OPINION
Plaintiff CP III Rincon Towers, Inc. (“CP III” or “Plaintiff’) filed this action against Defendant Richard Cohen (“Cohen” or “Defendant”) seeking recovery from Defendant under a guaranty (the “Guaranty”) he signed. Plaintiff now moves for summary judgment on the issue of Defendant’s liability under the Guaranty. Defendant cross-moves for summary judgment on Plaintiffs claims. For the reasons set forth herein, Plaintiffs Motion for Summary Judgment is DENIED, and Defendant’s Motion for Summary Judgment is GRANTED.
A. The Loan
1. The Property and the Loan’s Successors
In 2005, Beacon Capital Partners (“Beacon”) purchased a mixed-use development project in San Francisco (“the Project”). (Def.’s 56.1 Stmt. ¶¶6-8.) The Project included a high-rise apartment building (“the Property”) with 320 units that Beacon intended to convert into condominium units. (Id. ¶¶ 6-7.) The Property owner was a part of the Project’s real estate owners’ association (“REOA”), which required payment of association fees. (PL’s 56.1 Stmt. ¶ 22.)
Defendant serves as president of Rincon EV Realty LLC, Rincon ET Realty LLC, and Rincon Residential Towers LLC (collectively, “Rincon” or “Borrower”). (Id ¶¶ 3-4.) In 2007, Beacon awarded Rincon the right to purchase the Property. (Def.’s 56.1 Stmt. ¶ 11.) Cohen then requested that Ben Milde (“Milde”), a senior managing director at Bear Stearns Commercial Mortgage, Inc. (“Bear Stearns” or, together with its successors in interest, “Lender”), send him a preliminary quote for financing the Property with a $110 million loan; Milde did so on May 17, 2007. (Id. ¶ 16.) The next day Defendant stated he would finance with Bear Stearns if it could close by the end of the month. (Id. ¶ 16.)
On June 8, 2007, Rincon and Bear Stearns entered into a $110 million Loan Agreement (“Loan” or “Loan Agreement”). (PL’s 56.1 Stmt. ¶ 7.) The final purchase price of the Property was $143 million with Rincon paying approximately $153.6 million, including closing costs. (Def.’s 56.1 Stmt. ¶¶ 12-13.) Borrower fulfilled payment using the $110 million Loan as well as its own reserves. (Id. ¶ 13.) To effectuate the transfer of the Property and the Loan, Rincon also executed a Deed of Trust, Promissory Note, Security Agreement and Allonge on June 8, 2007.
In early 2008, the Federal Reserve agreed to facilitate a merger between Bear Stearns and JP Morgan & Chase Co. (Def.’s 56.1 Stmt. ¶ 61.) In connection with the merger, the Federal Reserve created Maiden Lane LLC (“Maiden Lane”), which acquired the Property at issue here. (Id. ¶¶ 62-63.) BlackRock Financial Management Inc. (“BlackRock”) became Maiden Lane’s investment manager and operating adviser. (Id. ¶ 64.)
On February 5, 2010, BlackRock and Maiden Lane selected Carmel Partners Inc. as the winning bidder to purchase the Loan. (Id. ¶ 169.) Plaintiff CP III is a special purpose entity that was formed to facilitate the acquisition of the Loan. (Id. ¶ 2.) On April 16, 2010, CP III purchased the Loan for approximately $83 million, and it took assignment of the Loan, Promissory Note, Deed of Trust, Guaranty, Security Agreement and Allonge.
Bear Steams, Cohen, and Rincon retained national law firms to represent them during Loan negotiations. (Def.’s 56.1 Stmt. ¶¶ 20-21.) James Black (“Black”) from Bingham McCutchen LLP was the principal negotiator on behalf of Cohen and Rincon. (Id. ¶ 21.) Bear Stearns retained Cadwalader, Wickersham & Taft LLP (“Cadwalader”). (Id. ¶20.)
Because the Property’s net operating income was not believed to be able to cover the anticipated interest on the Loan, as a condition to grant the Loan, Bear Stearns required Cohen’s Guaranty.
On May 21, 2007, Bear Stearns provided Cohen with a non-binding draft term sheet that provided that the Loan and associated Guaranty would be “non-recourse to Borrower and acceptable Indemnitor with Lender’s standard carveouts.” (Furka Decl. Ex. 49.) There were two types of carveouts whereby Lender could seek repayment directly from Borrower: loss recourse and full recourse. Loss recourse means that Borrower would be liable for any losses suffered by Lender as a result of certain events.
