Crane v. Consolidated Rail Corp.Crane v. Consolidated Rail Corp.
This is an appeal by defendant Consolidated Rail Corporation (Conrail) from a judgment of the District Court for the Southern District of New York, after a jury verdict in a second trial in an action under the Federal Employers’ Liability Act (FELA),
The First Trial
Crane’s death came about as a result of impact from a Conrail train early in the afternoon of December 5, 1980. Crane was part of the carpentry work crew of Conrail’s Harmon, New York station yard. Thomas Conway was foreman of the crew; the other members were Henry LeClerc, Cecil Walker and John Fatone.
During the morning of December 5 Conway learned that the cross-walks at the Scarborough Station needed repair. There are four sets of tracks at that station, tracks 1 and 3 being the northbound track with track 3 nearest to the northbound platform. That morning track 1 had been closed for repairs and all northbound trains operated over track 3. The walkway requiring repair was a wooden cross-over; the job involved cutting planks to replace the rotten planks in the walkway adjacent to track 3 near the northbound platform. To the right of the northbound platform was a chainlink fence which separated the platform from the parking area.
Rule 3204 of Conrail’s Safety Rules provides that “[fjoremen are responsible for a safe operation and must exercise every reasonable precaution to protect men in their charge”, and Rule 101 of its Rules for Conducting Transportation provides that “[a]ny work on or adjacent to a track which may create a condition interfering with the safe movément of trains at normal speed or the use of equipment which may foul adjacent tracks, must not be attempted without the permission of the train dispatcher.”
Rule 3204 of Conrail’s Safety Rules also provides that the foreman “will assign gang watchmen when and where necessary as well as advance watchmen when needed.” Conway assigned LeClerc as the watchman. Rule 3203 of the Rules requires that only qualified employees may be assigned as watchmen, and that gang watchmen must have an approved qualification card. LeClerc did not have the card, having neither attended classes nor received instructions about being a watchman, but had acted as a flagman or watchman on numerous other occasions. Although Rule 3206 of the Safety Rules provides that an advance gang watchman must have a warning whistle, a standard white disc and a red flag, LeClerc carried only an airhorn. He placed himself about 300 feet south of where the men were working. Shortly thereafter, a train came along on track 3. LeClerc sounded his airhorn and the men cleared the area.
When the work crew arrived at the station, it was decided that any necessary cutting of planks would be done by a hand-operated chain saw on the tailgate of a Conrail truck in the parking lot. LeClerc testified that he so understood the plan. A few pieces of lumber were cut in this manner; Crane volunteered to do the cutting since he was more experienced than Fatone with the chain saw.
Fatone testified that later “for some reason we felt that it would be better to go inside the gate off the edge of this concrete to cut this 4 by 6 because we could stand on it and one guy can cut on it; and that’s what happened.” App. at 314a. Crane, Conway and Fatone were all standing on the plank, with Crane closest to the track, looking away from it and operating the chain saw, which made a very loud noise.
Just at this time a second northbound train approached. LeClerc sounded his air-horn
Conrail’s Safety Rule 3207 provides that a watchman will not place himself farther from the gang than his warning whistle will be distinctly heard, and Rule 3208 requires a watchman to warn the crew of an approaching train at least fifteen seconds before the train reaches the point of the work. A reenactment of the accident performed as part of an investigation made by Conrail’s Superintendent of Safety showed that from LeClerc’s position as watchman his airhorn was not audible while the men were using the chain saw. The investigators concluded that there were violations of Conrail Safety Rules 3204 and 3207(b) “in that [the] foreman did not take every precaution to protect men in his charge by providing [an] additional watchman.” Conrail Memorandum of Investigation at 2 (Dec. 6, 1980). No fault was found with respect to Crane.
