DAVIS WETLANDS BANK, LLC, Plaintiff, v. The UNITED STATES, Defendant.
No. 13-268 C
United States Court of Federal Claims.
December 16, 2013
BRADEN, Judge.
Filed Under Seal: December 16, 2013; Reissued for Publication: January 6, 2014
E. Motion for Class Certification
In Greenlee County v. United States, 487 F.3d 871 (Fed. Cir. 2007), the Federal Circuit affirmed the decision of the Court of Federal Claims finding the issue of class certification moot because all of the plaintiff‘s claims had been dismissed. 487 F.3d at 880-81. The Federal Circuit noted that it had “repeatedly found on appeal that issues related to class certification were moot in light of [its] resolution against the plaintiff of a motion to dismiss or for summary judgment” and saw “no reason to apply a different rule when it is the Court of Federal Claims that finds the issue moot.” Id. at 880. Having dismissed each count of Mr. Earman‘s Fourth Amended Complaint, the court also denies as moot plaintiff‘s pending motion for class certification. See id.; Meyers, 96 Fed. Cl. at 42 n.6 (“Because plaintiffs’ complaint is dismissed in its entirety, the motions for class certification and to amend the pleadings are dismissed as moot.” (citing Greenlee County, 487 F.3d at 880)).
CONCLUSION
For all of the foregoing reasons, the court hereby grants defendant‘s motion to dismiss Counts II and III, grants defendant‘s motion for summary judgment on Counts I, IV, and V, and denies plaintiff‘s cross-motion for summary judgment on all counts.
Accordingly, it is hereby ORDERED that
- Defendant‘s Revised Motion to Dismiss and Motion for Summary Judgment, filed February 1, 2013, is GRANTED;
- Plaintiff‘s Cross-Motion for Summary Judgment, filed March 20, 2013, is DENIED;
- Plaintiff‘s Motion for Class Certification, filed September 30, 2010, is DENIED as moot;
- The Clerk‘s Office is directed to ENTER final judgment in favor of defendant, DISMISSING the Fourth Amended Complaint with prejudice; and
- Each party shall bear its own costs.
IT IS SO ORDERED.
regarding his takings claim, and because that claim fails as a matter of law, the court denies plaintiff‘s request for a “stay.”
Meen Geu Oh, United States Department of Justice, Civil Division, Washington, D.C., Counsel for Defendant.
MEMORANDUM OPINION AND ORDER
BRADEN, Judge.
I. RELEVANT FACTUAL BACKGROUND.1
On November 4, 1998, Davis Wetlands Bank, LLC (“the Bank“), the United States
On November 24, 1998, a Site-Specific Plan for the Davis Wetland Bank (“Site-Specific Plan“) was implemented, that was revised on March 31, 1999. Compl. ¶ 20 & Ex. C. That plan required the Bank to “block[] the drainage discharge from the site to increase the hydrology” and “plant[] thousands of tree seedlings.” Compl. ¶ 28. On September 26, 2001, the signatories amended the Umbrella Agreement.3 Compl. ¶ 21 & Ex. D.
Under the Final Agreement, the Bank committed to restore agricultural and forested areas to wetlands and preserve existing wetlands, as well as provide financial assurance for the Bank‘s performance. Compl. ¶ 23 & Ex. B at 5. In exchange, the Army Corps agreed to issue the Bank one wetland credit per 1.00 acre of restored cropland, 0.50 acres of restored previously-drained forest, or 7.5 acres of existing wetlands.4 Compl. Ex D. The Bank could then “sell credits to third parties as compensation mitigation for unavoidable impacts to wetlands that were permitted, pursuant to
The Final Agreement also required that the Bank provide the Army Corps with an annual report for seven years.5 Compl. Ex. C. At the end of the first 5-year monitoring period, “the credit composition [would] be reevaluated and may be adjusted to reflect maturation of the restored or created wetlands.” Compl. Ex. B. On October 30, 2001, the Army Corps agreed to issue the Bank 389.9 credits, “subject to the success of [the Bank‘s] restoration and creation efforts.”6 Compl. ¶ 39 & Ex. D.
Sometime in 2012, the Bank requested that the Army Corps issue an additional 139.5 credits to reflect the development of certain agricultural fields into mature forested wetlands. Compl. ¶ 47. On August 24, 2012, however, the Army Corps denied that request. Compl. ¶ 49, Ex. E, & Ex. F.