On May 22, 2007, Bear Stearns’ counsel distributed initial drafts of the Loan documents. (Def.’s 56.1 Stmt. ¶22.) The Guaranty’s first draft provided that the “failure to pay charges for labor or materials or other charges that can create Liens on any portion of the Property” would
Black provided comments on the initial Loan draft on May 29, 2007. (Def.’s 56.1 Stmt. $ 24.) He again proposed striking the provision that would allow for loss recourse arising from a “failure to pay charges for labor or materials or that can create Liens on any portion of the Property.” (Furka Decl. Ex. 53, at 863.) He also proposed moving the full recourse carve-outs for the Indebtedness, voluntary Lien, Transfer, and SPE Provisions so they only would trigger loss recourse. (Id. at 863.) The next day, Black circulated comments on the Guaranty, which made the same proposals. (Id. Ex. 54, at 1006.)
On May 31, 2007, Cadwalader circulated a revised draft, which deleted the provision that provided for loss recourse for failure to pay bills that could create liens.
On June 4, 2007, Black raised concerns with the Guaranty, stating that “compromise language” was needed so that only “unpermitted Indebtedness, Liens and Transfers and Partition Actions will only become full recourse events — for example, if these breaches don’t have an MAE [material adverse effect], they should only trigger recourse to the extent of actual loss.” (Id. Ex. 56, at 2051; Peluso Decl. Ex. 5, at 2086.) A Cadwalader attorney responded to the compromise language request, writing, “We don’t think [the proposed limitations are] the case, but we will consider language if you wish to propose it.” (Furka Decl. Ex. 57, at 2105.)
Cadwalader circulated revised drafts on June 6, 2007, which rejected Black’s proposed material adverse effect limitations. (Def.’s 56.1. Stmt. ¶ 30.) Black provided
On June 7, 2007, Bear Stearns completed its Commitment Committee Memorandum on the Loan, which provided a brief summary of the transaction documents and a table that summarized events that would trigger recourse. (Furka Deck Ex. 45, at 26.) The table included full recourse carveouts for, inter alia, fraud, misrepresentation, willful misconduct, misappropriation, and voluntary bankruptcy. (Id.) In the table’s cell for “other carveouts, it stated “N/A.” (Id.) The table also incorrectly listed “gross negligence” as a carve-out. (Id.) On June 8, 2007, a revised final closing statement was circulated, which stated that “gross negligence” was not a carve-out but that there were “other” carveouts. (Id. Ex. 61, at 9007-08.) Black responded via email that same morning, commenting:
In the revised Guaranty and Loan Agreement, unpermitted Indebtedness was inserted as a full recourse occurrence. I’m not sure why the lender made this change, but to the extent it is required by lender, such an occurrence should be limited to actual loss or, if it is to be a full recourse event, it should be limited to “voluntary, material” Indebtedness.
(Peluso Deck Ex. 6.) That afternoon a conference call was held to discuss the recourse provisions. (Def.’s 56.1 Stmt. ¶ 36.) Another draft was sent on June 8, 2007; ultimately, Black’s proposed Indebtedness revisions were not present in the final Guaranty, but the draft shows for the first time the $250,000 threshold being inserted into the Indebtedness Provision. (Pb’s 56.1 Stmt. ¶¶ 45^47; Loan § 9.3(B)(iv); Guaranty ¶ 1.2(b)(iv).)
The Loan, Guaranty, Deed of Trust, Security Agreement, and Allonge were executed on June 8, 2007, with a promissory note evidencing the $110 million debt. (Def.’s 56.1 Stmt. ¶¶ 54-57.)
3. The Loan and Guaranty Documents
Between June 8, 2007 and the Loan’s maturity, Borrower only needed to pay the Loan’s interest. The Loan was scheduled to mature on June 12, 2009, with Borrower having a conditional option for a one year extension. (Loan § 1.1; Loan § 2.7.)
The Loan was conditionally non-recourse, but some events could trigger either loss or full recourse, whereby Lender could seek repayment directly from Borrower. (Pl.’s 56.1 Stmt. ¶¶ 16-17.) If Borrower did not meet those obligations, Defendant was liable for payment. Guaranty ¶ 1.1. Defendant’s loss recourse liability may be triggered, inter alia, by the SPE Provision, which occurs if Borrower fails “to maintain its status as a Single Purpose Entity in accordance with, the terms and provisions of the Loan Agreement or the Deed of Trust.” Guaranty ¶ 1.2(a)(vi). The loss recourse paragraph omits the mechanic’s liens provision, which was included in the original draft. Compare id. with Furka Deck Ex. 40. Cohen’s full recourse liability is set forth in paragraph 1.2(b) of the Guaranty; the three pertinent triggering events are the Indebtedness Provision, voluntary Lien Provision, and Transfer Provision. Guaranty ¶ 1.2(b)(iv), (v).