Dr. Staller had estimated Crane’s future earnings on the basis that Crane would remain with the railroad until age fifty-eight, and would receive the wage increases provided by contract through 1982 and other increases based on the Railroad Retirement Board's projected earnings growth “that run from [a] 7.1 percent increase [for 1983], 6.1 percent a few years after that, and then 5.735 percent [for 2000 to retirement].” App. at 492a. He testified that inflation was built into these figures. Id. at 540a-41a. Dr. Staller did not consider the possibilities that Crane would be promoted or might leave the railroad’s employ for a higher paying job. He deducted 31.9% for taxes until 1995 and 33.1% thereafter until retirement, and assumed personal maintenance ranging from 14.9% to 25%. He selected an interest rate of 12% for the gross recovery, which was based on the average rate of return over the past year for municipal bonds, and a reinvestment rate of 6.7% for the interest earned at the 12% rate. Using these rates as the rate of discount in a “two-step process”, Staller determined that the present value of Crane’s future earnings was $247,-204. To this amount he added $36,801 for lost fringe benefits, making a total of $284,005. He made no estimate of the claim for loss of Crane’s services in the household and nurture and plaintiff’s counsel did not supply one.
Plaintiff’s counsel questioned several of the assumptions used in Dr. Staller’s analysis and asked him to make another calculation using hypothetical figures supplied by counsel. For instance, counsel requested Staller to assume that Crane would remain working at the railroad until age sixty-five, that he would receive annual wage increases of 10% (a figure which presumably accounted for inflation), and that the discount rate would be 7.75%, less deductions for federal taxes. Id. at 534a. Based on these figures, Staller calculated a present value of $782,000 for Crane’s future lost earnings. Defendant’s counsel moved that the court strike this calculation on the ground that the assumptions supplied by plaintiff’s counsel had no support in the record and were purely speculative. The court denied the motion and allowed the jury to consider this alternative analysis when determining Crane’s future lost earnings.
In answer to questions put by the court the jury found that defendant had been negligent, that plaintiff had been contribu-torily negligent, and that the degree of his contributory negligence was 50%. The jury answered questions on damages as stated in the margin.
Plaintiff moved to set aside the verdict and for a new trial on the grounds that the diminution of recovery by 50% as a result of Crane’s contributory negligence was not supported by the evidence and that the award of damages was inadequate and resulted from an error in the charge on discounting. Chief Judge Motley granted the motion in a memorandum opinion.
The judge dealt mainly with the finding that Crane’s negligence constituted 50% of the total. She began with this court’s opinion in Bevevino v. Saydjari,
The trial judge, exercising a mature judicial discretion, should view the verdict in the overall setting of the trial; consider the character of the evidence and the complexity or simplicity of the legal principles which the jury was bound to apply to the facts; and abstain from interfering with the verdict unless it is quite clear that the jury has reached a seriously erroneous result. The judge’s duty is essentially to see that there is no miscarriage of justice. If convinced that there has not [sic] been then it is his duty to set the verdict aside; otherwise not.
She thought it was “quite clear that the jury has reached a seriously erroneous result.” She said she had initially indicated that she would not even charge with respect to contributory negligence but had decided to include the charge “on the theory that it was conceivable, however unlikely, that the jury might find that Crane should have protested the unsafe conditions and did not.” She thought that such a finding “could in no way support a verdict of fifty percent contributory negligence, nor, indeed, anything over five percent.” She pointed out that at the time of his death Crane was working with two other railroad employees and that “[i]f Crane was negligent, so were his co-workers.” More important, at least in our view, were her criticisms of the foreman whose “behavior fell shockingly below the reasonable man standard.” Altogether, “to allow the contributory negligence finding to stand would be a miscarriage of justice.” Since, in the judge’s view, allowing the finding of damages to stand but eliminating the halving for contributory negligence would result in an additur prohibited by the 5-4 decision in Dimick v. Schiedt,
Turning to the issue of damages, the judge recognized that “[w]here, as here, the jury has rendered a detailed special verdict, the court may properly separate the issues of contributory negligence and damages for retrial purposes,” citing Aker-manis, supra,
on the facts here, the court believes that the finding of damages and that of contributory negligence are sufficiently related that the jury’s damage finding may also have been tainted by the misconception of the law and the evidence.
Accordingly she also directed a new trial on the issue of damages.
The Second Trial and the Appeal
The second trial took a surprising turn. Defendant, which had so vigorously assert
On appeal, as indicated, Conrail contends that the award of the jury in the first trial should not have been set aside; that in any event its award of damages should not have been set aside; and that the damage award at the second trial was excessive.