II. PROCEDURAL HISTORY.
On April 15, 2013, the Bank filed a Complaint in the United States Court of Federal Claims alleging that the Army Corps’ refusal to adjust credit composition to reflect the maturation of the restored agricultural fields into forested wetlands violated
On July 24, 2013, the Government filed a Motion To Dismiss. On August 23, 2013, the Bank filed a Response. On September 6, 2013, the Government filed a Reply.
III. DISCUSSION.
A. Jurisdiction.
The United States Court of Federal Claims has “jurisdiction to render judgment upon any claim against the United States founded either upon the Constitution, or any Act of Congress or any regulation of an executive department, or upon any express or implied contract with the United States, or for liquidated or unliquidated damages in cases not sounding in tort.”
B. Standard Of Review For A Motion To Dismiss Pursuant To RCFC 12(b)(1).
A challenge to the United States Court of Federal Claims’ “general power to adjudicate in specific areas of substantive law . . . is properly raised by a [Rule] 12(b)(1) motion[.]” Palmer v. United States, 168 F.3d 1310, 1313 (Fed. Cir. 1999); see also Rules of the United States Court of Federal Claims (“RCFC“) 12(b)(1) (allowing a party to assert, by motion, “lack of subject-matter jurisdiction“). When considering whether to dismiss an action for lack of subject matter jurisdiction, the court is “obligated to assume all factual allegations of the complaint to be true and to draw all reasonable inferences in plaintiff‘s favor.” Henke v. United States, 60 F.3d 795, 797 (Fed. Cir. 1995).
Nonetheless, the plaintiff bears the burden of establishing jurisdiction by a preponderance of the evidence. See Reynolds v. Army & Air Force Exch. Serv., 846 F.2d 746, 748 (Fed. Cir. 1988) (“[O]nce the [trial] court‘s subject matter jurisdiction [is] put in question . . . [the plaintiff] bears the burden of establishing subject matter jurisdiction by a preponderance of the evidence.“).
C. Standard Of Review For A Motion To Dismiss Pursuant To RCFC 12(b)(6).
A challenge to the United States Court of Federal Claims’ “[ability] to exercise its general power with regard to the facts peculiar to the specific claim . . . is raised by a [Rule] 12(b)(6) motion[.]” Palmer, 168 F.3d at 1313; see also
When considering whether to dismiss an action for failure to state a claim, the court must assess whether “a claim has been stated adequately” and then whether “it may be supported by [a] showing [of] any set of facts consistent with the allegations in the complaint.” Bell Atl. Corp. v. Twombly, 550 U.S. 544, 563, 127 S. Ct. 1955, 167 L. Ed. 2d 929 (2007). The plaintiff‘s factual allegations must be substantial enough to raise the right to relief “above the speculative level,” accepting all factual allegations in the complaint as true and making all reasonable inferences in favor of the plaintiff. Id. at 555.
D. Issues Raised In The Government‘s July 24, 2013 Motion To Dismiss.
1. Whether The Court Has Jurisdiction To Adjudicate Breach Of Contract Claims Arising From The Final Agreement.
a. The Government‘s Argument.
The Government advances two arguments in support of the Motion To Dismiss, pursuant to
A clear indication of intent to contract must be found before concluding a contract has been formed. Gov‘t Mot. 6 (citing D & N Bank v. United States, 331 F.3d 1374, 1378 (Fed. Cir. 2003)). The Government, however, insists that the Final Agreement was not a contract but “a regulatory instrument,” the purpose of which was to “establish general provisions for the design [and] development . . . of a compensatory wetland bank[.]” Gov‘t Mot. 7. The Army Corps’ actions to “effectuate regulatory proclamations” and “exercise the Government‘s sovereign function does not signify intent to contract.” Gov‘t Mot. 6 (citing Anderson v. United States, 344 F.3d 1343, 1357 (Fed. Cir. 2003); D & N Bank, 331 F.3d at 1378).