The Indebtedness and voluntary Lien Provisions provide that the debt is full recourse against Defendant “if Borrower fails to obtain Lender’s prior written consent to any Indebtedness (provided such
(a) all indebtedness or liability ... (including, without limitation, amounts for borrowed money and indebtedness in the form of mezzanine debt or preferred equity) ... and (g) obligations secured by any Liens, whether or not the obligations have been assumed (other than the Permitted Encumbrances and Permitted Equipment Financing).
Loan § 1.1. Although the Loan does not define “voluntary” or “voluntary Lien,” it defines “Lien” as:
any mortgage, deed of trust, lien, pledge, hypothecation, assignment, security interest, or any other encumbrance, charge or transfer of, on or affecting Borrower, the Property, any portion thereof or any interest therein, including, without limitation, any conditional sale or other title retention agreement, any financing lease having substantially the same economic effect as any of the foregoing, the filing of any financing statement, and mechanic’s, material-men’s and other similar liens and encumbrances.
Loan § 1.1.
The Transfer Provision provides for full recourse “if Borrower fails to obtain Lender’s prior written consent to any Transfer if required by the Loan Agreement or the Deed of Trust.” Guaranty ¶ 1.2(b)(v). The Loan states that a Transfer will occur if Borrower,
[w]ithout the prior written consent of Lender, ... sell, convey, mortgage, grant, bargain, encumber, pledge, assign, grant options with respect to, or otherwise transfer or dispose of (directly or indirectly, voluntarily or involuntarily, by operation of law or otherwise, and whether or not for consideration or of record) the Property or any part thereof or any legal or beneficial interest therein.
Loan § 5.2.10(b).
Concerning Rincon’s obligation to make payments under the REOA, Rincon was required to “pay all charges and other sums to be paid by Borrower pursuant to the terms of the REOA as the same shall become due and payable and prior to the expiration of any applicable grace period therein provided.” Loan § 5.1.24(b). The Deed of Trust contains a similar provision regarding mechanic’s liens. Deed of Trust § 3.6(a).
Finally, the Loan specifies that it is governed by New York law, with the exception that “the provisions for the creation, perfection, and enforcement of the lien and security interest created pursuant hereto and pursuant to the other loan documents shall be governed by” California law.
B. Events Leading to Foreclosure
1. Rincon’s Attempt to Extend the Maturity Date
In March 2008, Lender, Rincon, and Cohen engaged in unsuccessful negotiations aimed at amending the Loan. (PL’s Resp. to Def.’s 56.1 Stmt. ¶ 115.) In a letter dated, March 5, 2009, Borrower notified
On June 24, 2009 Bank of America, on behalf of Lender, sent Rincon a notice of default, asserting the Loan was not extended because Borrower failed to comply with Loan’s extension conditions. (Furka Decl. Ex. 77.) Rincon replied two days later, explaining it believed it complied with those requirements. (Id. Ex. 78.) During the fall and summer of 2009, Maiden Lane, Rincon, and Cohen attempted to negotiate new Loan terms; given those negotiations, Maiden Lane did not enforce its rights on the default. (Peluso Decl. Ex. 80, Leese Decl. ¶ 15.) Negotiations failed. (Id. ¶ 22.)
2. The Liens That Allegedly Triggered Defendant’s Full Recourse Obligations
When Rincon entered into the Loan, Lender was aware that it would commence construction at the Property, and the Loan required Rincon to perform certain renovations to the Property. (Def.’s 56.1 Stmt. 11105; Loan §§ 5.1.28, 7.1, Schedule II.) The Loan did not require Lender’s advance written consent to retain contractors. (Def.’s 56.1 Stmt. ¶ 105.) Rincon retained Angotti & Reilly (“Angotti”) to serve as the Property’s general contractor. (Id. ¶ 106.) Angotti retained Interior Design Services LLC (“IDS”) as a subcontractor. (Id. ¶ 107.) After Rincon withheld payment because it believed the work was unsatisfactory, Angotti filed a notice and claim of mechanic’s lien on December 28, 2008 for $766,420.30. (Def.’s 56.1 Stmt. ¶¶ 110-11.) One day earlier, IDS filed a mechanic’s lien totaling $36,400. (Id. ¶ 112; Pl.’s 56.1 Stmt. ¶ 65.) Additionally, Bacon Plumbing recorded a $62,314.20 mechanic’s lien against the Property on December 24, 2008; it partially released its claim on February 4, 2009. (Pl.’s 56.1 Stmt. ¶ 64; Def.’s Resp. to PL’s 56.1 Stmt. ¶ 64.) In 2009 Allsite Construction Co. (“Allsite”) filed two mechanic’s liens totaling $36,400.00 for work completed by VCS Inc. (“VCS”).