DISCUSSION
It is undisputed that Chief Judge Motley correctly defined the standard governing whether or not to grant a new trial on the ground that the determination that Crane’s negligence constituted 50% of the total,
But where no undesirable or pernicious element has occurred or been introduced into the trial and the trial judge nonetheless grants a new trial on the ground that the verdict was against the weight of the evidence, the trial judge in negating the jury’s verdict has, to some extent at least, substituted his judgment of the facts and the credibility of the witnesses for that of the jury. Such an action effects a denigration of the jury system and to the extent that new trials are granted the judge takes over, if he does not usurp, the prime function of the jury as the trier of the facts. It then becomes the duty of the appellate tribunal to exercise a closer degree of scrutiny and supervision than is the case where a new trial is granted because of some undesirable or pernicious influence obtruding into the trial. Such a close scrutiny is required in order to protect the litigants’ right to jury trial.
Judge Hastie wrote in a dissent, joined by Judge Kalodner, id. at 91:
This traditional conception of the role of the trial judge has provided the one important limitation on the power of the jury to make an unimpeachable decision on the facts, even where the evidence is conflicting. The judge may not substitute the verdict he would have rendered on the evidence for that actually rendered by the jury. But he may avoid what in his professionally trained and experienced judgment is an unjust verdict by vacating it and causing the matter to be tried again by a second jury. Thus, the essential institution of jury trial is respected and an expedient middle ground is maintained between the absence of any control over a jury’s verdict on conflicting evidence, on the one hand, and judicial usurpation of the fact finding function, on the other.
Under this scheme the only function of a reviewing court, once the trial court has ordered a new trial, is to see whether there can have been any basis in reasonfor the trial judge’s conclusion as to the weight of the evidence and the injustice of the verdict.
Drawing on both opinions we agree with Chief Judge Biggs as to the need of particularly close appellate scrutiny where the trial judge grants a new trial solely because the judge regards the verdict as against the weight of the evidence but with Judge Hastie that the test is “whether there can have been any basis in reason for the trial judge’s conclusion as to the weight of the evidence and the injustice of the verdict.”
We do not find the verdict so irrational as did the district judge. Cutting the last piece of timber on a platform close to the northbound track, with the chain saw making a noise that obliterated the sound of the watchman’s horn, should have been perceived by an experienced workman like Crane to be a dangerous practice. An employee should exercise due care with respect to his workplace. See, e.g., Atlantic Coast Line Railroad v. Davis,
Still we cannot say that there was “no basis in reason” for the judge to conclude that an assessment of 50% against Crane was too high.
[contributory negligence involves no duty, unless we are to be ingenious as to say that the plaintiff is under an obligation to protect the defendant against liability for the consequences of his own negligence.
The Law of Torts § 65, at 418 (4th ed. 1971) (footnote omitted). If Conrail had greater responsibilities than Crane, as it did, the judge had a rational basis for thinking that an allocation of 50% of the total fault to him was “seriously erroneous”. We thus cannot find that she abused her discretion by setting aside so much of the verdict as found that Crane’s responsibility for the accident was equal to Conrail’s.
We take a different view with respect to so much of the order as directed a new trial on the issue of damages. It was held in Gasoline Products Co. v. Champlin Refining Co.,
The Gasoline Products case involved a claim by the plaintiff for breach of a license contract on which the jury had rendered an award in plaintiff’s favor and a counterclaim by defendant for plaintiff’s breach of a construction contract on which the jury had rendered a verdict in defendant’s favor. The court of appeals, having ruled that there was an error in the charge with respect to damages on the counterclaim, limited the new trial to the determination of such damages. Although approving the refusal to grant a new trial with respect to plaintiff’s claim, the Supreme Court held it was error to limit the new trial on the counterclaim to the issue of damages, since, although “[t]he verdict on the counterclaim may be taken to have established the existence of a contract and its breach”, id., there were many facts relating to the date of formation, terms and breach of the construction contract that the new jury would have to determine in order to make an intelligent award of damages. It was in this context that the Court said, in ordering a new trial as to both liability and damages on the counterclaim,
Where the practice permits a partial new trial, it may not properly be resorted to unless it clearly appears that the issue to be retried is so distinct and separable from the others that a trial of it alone may be had without injustice[,]
id. at 500,
[h]ere the question of damages on the counterclaim is so interwoven with that of liability that the former cannot be submitted to the jury independently of the latter without confusion and uncertainty, which would amount to a denial of a fair trial[,]
id. The Court’s concern was thus with the ability of the second jury to function under the limitation imposed by the court of appeals.