More specifically, the Government contends that the Army Corps’ role in the Final Agreement was in the nature of a regulator and supervisor, i.e., to verify “the geographic parameters of the proposed mitigation bank, . . . over[see] . . . the project, establish criteria that [the Bank] must follow to obtain credits, adjudge the suitability for a particular compensation proposal or compensation site, determine appropriate credit composition ratios, and generally inform [the Bank of non-compliance].” Gov‘t Mot. 7 (internal citations and quotations omitted). As such, the Army Corps was not a party to the Final Agreement, but the regulation. Gov‘t Mot. 7 (citing Hearts Bluff Game Ranch, Inc. v. United States, 669 F.3d 1326, 1331 (Fed. Cir. 2012) (“The mitigation bank program is run exclusively by the [Army] Corps, subject to its pervasive control, and no landowner can develop a mitigation bank absent [its] approval.“)). And, the Final Agreement is a “regulatory arrangement[],” not a contract. Gov‘t Mot. 8. In fact, the Government suggests that the court should view the Final Agreement as a permit. Gov‘t Reply 1-2 (citing Hearts Bluff Game Ranch, 669 F.3d at 1331 (referring to an application to establish a mitigation bank as a “permit“); United States v. Smith, 39 F.2d 851, 856 (C.C.A. 1930) (“In general, a license is not a contract.“); BLACK‘S LAW DICTIONARY (9th ed. 2009) (defining “permit” as a “license“)).
Only in “exceptional circumstances” may a court construe a permit to be a contract. Gov‘t Reply 3 (citing Son Broadcasting, Inc. v. United States, 52 Fed. Cl. 815 (2002)
In the alternative, assuming arguendo that the Final Agreement is a contract, it does not contemplate the remedy of monetary damages, because the words “money” or “damage” are not included in the Final Agreement. Gov‘t Mot. 8 (citing D & N Bank, 331 F.3d at 1378 (“[T]he intent to contract . . . is implausible because none of the documents . . . mentions goodwill or the accounting treatment thereof.“)). Instead, in this case, the Bank attempts to transform its demand for additional credits into a demand for money damages. Gov‘t Mot. 10. The only relief contemplated by the Final Agreement is “nonmonetary,” namely “credit adjustments under the Disputes Resolution Clause.” Gov‘t Reply 9. Thus, “the only relief [the Bank] can rightly seek is extra credits . . . [and the] proper forum for such a dispute is the district courts.” Gov‘t Reply 10.
b. The Plaintiff‘s Response.
The Bank responds that the Final Agreement is an enforceable government contract and any claims arising thereunder are within the court‘s jurisdiction. Pl. Resp. 4 (citing
The Umbrella Agreement, the Site-Specific Plan, and subsequent amendments reflect mutual obligations, rights, and responsibilities evidencing a contract. Pl. Resp. 5. For example, Section IX of the Final Agreement states that “[t]he terms and conditions of this Agreement shall be binding upon, and inure to the benefit of the parties hereto.” Compl. Ex. B at 13 (Umbrella Agreement). Section IX thereof contains an integration clause, allows only written modifications, and restricts third-party claims. Pl. Resp. 5-6 (citing Compl. Ex. B at 14-15 (Umbrella Agreement)).
Irrespective of what definition one choses, the Final Agreement includes all elements of a contract. Pl. Resp. 6-7 (citing Harbert/Lummus Agrifuels Projects v. United States, 142 F.3d 1429, 1434 (Fed. Cir. 1998) (holding that an express government contract is evidenced by: mutual intent; an exchange of consideration; and lack of ambiguity in offer and acceptance); Buchanan v. Doe, 246 Va. 67, 72, 431 S.E.2d 289 (1993) (defining a contract as an agreement between two or more persons that obligates them to do or not do a specific thing)).7 In this case, mutual understanding exists, because the Final Agreement sets forth the signatories’ “rela-
The assertion that the Final Agreement is a “regulatory pronouncement” is not supported by the cases cited by the Government. Pl. Resp. 7 (citing Anderson, 344 F.3d 1343; D & N Bank, 331 F.3d 1374). In Anderson, the United States Court of Appeals for the Federal Circuit held that the Federal Home Loan Bank Board was not a party to a contract when it issued a resolution that approved a bank merger, but instead was a regulator. Pl. Resp. 8-9 (citing Anderson, 344 F.3d at 1357). In this case, the Final Agreement does not only approve of a wetlands bank, but sets forth “a mutual and detailed agreement” and “evidences the [Army] Corps’ agreement to award specific credits for specific types of wetlands restoration within the bank.” Pl. Resp. 9. Because “the analysis in D & N Bank is essentially the same [as in Anderson] and Anderson relies on D & N Bank,” that case is similarly inapposite to “the facts and agreement in the case at bar.” Pl. Resp. 9.