In 2010, Angotti sued Rincon, and the matter went into arbitration. (Def.’s 56.1 Stmt. ¶ 123.) On March 29, 2010, the arbitrator awarded Angotti $1,578,856.94 against Rincon, which included arbitration fees, attorneys’ fees, and interest; the arbitration award was confirmed by state court. (Id. ¶ 124.) Angotti then recorded a judgment lien in that amount. (PL’s 56.1 Stmt. ¶ 62.)
Additionally, the Property had an REOA lien imposed upon it. Rincon was a party to the Project’s REOA, and the Loan did not require Lender’s advance written consent before incurring REOA association fees. (Id. ¶¶ 133-34.) The REOA reserved the power to file liens in connection with disputed assessments for joint management costs. (Id.; Def.’s 56.1 Stmt. ¶ 132.) On December 23, 2008, Beacon recorded a lien for $688,845.98 because Rincon was past due on its REOA fees, having been delinquent from June through November 2008. (PL’s 56.1 Stmt. ¶¶48-49.) Rincon and Beacon entered into negotiations regarding their dispute over the REOA’s joint management costs, and Rin-con made payment on the lien by January 23, 2009. (Def.’s 56.1 Stmt. ¶ 140; PL’s Resp. to Def.’s 56.1 Stmt. ¶ 140; Suppl. Furka Decl. Ex. 21.) However, Beacon filed an additional REOA lien on May 12, 2009, and on September 25, 2009, Beacon amended it, reducing the amount claimed
C. CP III Seeking Recovery Under the Guaranty and Through Foreclosure
Plaintiff won the bid to purchase the Loan in February 2010 and acquired the Loan on April 16, 2010. In a letter dated April 15, 2010, Bank of America, as servi-cer for Maiden Lane and after Plaintiff’s approval, demanded payment of the Loan’s outstanding principal and interest.
Neither Rincon nor Cohen made any payment of the Loan’s principal. (Id. ¶¶ 68, 78.) On June 15, 2010, Plaintiff filed a Notice of Default, claiming Borrower owed it approximately $110 million. (Def.’s Resp. to Pl.’s 56.1 Stmt. ¶ 161.) As a trustee for CP III, on September 22, 2010, Fidelity recorded a Notice of Trustee’s Sale. (Def.’s 56.1 Stmt. ¶ 188.) The Property’s non-judicial foreclosure sale took place on October 12, 2010. (Id. ¶ 197.) CP III was the only bidder, and it purchased the Property with a credit bid price of approximately $73 million. (Id. ¶ 198.)
D. The Instant Suit
CP III commenced this action on June 14, 2010, seeking to recover at least $110 million from Cohen based on the Guaranty.
II. DISCUSSION
A. Legal Standard for a Motion for Summary Judgment
A district court should grant summary judgment when there is “no genuine dis
In assessing when summary judgment should be granted, “[t]he mere existence of a scintilla of evidence in support of the [non-movant’s] position will be insufficient; there must be evidence on which the jury could reasonably find for the plaintiff.” Jeffreys v. City of New York,
A court faced with cross-motions for summary judgment need not “grant judgment as a matter of law for one side or the other,” but “‘must evaluate each party’s motion on its own merits, taking care in each instance to draw all reasonable inferences against the party whose motion is under consideration.’ ” Heublein, Inc. v. United States,
In a contract dispute, summary judgment generally may be granted "only when the contractual language ... is found to be wholly unambiguous and to convey a definite meaning." Topps Co., Inc. v. Cadbury Stani S.A.I.C.,
B. The Voluntary Lien Provision Was Not Triggered
In its Complaint, Plaintiff contends the REOA, mechanic's, and judgment liens triggered Cohen's full recourse liability because "Borrower fail[ed] to obtain Lender's prior written consent to any ... voluntary Lien encumbering the Property (to the extent such consent is required under the Loan Agreement)." Guaranty ¶ l.2(b)(iv). While the Loan defines Lien, none of the Loan Documents define "voluntary" or "voluntary Lien." Defendant contends that the Disputed Liens are not voluntary Liens and thereby cannot subject him to full recourse liability.