In Rivera v. Farrell Lines, Inc.,
The memorandum opinion of the district judge, which we have quoted above, casts little light on why a retrial of the damages issue was thought to be necessary. Clearly a jury retrying only the issue of comparative fault would not have faced the insuperable difficulties that would have confronted a jury attempting to try only the issue of damages in the Gasoline Products case — the point to which the cautionary language of that opinion was addressed. The judge did not find that the verdict with respect to damages at the first trial was against the weight of the evidence, and there would have been no basis for doing so. There is nothing to suggest that it was a compromise between jurors who believed that Crane was entitled to larger damages and others who believed that Conrail was not liable at all, as in the classic cases of Simmons v. Fish,
In sum, we find no adequate basis in the record or in the judge’s memorandum opinion for her directing the issue of damages to be retried simply because the jury had assessed too large a degree of fault against Crane. Recognizing the deference owed to the trial judge because of her superior opportunity to get the “feel of the case”, Cone v. West Virginia Pulp & Paper Co.,
Plaintiff contends that a new trial with respect to damages was required in any event because of an error in the charge. This was that the court did not instruct the jury to determine the discount rate based on comparing interest rates with inflation, as is allegedly required by Doca v. Marina Mercante Nicaraguense, S.A.,
The judgment is therefore reversed, with directions to enter judgment in the amount of $425,000 determined to be plaintiff’s damages by the jury at the first trial, with no deduction to be made for any fault of Crane’s. No costs.
Notes
. Fouling the tracks means the placing of personnel or equipment at or near the tracks which might create a hazardous obstruction.
. Safety Rule 3207 states that the use of noisy machinery may require additional gang watchmen. Rule 3208 provides that additional warning may be needed around noisy machinery.' No additional watchmen or warnings were provided by Conway, even though the work involved use of a chain saw.
. On seeing that the men were not clearing the platform, LeClerc started running to them blowing the airhorn, which he also waved over his head in an unsuccessful effort to warn the engineer. The engineer testified that if he had applied his brakes when he first saw LeClerc, the train would have stopped 500 feet before it reached the work crew. It was only when he passed LeClerc that he put on his brakes and started blowing his whistle; the latter had no effect, the whistle apparently also being drowned out by the noise of the chain saw.
Damages
1. What amount do you award the plaintiff to compensate for all financial losses suffered from the date of Mr. Crane’s death to the present?
$43,300.00
2. What amount do you award the plaintiff to compensate for future losses, that is, from today to some time in the future, based upon what you find would have been Mr. Crane’s life expectancy, and discounted to its present value?
$381,700.00
Total Damages ...... $425,000.00
Subtracted by ....... $212,500.00
FINAL AWARD ..... $212,500.00
. There is a surprising dearth of authority, both under the FELA and generally, concerning the standards governing the determination of how much of the total negligence should be attributed to each negligent party. See Prosser, The Law of Torts § 67, at 437-38 (4th ed. 1971); V. Schwartz, Comparative Negligence § 17.1, at 276-77 (1974); Philbrick, Loss Apportionment in Negligence Cases (pt. 2), 99 U.Pa.L.Rev. 766, 801-06 (1951); Prosser, Comparative Negligence, 51 Mich.L.Rev. 465 (1953). See also Uniform Comparative Fault Act § 2 & comment (1977), 12 U.L.A. 38-40 (Supp.1983). Much leeway is left to the trier of the facts.
. The court suggested use of the 2% discount figure sanctioned by Doca to the relatively small amounts representing the loss of services Crane would have performed for his family and for nurture of his son. In fact, as the judge observed, plaintiff had presented no evidence as to the amounts of these items, and thus the jury was at sea with respect to calculating an appropriate discount. Under these circumstances, we find no fault with the court’s suggestion.
. Plaintiff also contends that the court's instruction allowed the jury to reach a mischievous result if it based the award on non-inflated future earnings and then used a high discount rate which did not account for inflation. The court concluded that the testimony and evidence at trial adequately informed the jury that inflation should be taken into account if it chose to make an independent calculation of future earnings. App. at 716d. Although we do not necessarily share the district judge’s confidence that jurors should be presumed capable of ex