expressed in the contracts themselves. Mr. Hearn’s statement does not change the fact that the contracts did not require Appellees to concern themselves with safety design. Due to the limited nature of the contractual undertaking in this case, no duty in tort arose on the part of Appellees to redesign safety features of the equipment or to warn of potential hazards.
Even where the scope of an independent contractor’s undertaking does not give rise to liability for design problems in a product, a duty may still arise if the product is “so obviously bad that a competent contractor would realize that there was a grave chance that his product would be dangerously unsafe.” Section 404 comment a. Appellants argue that General Electric was aware of the safety problems inherent in the machinery they were fixing. They point to the fact that an accident similar to Mr. Le-Jeune’s almost occurred while General Electric employees were testing equipment. General Electric averted an accident by simply looking to see if anyone was on the equipment before energizing it. We do not believe that this single incident, in which no accident occurred, was so “obviously bad” that it would give rise to a duty not contemplated in the original contract.
The judgment of the district court will be affirmed.
Notes
. Appellants do not appeal from the district court's grant of summaiy judgment for Appellee E.W. Bliss Co.