In attempting to avoid Summary Judgment on the voluntary Lien Provision,
The Supreme Court has contrasted voluntary and involuntary claims in the bankruptcy context, explaining that “there are two types of secured claims (1) voluntary (or consensual) secured claims, each created by agreement between the debtor and the creditor ... and (2) involuntary secured claims, such as a judicial or statutory hen ..., which are fixed by operation of law and do not require the consent of the debtor.” United States v. Ron Pair Enters., Inc.,
C. The Transfer Provision Was Not Triggered
Plaintiff asserts that the Disputed Liens triggered Cohen’s full recourse obligations under the Transfer Provision. “Transfers” include, inter alia, acts that “mortgage, ... encumber, pledge, [or] assign,” interests in the Property. Loan § 5.2.10(b). Plaintiff claims, since the REOA, mechanic’s, and judgment hens are encumbrances, the Transfer Provision was triggered. Defendant, however, asserts that the definition of Transfer is ambiguous and parol evidence is thereby admissible to demonstrate that Cohen, Rincon, and Bear Stearns did not intend for the Disputed Liens to trigger for full recourse liability under the Transfer Provision.
1. “Transfer” is Ambiguous Under the Guaranty
a. Legal Standards for Ambiguity
Parties agree that the Guaranty is governed by New York law, see Guaranty ¶ 5.3, and New York law therefore shall be applied. See LaSalle Bank Nat'l Ass'n v. Nomura Asset Capital Corp.,
Under New York law, “[a]mbiguity is determined by looking within the four comers of the document, not to sources.” JA Apparel Corp. v.
The Second Circuit has explained that, under New York law, “words and phrases should be given their plain meaning, and the contract should be construed so as to give full meaning and effect to all of its provisions.” LaSalle,
an interpretation of a contract that has the effect of rendering at least one clause superfluous or meaningless ... is not preferred and will be avoided if Rather, an interpretation that gives a reasonable and effective meaning to all terms of a contract is generally preferred to one that leaves a part or of no effect.
Galli v. Metz,
When reviewing competing of contractual language, courts “need not determine which is the more likely interpretation,” but instead “merely decide whether [each] ... is reasonable to render the clause ambiguous.” Mellon Bank, N.A. v. United Bank Corp.,
b. Analysis
Under the plain language of the Loan and Guaranty, any Lien would trigger the Guaranty’s Transfer Provision. “Lien” is defined as, inter alia, “any mortgage, deed
Defendant, however, asserts that the Transfer Provision is ambiguous because it is capable of multiple meanings, is inconsistent with other Guaranty provisions, and would produce an absurd result. Because of this ambiguity, Defendant contends that extrinsic evidence should be admissible to demonstrate that Cohen, Rincon, and Lender did not intend to include the Disputed Liens as a trigger for full recourse liability.
One reason for the Transfer being ambiguous, Defendant asserts, is that its definition provides that “Borrower shall not ... (collectively, a ‘Transfer’): (i) sell, convey, mortgage, grant, bargain, encumber, pledge, assign.” Loan § 5.2.10(b). Defendant claims “shall not” means that, to constitute a Transfer, Borrower must take an affirmative action to cause an encumbrance. Defendant cites to no case law that considers such an argument, nor can the Court find any. Additionally, this argument fails to account for the Transfer definition’s parenthetical language, which modifies all the verbs in the definition’s clause, thereby making explicit that a Transfer may be the result of a “voluntary or involuntary” act. Moreover, the Loan is replete with “shall” being combined with passive actions. See, e.g., Loan § 5.1.4 (“Borrower shall permit agents ... to inspect the Property.”); Loan § 5.2.10(g) (“Lender’s consent shall not be required.”). A Transfer plainly can occur absent Rin-con’s affirmative act.
Defendant next asserts that reading Transfer to include mechanic’s liens as triggering full recourse liability would make other provisions of the Loan and Guaranty meaningless and redundant. If the definition of Transfer includes mechanic’s liens as a full recourse trigger, Defendant asserts that the Transfer definition inherently would render the SPE and voluntary Lien Provisions superfluous. The SPE Provision would be meaningless, Defendant contends, because violating the Loan’s SPE covenant — which among forty-four requirements also prohibits certain Liens — triggers only loss recourse under the SPE Provision. See Loan § 1.1, at 20-25; Guaranty ¶ 1.2(a).
