Dr. And Mrs. Robert A. Katsev v. William T. Coleman, Jr.Dr. And Mrs. Robert A. Katsev v. William T. Coleman, Jr.
Plaintiffs, named individuals on behalf of themselves and a loosely designated class residing in or near the site of the proposed continuation of highway U-725, an innerbelt freeway in St. Louis County, Missouri, appeal from the District Court’s 1 grant of summary judgment denying declaratory and injunctive relief in their attempt to halt construction of a segment of U-725. Defendants are the Secretary of Transportation, United States Department of Transportation (DOT), the Missouri regional administrator of the Federal Highway Administration (FHWA), the Missouri State Highway Commission (MSHC), and the MSHC’s Chief Highway Engineer.
Construction of highway U — 725 was instituted following a St. Louis County bond issue in 1955. The project in 1967 was incorporated into the MSHC’s federal-aid highway program. When completed, the freeway will connect U.S. Highway 40 on the south with interstate highway 1 — 270 on the north, intersecting Pаge Avenue, Natural Bridge Road and other east-west arteries. The section from the Highway 40 southern terminus to Page Avenue, approximately one-half of the freeway, has been completed. The remaining stretch of 6.6 miles will be constructed in two segments, а “southern” (Page Avenue to Natural Bridge Road) and a “northern” (Natural Bridge Road to 1-270). Plaintiffs’ complaint concerns only the southern segment.
In the original three-count complaint filed September 27, 1974, plaintiffs alleged (I) that the federal defendants violated рrovisions of the National Environmental Policy Act of 1969 (NEPA),
This matter was set for trial on February 18, 1975, but the parties then agreed that the case would be submitted on defendants’ motion for summary judgment, a stipulation of some 70 facts, memoranda and extensive exhibits. On March 26, 1975, in an unreported memorandum opinion, the District Court granted summary judgment without certifying the plaintiff class, holding that the defendants had complied with all applicable statutes and regulations. In the same opinion, the court denied plaintiffs leave to amend their complaint, requested March 17, 1975, for the reason that it was requested too late (one month after submission) and would be contrary to the interests of justice. 2
At the outset, it is apparent that the plaintiffs’ two contentions of noncompliаnce with NEPA are not properly before this court for appeal. Conse-
quently, we will not consider them except to note in passing their equally apparent lack of merit. Plaintiffs’ first contention, now moot, is that the EIS should have been filed before corridor approval was obtained on February 5, 1970. This contention is identical to the first claim they sought to raise in their amended complaint and was rejected by the District Court without reaching the merits. Plaintiffs have failed to appeal from the court’s adverse ruling on their attempt to amend — a ruling that we believe was fully justified by the untimeliness of the request.
See, e. g., Inland Container Corp. v. Atlantic Coast Line R. R.,
The only issue properly before this court on appeаl is whether the defendants have complied with the provisions of the URA requiring the state, prior to federal approval, to provide “satisfactory assurances” that adequate relocation assistance and replacement dwellings will be available for displaced persons,
Our review of the record convinces us that the District Court’s finding is correct. The state prepared an extensive relocation plan. As of the date the ease was submitted to this court, the MSHC had relocated 312 persons, moved 105 homes and relocated 4 businesses from the southern segment. Almost 1,300 persons and 415 residences have been rеlocated from the northern segment. In preparing the study, the state defendants interviewed relocatees and tabulated their needs, conducted a spot check of 5 percent of the available housing in the area and considered the availability of financing. The facts outlining the state’s activities complying with the URA were not in dispute and they adequately supported the District Court’s holding, properly made in the form of a summary judgment.
7
With respect to the federal defendants, the District Court reasonably сoncluded that the Secretary’s implicit acceptance of the state’s assurances as “satisfactory” had a factual basis.
The judgment of the District Court is affirmed.
Notes
. The Honorable John K. Regan, United States District Judge for the Eastern District of Missouri.
. Plaintiffs sought to delete cеrtain claims and add others to their complaint. As amended, the complaint in its entirety would have challenged (1) the defendants’ failure to file the EIS prior to obtaining location approval for the southern segment on February 5, 1970; (2) their failure to submit a “design study report” on the
northern
segment prior to obtaining design approval on January 29, 1971; and (3) their failure to conduct a separate public de
. The Act provides in relevant part:
Notwithstanding any other law, the heаd of a Federal agency shall not approve any * * * contract * * * with * * * a State agency, under which Federal financial assistance will be available * * * [for] any program or project which will result in the displacement of any person on or aftеr January 2, 1971, unless he receives satisfactory assurances from such State agency that' — •
(1) fair and reasonable relocation payments and assistance shall be provided to or for displaced persons * * *;
(2) relocation assistance [information and advisory] programs * * * shall be provided to such displаced persons;
(3) within a reasonable period of time pri- or to displacement, decent, safe, and sanitary replacement dwellings will be available to displaced persons * * *. (Emphasis added.)
. On the merits, as defendants note, it is not surprising that the EIS was nоt written prior to February, 1970, as NEPA did not come into effect until one month before, January 1, 1970. The first draft of the EIS covering both the northern and southern segments was submitted for review in April, 1971; the final draft was submitted to the FHWA in February, 1972, and was finally accepted by DOT on July 9, 1974. Defendants contend that the plaintiffs’ claim was mooted by the filing of the EIS, since the only relief that would have been available had no EIS been written would have been an injunction halting work until the EIS could be filed.
Moreover, in response to the claim that late preparatiоn rendered the EIS no more than a collection of post hoc rationalizations for decisions already made, defendants contend that NEPA’s purposes are yet being served in the instant case. The federal government will not be contractually оbligated to reimburse the state for the project until the segment receives “plans, specifications and estimates” (PS&E) approval.
Lathan v. Brinegar,
. The plaintiffs raised the point during oral argument in the district court to support their primary argument that the federal defendants had improperly delegated to the state the task of preparing the EIS — an argument now abandoned.
See, e. g., Iowa Citizens for Environmental Quality, Inc. v. Volpe,
. The defendants note that the Terminal Railroad alternative was in fact discussed in the EIS, albeit not in the Section titled “alternatives,” discussing five other possible routes. In the circumstances, the railroad alternаtive was sufficiently described.
Iowa Citizens for Environmental Quality, Inc. v. Volpe,
The EIS lists several reasons why the Terminal Railroad route is not feasible: the right of way is too narrow to accommodate the freeway; it would require two additional sharp curves in the roadway; it would require as many propertiеs to be taken as would any of the other alternatives; and approximately 1000 feet of freeway already constructed would have to be abandoned. The state engineers rejected this alternate route as palpably unreasonable in view of comparative right of way and construction costs, design configurations, and safety requirements.
. The plaintiffs’ claim that members of the class living in mobile homes must be relocated to other mobile home sites in the same county (where space fоr such housing is extremely scarce) finds no support in the statute. The purpose of the URA is to provide for “fair and equitable treatment of persons displaced * * *