58 Iowa 86 | Iowa | 1882
I. When this cause was before in this court, we decided that defendants’ dam does interfere with plaintiff’s right, to the fall of the river and free use of the water-power utilized at its mill, and that it ought to be so far abated that it would cease to obstruct the natural flow of the water from defendants’ tail-
“ Decree for plaintiff (on procedendo from Supreme Court, and in accordance with the opinion on file) that it, plaintiff, is entitled to the fall in the Upper Iowa river as far down as the mouth of Spring Branch, below plaintiff’s mill; that'-the dam of defendants be abated so that it shall cease to interfere with the j>ower of plaintiff as above established. "Writ of abatement to issue directing such abatement; the extent of such abatement to be practically determined by the sheriff at an ordinary stage of water, for which purpose the sheriff may call to his assistance a competent engineer; the sheriff to report his doings to the court upon said writ at next term of the court.
“ If either party desires, they shall have the right to take exception to his action in relation to such abatement, either on account of the allowance made by him for the varying stages of water that may be reasonably expected, or for any other reason, having regard to the extent of such abatement, and introduce evidence in regard to the extent of such abatement, and the court to make such order or decree, either increasing or modifying the extent of such abatement, as the evidence, etc., will warrant, with all the rights of appeal in relation to such decree applicable to an ordinary decree of this court in equity. Decree also that plaintiff is entitled to maintain its race where now located against all persons except
On the 27th day of March, 1879, after the filing of the procedendo, a decree in the following language was entered, pursuant to the foregoing stipulation.
“ 1. That as against the defendants John Greer and James Hunter, the plaintiff is entitled to and is the owner of all the head and fall in the Upper Iowa river, between plaintiff’s dam, described in its petition, and the mouth of plaintiff’s tail-race, or otherwise called the mouth of Spring Branch, and the right to the use and enjoyment of the same to the same extent as it had used and enjoyed the same prior to the erection of the dam by defendants, as set forth in plaintiff’s petition.
“2. That as against the defendants, John Greer and James Hunter, the plaintiff has a right to maintain its tail-race, as set forth in its petition, where it now is, and discharge the water from its mill through the same, free from any interference on the part of defendants.
“ 3. That the dam of the defendants, being the same set forth in the pleadings, be abated, so that it shall cease to interfere with power of plaintiff, as above established, and to that end a writ of abatement do issue, directed to the sheriff of this county, directing him to abate the said dam of defendants, as above provided; the extent of such abatement to be practically determined by the sheriff at an ordinary stage of water, for which purpose the sheriff may call to his assistance a competent engineer.
“ The sheriff to collect from said defendants the costs of enforcing said writ of abatement, and to report his doings under said writ, with his fees and the costs of such abatement, to the next term of this court, at which term, if either party desire, they shall have the right to take exceptions to the action of such sheriff in relation to such abatement, either on account of allowance made by him for the varying stages of
“And on the trial of such exceptions evidence may be introduced in relation to the same as in equitable actions, and the court may make such order or decree, either sustaining the report, or increasing or modifying the abatement made, as the evidence will warrant.
“ And the parties shall have all the rights of appeal from such decree as are applicable to any ordinary decree of this court in equity.
“ 4. That plaintiff do have and recover of defendants the sum of $500 as his damages up to the commencement of this action, with $-costs, and that execution issue therefor.”
Upon this decree a writ of abatement was issued to the sheriff on the 26th day of April, 1879, directing him to cause the dam to be lowered to the extent specified, in the decree.
The cause was transferred by consent to the Circuit Court for the reason that the Hon. E. E. Cooley, formerly counsel for defendants, had become Judge of the District Court.
On the 29th day of October, 1879, the sheriff, to whom the writ of abatement was issued, made return thereof in the following language:
“I, J. H. Womeldorf, sheriff of said county, do hereby certify that the writ of abatement hereto attached was placed in my hands for service on the twenty-sixth day of April, 1879.
“ I delayed acting upon it for some time, for the reason that there was a prospect for a time that the plaintiff and defendants would agree upon the extent of the abatement. They having failed to agree, I then delayed further, for the reason that the defendants agreed that they would themselves abate the dam as far as they thought it should be abated, and at their own expense. They did lower the dam somewhat— how much I am unable to say — and reported to me that they would not lower it any further. I called to my assistance a competent engineer, Eobert Callwell, who took the level of the surface of water at the dam, and at the mouth of plaint*90 iff’s tail-race in the river. The surface of the water at the dam stood relatively at 99.63 feet, having relation to a certain standard called 100, the basis of the survey. At the mouth of the tail-race, in the river, it stood at the relative height of 99.63 feet — this with plaintiff’s gate shut and but little water discharged through the race, and the water drawn down through the gates, etc., at defendants’ mill.. Then I made a test to ascertain whether the water at the mouth of plaintiff’s tail-race was affected by the defendants’ dam, by causing the head-gates at the upper end of defendants’ head-race, near defendant’s dam, to be closed. They were partially closed, sufficiently to raise the water at the dam two and one-half inches. An examination showed that the water in the river, opposite the mouth of plaintiff’s tail-race was raised to the same extent as at the dam. Taking this as evidence, that the water in the river at the mouth of plaintiff’s tail-race was still affected by the defendants’ dam, I then caused the dam to be lowered, and then made the necessary measurements and found the water lowered in the river, at the mouth of plaintiff’s tail-race, to just the same extent as at the dam. I then caused the dam tó be lowered again, with the same* result. I lowered the dam in all eleven inches. Estimating that this would lower the water correspondingly, it would leave the surface- of the water at the dam, when at the same stage as when the engineer took his levels, relatively to the said standard, 98.72 feet.