Reading Transfer to include mechanic’s liens would not render the SPE Provision superfluous. The Guaranty’s SPE Provision for loss recourse is triggered if Rin-con fails “to maintain its status as a Single Purpose Entity in accordance with, the terms and provisions of the Loan Agreement or the Deed of Trust.” Guaranty ¶ 1.2(a)(vi). The SPE covenant mandates, inter alia, that Rincon pays taxes, uses separate stationary and checks bearing its name, maintains its own records, and provides Lender with complete financial statements. Loan § 1.1, SPE (xv), (xxvii), (xlii), (xlv). The SPE covenant also states that Rincon must not have any “judgments or Liens of any nature against it except for tax liens not yet due and the Permitted Encumbrances.” Id. SPE (xliv). Of the
However, reading all Liens to be Transfers would render the voluntary Lien Provision meaningless. Both Guaranty Paragraphs 1.2(b)(iv) and (v) trigger full recourse "if Borrower fails to obtain Lenders prior ~vritten consent" to any voluntary Lien or Transfer.
Neither Party’s proposed interpretation harmonizes all of the Guaranty and Loan’s terms. See India.com, Inc. v. Dalal,
2. Analysis of the External Evidence
Parties each contend that negotiations and extrinsic evidence demonstrate their purported definitions of Transfer.
At the onset of negotiations, Cohen that he would not sign anything but a bad-boy guaranty. Defendant’s of his desired contract at the onset of negotiations, however, does not demonstrate that the Guaranty was limited to such bad-boy acts. This is especially true given the Indebtedness Provision, which neither Party disputes may be by actions that do not fall within the general meaning of bad-boy acts. Likewise, the May 21, 2007 non-binding and initial draft term sheet noting that the Guaranty would be non-recourse except for Bear Stearns’ standard earveouts, which typically only included bad boy acts, is not dispositive. (Furka Decl. Ex. 34, Milde Dep. 86-87.) Cohen’s statement and the May 21st term sheet indicate where negotiations began and do not a final agreement.
However, the circulation and of the May 22, 2007 drafts of the Loan and Guaranty demonstrate that Bear Stearns, Rincon, and Cohen agreed that the mechanic’s and REOA liens would not trigger Cohen’s full recourse liability. The Guaranty’s first draft provided a loss not a full recourse&emdash;event would occur for the “failure to pay charges for labor or materials or other charges that can create Liens.” (Furka Decl. Ex. 52.) Black, who represented Rincon and Cohen, proposed striking that provision, as well as moving the Indebtedness, Transfer, and SPE Provisions from the full recourse paragraph to the loss recourse paragraph. On May 31, 2007, Bear Stearns accepted the proposal to strike the loss recourse provision and move the SPE Provision. Accordingly, Bear Stearns, Rincon, and Cohen agreed that simply having certain Liens, namely the REOA, mechanic’s, and judgment liens in question, would not trigger any liabilities under the
Although Plaintiff attempts to minimize Lender’s May 31st concession by pointing to subsequent negotiations of the full terms, Plaintiffs arguments do not change the fact that Rincon, Cohen, and Bear Stearns agreed that certain Liens&emdash; namely, the Disputed Liens&emdash;would not trigger Cohen’s loss recourse obligations. Plaintiff points to Black’s multiple and Bear Stearns’ subsequent to have Indebtedness, voluntary Liens, Transfers become full recourse events only if they have a material adverse effects. Plaintiff also points to Black’s June 8, 2007 request to limit full recourse Indebtedness to voluntary, material While Bear Stearns’ did not accept that limitation, an apparent was reached: the $250,000 threshold
This determination is reinforced by Bear Stearns’ common practice in similar negotiations.
Such an interpretation also avoids reading the contract in a commercially unreasonable or absurd manner. Lipper Holdings v. Trident Holdings,
Accordingly, after examining the extrinsic evidence, the overwhelming weight of the evidence demonstrates there is no dispute of material fact: Bear Stearns, Rin-con, and Cohen never intended for the Disputed Liens to trigger Defendant’s full recourse liability under the Transfer Provision. This determination also better harmonizes all Guaranty provisions and avoids absurd results. Defendant’s Motion for Summary Judgment is GRANTED and Plaintiffs Motion for Summary Judgment is DENIED with respect to the Transfer Provision. Plaintiffs claim that the REOA, mechanic’s, and judgment liens triggered Defendant’s full recourse liability under the Transfer Provision is dismissed.