In addition, as the Government concedes, contracts “generally are presumed to create a substantive right to damages as a remedy.” Pl. Resp. 10 (quoting Gov‘t Mot. 9). Therefore, according to the United States Court of Appeals for the Federal Circuit in Holmes v. United States, 657 F.3d 1303 (2011), “when a breach of contract claim is brought in the [United States] Court of Federal Claims under the Tucker Act, the plaintiff comes armed with the presumption that money damages are available, so that normally no further inquiry is required.” Pl. Resp. 12 (quoting Holmes, 657 F.3d at 1314). In fact, a government contract expressly must disavow money damages to avoid this presumption. Pl. Resp. 12 (citing Holmes, 657 F.3d at 1314). Here, the Final Agreement contemplates money damages, because the Army Corps was well aware that the Bank sold the credits to third parties, and thus any breach “would inherently affect the monetary compensation [the Bank] could derive from the wetlands bank.” Pl. Resp. 13.
c. The Court‘s Resolution.
Common law governs the contractual relationship between a private party and the United States. See United States v. Winstar Corp., 518 U.S. 839, 871, 116 S. Ct. 2432, 135 L. Ed. 2d 964 (1996) (explaining that “ordinary principles of contract construction and breach . . . [that apply] to any contract action between private parties” govern a contract with the Government); Perry v. United States, 294 U.S. 330, 352, 55 S. Ct. 432, 79 L. Ed. 912 (1935) (“When the United States, with constitutional authority, makes contracts, it has rights and incurs responsibilities similar to those of individuals who are parties to such instruments.“). Accordingly, the United States Court of Appeals for the Federal Circuit has held that “jurisdiction under the Tucker Act requires the litigant to identify a substantive right for money damages against the United States separate from the Tucker Act itself.” See Todd, 386 F.3d at 1094. An express contract with the Government entails the following elements:
- mutuality of intent to contract;
- lack of ambiguity in offer and acceptance;
- consideration; and
- a government representative having actual authority to bind United States in contract.8
Anderson, 344 F.3d at 1352; see also Massie v. United States, 166 F.3d 1184, 1188 (Fed. Cir. 1999) (“[A]ny agreement can be a contract within the meaning of the Tucker Act, provided that it meets the requirements for a contract with the Government.“).
First, contract formation requires “an objective manifestation of voluntary, mutual assent.” Anderson, 344 F.3d at 1353 (citing RESTATEMENT (SECOND) OF CONTRACTS
A good example is found in D & N Bank, where a Bank Board Resolution was deemed not to be a product of negotiation between the two parties, but only a memorialization of the Board‘s approval of a merger between D & N Bank and another thrift bank. See 331 F.3d at 1379; see also Anderson, 344 F.3d at 1357 (same). In this case, unlike D & N Bank, the Final Agreement indicates a clear intent by the Army Corps to contract, and imposes mutual obligations on both parties. Compl. Ex. B at 11 (Umbrella Agreement) (“Bank Sponsor shall be responsible for maintaining the Bank in perpetuity[.]“); Compl. Ex. B at 13 (Umbrella Agreement) (“The terms and conditions of this Agreement shall be binding upon, and inure to the benefit of the parties hereto[.]“); Compl. Ex. B at 13 (Umbrella Agreement) (“[T]he Corps Permit Officer will specify any contemplated multiplier [for assigning credit liabilities to projects] and a rationale for its application.“).
The inquiry into whether there is a mutual intent to contract overlaps, in part, with the requirement that there be a lack of ambiguity in offer and acceptance, since a plaintiff must offer objective evidence of “the existence of an offer and a reciprocal acceptance . . . [t]o satisfy its burden to prove . . . mutuality of intent.” Anderson, 344 F.3d at 1353; see also RESTATEMENT (SECOND) OF CONTRACTS § 22(1) (“The manifestation of mutual assent to an exchange ordinarily takes the form of an offer or proposal by one party followed by an acceptance by the other party or parties.“). In this case, the Final Agreement contains definite terms and recites the obligations contained and acceptance manifested by the signatures from a Bank representative, a District Engineer for the Army Corps, and a representative from USFWS. The documents and exhibits that together comprise the Final Agreement were reviewed and signed by the parties over the course of several years, suggesting a negotiated arms-length process. This ongoing process, culminating in the parties signing three separate agreements, represents “the manifestation of willingness to enter into a bargain, so made as to justify another person in understanding that his assent to that bargain is invited and will conclude it.” Anderson, 344 F.3d at 1353 (quoting RESTATEMENT (SECOND) OF CONTRACTS § 24).