“ This work was all done, including the taking of the levels, when the water of the river, as near as I could ascertain by diligent-and careful inquiry, was at an ordinary stage, except that shortly after commencing to lower the dam the third and last time, in consequence of heavy rains, the water was raised considerably above what it was before, in consequence of which I was unable to proceed further. I commenced to lower the dam on the twenty-third day of August, 1879, and ceased to work on the eighth day of October, 1879. In my opinion, from the result of the previous tests, a further lower*91 ing of defendants’ dam will lower water in the river at the mouth of plaintiff’s tail-race; and, in the opinion of the engineer called to my assistance as aforesaid, the dam should be lowered so that the surface of the water immediately above the defendants’ dam, at an ordinary stage of water, would stand at the relative height of ninety-eight feet, having relation to the standard 100 above mentioned. The top of the sill of the plaintiff’s wheel-pit stands, relatively to the same standard, at 98.7-10 feet, as stated by the said engineer. I have not lowered the dam as much as in the opinion of the engineer I should do, and as much as the practical tests made by me would seem to require, for the reason that I, am inexperienced in these matters, and'am threatened by the defendants with an action for damages for what I have already done. In view of these facts, the height of the water, and the lateness of the season, I deemed it best to report my action to 'the court, and await its decision in the matter. In what I have before said and done I have not taken into consideration, neither has the said engineer, the varying stages of water; exclusive of floods and freshets that may be reasonably expected, .from time to time, in the river. ITow far this should increase the extent of the abatement I am unable to say, but that it should increase it somewhat is to my mind clear. Neither am I able to state what, if any, allowance should be made to create the proper current between the mouth of plaintiff’s tail-race and defendants’ dam. If any considerable allowance should be made, it would materially affect the extent of the abatement. Again, should the abatement' be regulated and tested with the head-gates of defendants’ head-race closed, and the water of the race all discharged over the dam? Conceding this to be correct, it will make a difference of from five to six inches in the extent of the abatement. Which is the proper rule, I am unable to say.”
After the return of the writ the plaintiff moved that the sheriff’s doings thereon be approved and a decree entered accordingly, and that another writ of abatement issue requiring
Afterwards the defendants filed another motion for the correction of the decree last entered in the case, so that it shall give to the plaintiff the right, and nothing more, “to the fall of the river as low down as the mouth of Spring Branch, and to strike out -all tha,t portion of the decree that gives the plaintiff the fall to the mouth of their tail-race.” It is alleged in the motion that this change in the decree is necessary to make it conform to the decision of this court and the stipulation of the parties. Upon these motions, and1 the sheriff’s return of the writ, the cause was again submitted to the court and evidence was introduced upon the issue involving the height at which defendants could maintain the dam without encroaching upon plaintiff’s rights. Defendants’ motion to correct the decree was overruled.
The motion of plaintiff to approve the return of the sheriff was sustained, except that the height of 98 for defendants’ dam was substituted for 97 as claimed in the motion. Thereupon the court entered a decree “that the dam of defendants be further abated until the surface of the water thereon at an ordinary stage, stands at the relative height of 98 feet, having relation to the relative height of the sill of plaintiff’s wheel-pit * * * * * which stands according to the same standard at the relative height of 98.70.”
The plaintiff excepted to the decision of the court fixing
II. We will first consider the decision of the court below upon defendants’ motion to correct the decree first entered after the case was brought back upon procedendo from this court.
We are of the opinion that the position of defendants is clearly in conflict with the facts of the case. The tail-race, it will be observed, from what is said in our first opinion, was dug so that the water flowed into Spring .Branch, which thus became a part of the tail-race. This was when the tail-race was first constructed. The evidence clearly shows that,
Upon á careful consideration of the evidence we have reached the conclusion that 98, as the relative height of defendant’s dam, having reference to the standard adopted and
It appears very plain to us that the true height at which defendants’ dam ought to be allowed to stand should be-determined, rather by experiments than upon theoretical conclusions drawn from survey's. The instruments used by engineers are more or less imperfect, and mistakes and errors in their use are almost certain to happen. Angel on Watercourses, p. 106: Brown v. Bush, 45 Pa. St., 61. A slight variation from the true level, resulting from these causes, would lead to important errors in the final results of the survey. The only true test of accuracy is found in experiments after the work based upon the leveling is done.
It cannot be doubted that if the parties to the suit were to unite in an honest effort to find for themselves the true elevation at which defendant’s dam should stand, so that it would not interfere with plaintiff’s rights at the mouth of the tail-race, and were both actuated by a desire to do exact justice, they would adopt the common sense, practical course pursued by the sheriff as shown by his return. They would call to their aid an engineer to take levels, and would reduce the height of the dam to accord with the result he shoxdd reach. They would then test their work by actual experiment, drawing off the water from the dam and observing its rise at the mouth of the tail-race when the gates of the dam were closed. If they discovered back-water at the mouth of the tail-race, they would, in a prudent and careful way, lower the dam still more, until, in this way, they would find its lawful height.' Why should not equity require the same course to be pursued by the officer whose duty it is to abate the dam? The quotation from our former opinion, above set out, con
The decree of the Circuit Court, made upon the return of the sheriff, will be reversed, and the cause will be remanded
The decree shall prescribe the manner of the abatement by experiments, the extent, with reference to the ordinary stage of water, as explained in this opinion, and other matters in harmony therewith, all of which shall be made clearly to appear in the writ of abatement to be issued upon the decree.
The decision of the Circuit Court upon defendant’s appeal, is affirmed, and the decree upon plaintiff’s appeal is
Eeveksed.