D. The Indebtedness Provision Was Not Triggered
Plaintiff asserts that the untimely payment of the REOA charges and Angot-ti balance, as well as the Disputed Liens, triggered Cohen’s full recourse obligations under the Indebtedness Provision.
Parties agree that the untimely payments of REOA charges and Angotti balance constitute Indebtedness. See Loan § 1.1, Indebtedness (a). Under Indebtedness Provision, Cohen’s full recourse liability is triggered “if Borrower fails to obtain Lender’s prior written consent to any Indebtedness (provided such Indebtedness exceeds $250,000.00) ... [and] (to the extent such consent is required under the Loan Agreement”). Guaranty ¶ 1.2(b)(iv). Parties dispute whether written consent was required for the two tardy payments in question.
To avoid the Indebtedness Provision’s full recourse trigger, Plaintiff argues that Borrower needed Lender’s written consent before allowing the REOA charges and Angotti balance to become past due and before contesting those bills. This argument is based on the Loan’s requirement that Borrower pay the REOA charges and bills for labor and materials “when due.” Deed of Trust § 3.6(a); see Loan § 5.1.24(b). Defendant, however, contends that the Indebtedness Provision’s language, “Lender’s prior written consent to any Indebtedness,” inherently means the Guaranty only addresses situations in which Lender’s prior written consent is required before incurring the Indebtedness, which does not apply here because the Loan does not impose a prior written consent requirement before Borrower incurred REOA charges or employed contractors. Thus, Parties dispute the timing of “prior written consent.”
Plaintiffs strained reading of “prior written consent” fails to take into account the succeeding phrase in the Indebtedness Provision, namely “to any Indebtedness.” As Indebtedness is defined as any indebtedness, any liability, and certain obligations, the Provision is triggered if Borrower failed to obtain Lender’s prior written consent, if required, before becoming so indebted. The Provision does not make any reference to the timely payment of Indebtedness; rather it envisions situations in which the Loan expressly requires prior written consent before incurring certain indebtedness, liability, or obli
Although Plaintiff claims the Disputed Liens were also Indebtedness, Defendant argues those liens do not qualify as Indebtedness. The Court need not reach the issue of whether the Disputed Liens are Indebtedness because the Loan does not require prior written consent before Borrower encumbered the Property with the REOA, mechanic’s, or judgment liens. See Loan § 1.1, Liens. Thus, even if they constituted Indebtedness, the same analysis with respect to the two tardy payments holds true for the liens in question: because Borrower did not need Lender’s written permission before incurring the Disputed Liens, they cannot give rise to Cohen’s liability under the Indebtedness Provision.
Accordingly, Defendant’s Motion for Summary Judgment is GRANTED and Plaintiffs Motion for Summary Judgment is DENIED with respect to the Indebtedness Provision.
III. CONCLUSION
For the foregoing reasons, Defendant’s Motion for Summary Judgment is GRANTED and Plaintiffs Motion for Summary Judgment is DENIED. The Clerk is directed to enter judgment in favor of Defendant and to close the docket in the matter.
SO ORDERED.
Notes
. An allonge is the transfer of a promissory note. It is customary to send blank allonges to the custodian so the custodian would complete it if the note is transferred. (Furka Deck Ex. 35, Mclnerney Dep. 103.)
. Although Cohen asserts CP III is not Lender’s successor-in-interest due to gaps in the Loan’s chain of title, Defendant only provides an email attachment with a purported allonge to demonstrate this alleged defect. (Furka DecI. Ex. 72.) There is, however, overwhelming evidence that the attachment was made in error. Bear Stearns executed an Omnibus Assignment, assigning the Loan to U.S. Bank as
.As part of its intention to convert the Property to condominiums, Beacon did not engage in leasing activity or rent increases, and it let expiring leases become month-to-month leases at the same rate. (Def.'s 56.1 Stmt. ¶ 9.) As a result, before Rincon purchased the Property, it was only 71% occupied and was generating a net operating income of $2.1 to $3.4 million. (Pl.'s 56.1 Stmt. ¶ 20.)
. While there is not a precise meaning of bad-boy guaranty or precise actions that are forbidden under such a guaranty, the concept is not to act badly. A bad-boy guaranty often forbids fraud, the misallocation of funds, and a voluntary bankruptcy filing, among other prohibitions. (Suppl. Furka Decl. Ex. 3, at 82-83; Furka Decl. Ex. 34, Milde Dep. 86-87; Id. Ex. 35, Mclnerney Dep. 153-55.)
. Plaintiff does not allege that Rincon or Cohen’s loss recourse liability was triggered, nor can the Court find any situation in which Cohen would be liable for loss recourse, especially after the Property’s foreclosure.
