Constar, Inc., and David Butler Co. v. Plumbers Local 447Constar, Inc., and David Butler Co. v. Plumbers Local 447
I. FACTS.
This is an action for damages under § 303 of the National Labor Relations Act, as amended,
Constar, the general contractor for a building, contracted for the plumbing work with Ponderosa Plumbing, and Ponderosa had a dispute with defendant union. At the construction site, which was fenced, Constar designated one gate as “reserved” for Ponderosa. There, the union could and did picket whenever Ponderosa was doing work or having supplies delivered. The other gate was for the use of all others working on the building, and there the Union was not to picket. This arrangement has become common at construction sites. It was developed to accommodate the right of the union to picket the employer with whom the union has a dispute, the “primary” employer, while avoiding unlawful, “secondary,” picketing of other employers on the job, with whom the union has no dispute. The latter activity is prohibited under § 8(b)(4) of the Labor Management Relations Act,
Both Ponderosa and the Union complied with this system most of the time. On several occasions, however, Ponderosa used the neutral gate. In three controverted instances of this kind, and for a total of eight days, the Union responded by picketing the apparently “polluted” neutral gate, causing certain work stoppages, until Cons-tar “reestablished” the gate as neutral, at which point the picketing stopped. We need not duplicate the district court’s detailed description of these events.
See Constar, Inc. v. Plumbers Local 477,
E.D. Cal., 1983,
Some of the judge’s other findings are as follows:
The primary dispute began when Union agent Rotz wrote a letter to Ponderosa asking that Ponderosa pay union scale to its non-union employees. This was the ostensible object of the Union’s picketing of Ponderosa; the Union was not trying to organize Ponderosa’s employees. The actual purpose of the picketing was “to make life sufficiently miserable for Ponderosa Plumbing — within legal boundaries, as the parties understood them — that no presently organized plumbing contractor would think it worthwhile to go non-union. The Union sought to do this by picketing Ponderosa,
Constar and the Union were essentially playing a game, as each tried to assert its maximum advantage within the law: the Union by picketing the neutral gate whenever it became “polluted,” until Constar complained and “reestablished” it, and Constar by threatening the Union with § 303 liability. In this game, each side made incidental errors. “At various times during the course of the picketing the union may well have technically violated Moore Dry Dock standards ... [but] those violations do not represent significant evidence that the Union had a prohibited purpose.” Id. at 1454. As for Constar, “there were instances of ‘gate pollution’ ... in which the neutral ‘access point’ was used by the primary’s employees ... [but] these isolated instances do not demonstrate a significant breakdown of the reserve gate system.” Ibid.
The court concluded, “Both the Union and management tried to obey the law, and for the most part they did so. The occasional failure of Ponderosa to strictly adhere to the reserve gate system on the one hand, and the Union’s occasional failure to comply with Moore Dry Dock standards on the other, simply have no cognizable consequences under the circumstances of this case.” Ibid.
II. THE LAW.
The reserve gate system at construction sites is an attempt to make concrete the application of the standards devised by the National Labor Relations Board in
Sailors’ Union of the Pacific (Moore Dry Dock),
1950,
Literal compliance (or failure to comply) with the Moore Dry Dock standards does not preclude (or establish) a § 8(b)(4) violation or associated § 303 liability if the district court determines that the totality of the circumstances demonstrate impermissible secondary intent (or lack of it). Cons-tar, as the complaining party, had the burden of proving the Union’s unlawful intent.
Constar makes three arguments on appeal. First, it argues that any picketing of a neutral gate automatically violates § 8(b)(4) under
Moore Dry Dock,
in the absence of legally significant gate pollution. But although noncompliance with the
Moore Dry Dock
rules may provide evidence of illegal secondary intent, the rules should not be “mechanically applied so that a violation of one of the standards [is] taken to be presumptive of illegal activity.”
Electrical Workers,
Second, Constar argues that the district court improperly required it to meet a higher standard of proof of a § 8(b)(4) violation in a § 303 action. Constar refers to the court’s discussion of use by certain other courts in § 303 suits of the NLRB’s evidentiary standards in § 8(b)(4) enforcement proceedings.
Third, Constar argues that the Union violated § 8(b)(4) by intentionally failing to minimize the secondary effects of its picketing.
See Electrical Workers,
Affirmed.