110 A. 415 | R.I. | 1920
This is an action in assumpsit to recover the value of work done in the city of Providence by the plaintiff for the defendant. The parties signed a written contract by which the plaintiff agreed to perform the work specified therein, and in accordance with special plans prepared in connection with the repairs to a house and cellar, and "the work shall be built in accordance with the specifications and designations marked on said plan." The plan specified the width of the walls to be built. The plaintiff commenced the performance of the work required under the contract by digging the cellar and getting ready to put in the cement walls of the width required by the plan, when Lemuel O. Phillips, an assistant inspector of buildings of the city, inspected the premises and, not being satisfied with the firmness of the soil beneath the proposed walls, stopped the work unless the parties interested had a footing wall put under the cement walls, or dug deep enough to get down to a solid foundation. The assistant inspector gave the plaintiff a sketch of the footing wall required, showing it to be one foot thick and four feet wide, and as the construction of such a footing wall would cost a substantial sum of money the plaintiff declined to proceed with the work unless the defendant agreed to pay him the extra cost. The defendant would not agree to pay the plaintiff the cost of this additional work and the plaintiff, being unable to proceed with the work he had contracted to perform, on account of the order of the assistant building inspector, abandoned the work, and brought this action to recover compensation for the work already done and the materials supplied. The plaintiff admitted that he had received one hundred dollars on account and claimed a balance due of one hundred eleven dollars. The jury returned a verdict for the plaintiff in the sum of one hundred thirty-one dollars and fifty-five cents, which included three years' interest on the sum claimed by the plaintiff. The defendant duly filed her motion for a new trial and after hearing, the motion was denied by the trial justice. The defendant then duly brought the case to this court by her bill of exceptions. *80
The second exception is to that portion of the charge wherein the court said that "the plaintiff claimed that he was notified that he must either put a broad stone foundation under the wall, or else dig a foot deeper than the plan called for, or otherwise not build at all. Now if that was the act of the City, and not wilfully caused by the plaintiff, he would have a right to abandon the contract, and having abandoned it, he would have a right to recover the reasonable value of what he had previously done and which had not been paid for." This was a correct statement of the law applicable to the case, as it is well established that the performance of a contract cannot be compelled where it would involve a violation of law. 13 Corp. Jur. Sec. 720, page 646. The defendant cites the case of Ford Denning v. Shepard Co.,
All of the defendant's exceptions are overruled and the case is remitted to the Superior Court with direction to enter judgment for the plaintiff upon the verdict.