. The Court shall refer to the recourse provisions at issue for resolving the instant Motions as the Indebtedness Provision, the voluntary Lien Provision, the Transfer Provision, and the SPE Provision. See Guaranty ¶ 1.2(a), (b). Additionally, the Loan defines "SPE” as Special Purpose Entity. Both Parties agree that the Guaranty’s Single Purpose Entity is the same as the Loan’s Special Purpose Entity. The Court shall refer to both as SPE.
. Defendant asserts, citing to deposition testimony of William Mclnerney ("Mclnerney”), an attorney representing Bear Stearns, that this removal meant that Bear Stearns "agreed that liens arising from disputed or unpaid bills would not be a trigger under the Guaranty.” (Def.’s 56.1 Stmt. ¶ 27.) Mclnerney's testimony, however, discussed his general practice, not the Loan and Guaranty at issue here, and he stated that he did not know why the specific language was removed. (Furka Decl. Ex. 35, Mclnerney Dep. 159-77.) He explained it was not his "practice to agree ... to take out a recourse trigger but then have it put into another section of the Loan Agreement without specifically discussing that with the borrower.” (Id. at 163-64.)
. Although Defendant contends New York Real Property Actions and Proceeding Law ("RPAPL”) section 1371 applies and prohibits Plaintiff’s recovery in the instant suit, California law governs the foreclosure proceedings and Defendant’s anti-deficiency protections. See Guaranty ¶¶ 5.16-5.19; Loan§ 10.3.
. Defendant claims that it paid VCS and that the Allsite lien was a result of a dispute between Allsite's former business partners, one of whom formed VCS. (Def.'s 56.1 Stmt. ¶¶ 120-22; Furka Decl. Exs. 109-10; 2d Suppl. Furka Decl. Ex. 16.)
. Despite Lender’s assertion of Rincon's default in June 2009, Lender did not demand payment of the default or matured principal, did not initiate foreclosure proceedings, and continued to accept interest due. (Def.’s 56.1 Stmt. ¶ 76; Pl.’s Resp. to Def.’s 56.1 Stmt. ¶ 76.)
. On February 16, 2010, Rincon filed a lawsuit in California Superior Court. Rincon EV Realty, LLC v. CP III Rincon Towers, Inc., No. CGC 10-496887, Cal.Super.Ct. San Francisco Cnty. (the "California Action"). Alleging that Maiden Lane engaged in wrongful conduct, Rincon sought a declaratory judgment that Maiden Lane waived its security interest in the Loan and that Rincon held title to the Property, free of any claim by Lender. (Pelu-so Decl. Ex. 30, at 5, 7.) Cohen was not a named party in the California Action. Rincon later sought a preliminary injunction against the foreclosure, which was denied on July 7, 2010; its appeal was also denied. (PL's 56.1 Stmt. ¶ 75.) Rincon added CP III and its affiliated entities as defendants on September 3, 2010. (Def.’s Resp. to PL's 56.1 Stmt. ¶ 164.) A bench trial began on July 9, 2012, and the court issued a Statement of Decision on April 2, 2013, entering Judgment in favor of all defendants for all claims. Rincon has appealed that Judgment, which is pending.
. As will be discussed, infra Part II.E., the voluntary Lien and Indebtedness Provisions sire only triggered if the Loan required written consent and Borrower failed to obtain it.
. While Parties and their experts agree that the general practice in the industry is to limit full recourse provisions to willful, egregious, or other bad-boy conduct, Plaintiff contends that the Loan and Guaranty were not typical because the Property's performance made the Loan a risky investment. Even if the Property's performance and thereby the Loan's risk were reasons for a more expansive Guaranty, that does not trump the actual Loan negotiations nor explain why the definition of Transfer was broader than industry expectations.
. Bolstering this finding is the fact that Lien definition expressly included "mechanic's, materialmen's and other similar liens and encumbrances” whereas the Transfer definition’s only mention of liens was via the word "encumber.”
. While Plaintiff asserts that accepting Defendant’s interpretation would mean that no Indebtedness would ever trigger the Guaranty, that is not the case. See, e.e., Loan § 5.1.11(e).
. Had Bear Stearns, Rincon, and Cohen intended Plaintiff’s purported interpretation, they could have added "past-due” language to the Indebtedness Provision, as they did in so many other terms of the Loan and Guaranty. The Court will not read the Guaranty to include such language. See Riverside S. Planning Corp. v. CRP/Extell Riverside, L.P.,