49 Iowa 286 | Iowa | 1878
I. The petition alleges that the railroad, the construction of which is provided for in the instrument sued upon, was completed at the time and in the manner stipulated, and that the railroad company issued to defendant certificates for the stock provided for in the note, which it is ready to deliver to defendant upon payment of the note.
The answer of defendant admits the execution of the note, but denies generally all allegations of the petition not admitted. It alleges as a defense that the note was given to secure the construction and the equipping with rolling stock a continuous line of railroad connecting Montezuma and Grrinneil, and that defendant’s stock subscription contained such condition, and that this condition has not been performed, the railroad having been built from Montezuma to a point on the Central Railroad' of Iowa, three miles from G-rinnell. These allegations, with other matters which need not be specified here, were stricken from the answer on the grounds that they tendered irrelevant and immaterial issues, and contradicted the terms of the instrument in suit. The correctness of this ruling is assailed. It first demands our attention.
IY. It is insisted that the evidence fails to show that-the road constructed from the Central Road to Montezuma was completed within the time prescribed by the contract. This was a question of fact for the court below. We think there is no such absence of evidence in support of the judgment upon the point as to authorize us to interfere.
W. Certain rulings of the court upon the admission of evidence are assigned for error. They are not discussed in the argument of plaintiff. The errors assignéd therein must, under frequent rulings of the court, be considered as waived.
The judgment of the court below, for the error pointed out, must be
Reversed.