As consideration for the Bank‘s promise to restore wetlands subject to the Final Agreement, the Army Corps promised to issue the Bank credits, each now allegedly valued at $10,000 (Compl. ¶ 51).9 See, e.g., Smith v. Mountjoy, 280 Va. 46, 53, 694 S.E.2d 598, 602 (2010) (“Consideration is, in effect, the price bargained for and paid for a promise. It may be in the form of a benefit to the party promising or a detriment to the party to whom the promise is made.“) (quoting Brewer v. First Nat‘l Bank of Danville, 202 Va. 807, 815, 120 S.E.2d 273 (1961)). In addition, under Virginia law, the Bank‘s substantial remediation efforts investments are sufficient consideration for the Army Corps’ promise to award marketable credits. Id. Therefore, the Government is mistaken in minimizing the substantial investment that the Bank has undertaken (Gov‘t Reply 5-7), including the set-aside of a large number of acres of land, restoration of the land, and promises of long-term maintenance of that land. See, e.g., Compl. Ex. B at 11 (Long-Term Maintenance); Compl. Ex. C (Site-Specific Plan); see also Son Broadcasting, 52 Fed. Cl. at 824 (treating a permit and site
Therefore, under the Final Agreement, the Army Corps agreed to enter into a contract with private parties to accomplish wetland restoration in exchange for issuing credits that could be sold “to third parties as compensation mitigation for unavoidable impacts to wetlands that were permitted, pursuant to
Contrary to the Government‘s assertion, the Final Agreement is not a “regulatory instrument.” Gov‘t Mot. 7. To distinguish a regulatory proclamation from a contract, the court may examine “resolutions, forbearance letters, assistance agreements, and supervisory action agreements to see if they consist of only regulatory proclamations, or if they include additional language, which clearly manifests the government‘s intention to contract.” First Fed. Lincoln Bank v. United States, 60 Fed. Cl. 501, 503-04 (2004); cf. Anderson, 344 F.3d at 1358 (citing First Commerce Corp. v. United States, 335 F.3d 1373, 1378 (Fed. Cir. 2003)). The fact that “no landowner can develop a mitigation bank absent [Army] Corps approval,” does not preclude the Army Corps from contracting with a private party.10 Hearts Bluff Game Ranch, 669 F.3d at 1331.
Nor is the Government correct that the absence of words such as “money” or “damage” preclude the remedy of money damages. “[I]n a contract case, the money-mandating requirement for Tucker Act juris-diction normally is satisfied by the presumption that money damages are available for breach of contract, with no further inquiry being necessary.” Holmes, 657 F.3d at 1314. The Government has cited no explicit language in the Final Agreement that overcomes the presumption of money damages, because none exists. To the contrary, explicit language in the Final Agreement and in communications between the parties manifests the Army Corps’ intention to enter into a contractual relationship with the Bank.
For these reasons, the court has determined that it has jurisdiction to adjudicate the alleged breach of contract claims in the April 15, 2013 Complaint.
2. Whether The April 15, 2013 Complaint Pled A Breach Of Contract Claim.
a. The Government‘s Argument.
The Government also argues that the Bank did not sufficiently plead a breach of contract claim, requiring the court to dismiss the April 15, 2013 Complaint, pursuant
Second, the Government‘s “continued willingness to discuss an adjustment of the credit composition” cannot be construed as a breach of duty. Gov‘t Mot. 14 (citing Compl. Ex. F).
b. The Plaintiff‘s Response.
The Bank responds that, because the Army Corps breached its contractual duty to adjust credit composition, the suggestion that “negotiations” are ongoing is not accurate, and the damages claimed are the foreseeable loss of profits. Pl. Resp. 20, 22. The only reasonable interpretation of the Final Agreement at issue, i.e., “the credit composition will be reevaluated and may be adjusted to reflect maturation” (Comp. Ex. B at 11), is that “the provision obligates the [Army] Corps to adjust the credit composition, if the required reevaluation reflects a different outcome than the breakdown contemplated by the parties prior to construction of the wetlands bank.” Pl. Resp. 17 (emphasis in original). To interpret that text of the Final Agreement as an option within the discretion of the Army Corps “flies in the face of the entire purpose of the agreement and . . . renders the phrase meaningless surplusage.” Pl. Resp. 17; see also id. at 16 (citing Nat‘l By-Prods., 405 F.2d 1256 (requiring that the text of a contract be construed in context)); United Int‘l Investigative Servs. v. United States, 109 F.3d 734, 737 (Fed. Cir. 1997) (holding that a contract must be interpreted, “as a whole and in a manner which gives reasonable meaning to all its parts” (internal quotations omitted)). Moreover, applicable federal regulations require that the wetland mitigation banks’ credits reflect actual site conditions. Pl. Resp. 18 (citing
Second, the August 24, 2012 email does not evidence ongoing negotiations, but instead the Army Corps’ attempt to impose additional requirements on the Bank not included in the Final Agreement. Pl. Resp. 20-21.
Third, the amount of damages incurred by the Bank has been addressed in Neely v. United States, 285 F.2d 438, 443 (Ct. Cl. 1961), wherein the United States Court of Claims held that lost profits were compensable damages. See Neely, 285 F.2d at 443 (explaining that, in certain circumstances, “loss of [sic] anticipated profits . . . is a recognized measure of damages“). In addition, Wells Fargo Bank, cited by the Government, supports the Banks’ position that the loss of profits tied to the loss of credits “were foreseeable at the time the parties entered into the Agreement.” Pl. Resp. 21-22 (citing Wells Fargo Bank, 88 F.3d at 1023).
c. The Court‘s Resolution.
For a claim to survive a motion to dismiss under
In this case, the plain language of the Final Agreement supports the Bank‘s allegation (Compl. ¶ 50) that the Army Corps had a duty to fairly consider adjustments to the credit compensation. Compl. Ex. B at 11 (Umbrella Agreement) (“[A]t the end of the 5-year monitoring period . . . , the credit composition will be reevaluated and may be adjusted to reflect maturation of the restored or created wetlands.“). The April 15, 2013 Complaint also alleges that the Army Corps
Therefore, whether the Army Corps denied the Bank‘s request for a credit adjustment is a factual inquiry that cannot be decided on a motion to dismiss. See Bradley v. Chiron Corp., 136 F.3d 1317, 1321 (Fed. Cir. 1998) (When ruling on a motion to dismiss under Rule 12(b)(6), “factual statements in the complaint are accepted as true . . . [and dismissal] is proper only when, on the complainant‘s version of the facts, the premises of a cognizable claim have not been stated.“). The Complaint alleges that the August 24, 2012 email contains that denial. Compl. ¶ 49. The August 24, 2012 email states that the Army Corps does not support “issuing additional credit to the bank merely because the project . . . is an ecological success.” Compl. Ex. E at 1. To the extent that the Army Corps suggested other ways in which the Bank could generate additional credits, that is beside the point. Compl. Ex. E at 1 (“Additional compensatory mitigation credits could be generated from this site through additional real estate protection.“). The August 24, 2012 email evidences that the Army Corps denied the Bank‘s request to issue credits, and, therefore, is sufficient to overcome the Government‘s Motion To Dismiss.
Finally, although the Government argues that $10,000 per credit of damages (Compl. ¶ 51) is speculative, this is not grounds for dismissal.
IV. CONCLUSION.
For these reasons, the Government‘s July 24, 2013 Motion To Dismiss is denied. The court will contact the parties to convene a status conference to discuss discovery and a trial date.
IT IS SO ORDERED.
SUSAN G. BRADEN
Judge
COASTAL ENVIRONMENTAL GROUP, INC., Plaintiff, v. The UNITED STATES, Defendant.
No. 13-71C
United States Court of Federal Claims.
Filed Under Seal: December 16, 2013
Reissued for Publication: January 6, 2014 *
January 2, 2014. The redaction is indicated with a bracketed ellipsis (“[ . . . ]“).