Opinion for the Court filed by Circuit Judge RANDOLPH.
Thе Department of the Interior and the Environmental Protection Agency, conservation groups, 1 and the Penobscot Indian Nation petition for review of the Federal Energy Regulatory Commission’s relicens-ing of a hydroelectric project in north-central Maine. The issues presented go mainly to the adequacy of the Commission’s consideration of the various factors governing license renewals. Because the Commission gave sufficient attention to these factors and carefully explained its conclusions, the petitions are denied.
I
Located on the West Branch of the Pe-nobscot River, the Ripogenus and Penob-scot Mills Hydroelectric Projects produce approximately 108 megawatts of power for Great Northern Paper mills in Millinocket and East Millinocket, Maine. The projects consist of a series of reservoirs, dams, and powerhouses. This case focuses on one of the dams — the 1262 foot long Stone Dam, which is part of the Penobscot Mills Project. 2 Constructed in 1899, Stone Dam diverts water through a canal to a 37 megawatt powerhouse. This diversion blocks the main channel of the Penobscot’s West Branch for a 4.5 mile stretch known as the “Back Channel.” Because of Stone Dam, the Back Channel receives only leakage flows of 2 to 5 cfs (cubic feet per second), except for occasional “spillage” when flows exceed power requirements.
The Penobscot Mills Project, like any project used for the “development, transmission, and utilization of power across, along, from, or in any of the streams or other bodies of water over which Congress has jurisdiction,” requires a license from the Federal Energy Regulatory Commission. 16 U.S.C. § 797(e). When the original license for Penobscot Mills expired at the end of 1993, Great Northern applied for a new one. The Commission issued a Final Environmental Impact Stаtement analyzing three different proposals regarding the new license: the “Applicant’s Proposal,” in which Great Northern would “operate the project! ] nearly as it has over the past 50 years” with some new environmental and recreational enhancements but no increased flows in the Back Channel; “Alternative 1,” which reflected the Interi- or Department’s recommendations for enhancements including minimum flows of 350 to 500 cfs in the Back Channel;
3
and “Alternative 2,” recommending “enhancement measures intermediate between those proposed by GNP and those in Alternative 1.” FEIS at xix. As a baseline for comparison, the Commission adopted the terms and conditions of the existing license as the “no action” option. The impact statement recommended a modified version of Alternative 2 that did not in-
Shortly after issuance of the final impact statement, the Commission granted a new license for Penobscot Mills. 4 See 77 F.E.R.C. ¶ 61,068 (1996). The order conditioned the license on Great Northern’s commitment to wetland enhancements, project boundary expansion, and increased flows into Millinocket Stream. See id. at 61,275-79. As to the Back Channel, the Commission decided not to order minimum flows “given the modest fisheries benefit likely to occur and the significant adverse impact on the project’s energy benefits,” id. at 61,276,. a decision it affirmed on rehearing, see 85 F.E.R.C. ¶ 61,316 (1998), and reconsideration, see 86 F.E.R.C. ¶ 61,-184 (1999).
II
“In deciding whether to issue any license [for hydroelectric projects,] the Commission, in addition to the powеr and development purposes for which licenses are issued, shall give equal consideration to the purposes of energy conservation, the protection, mitigation of damage to, and enhancement of, fish and wildlife (including related spawning grounds and habitat), the protection of recreational opportunities, and the preservation of other aspects of environmental quality.” 16 U.S.C. § 797(e). The Federal Power Act also requires the Commission to include conditions for the “protection, mitigation and enhancement” of fish and wildlife affected by the project, such conditions to be “based on recommendations received pursuant to the Fish and Wildlife Coordination Act (16 U.S.C. 661 et seq.) from the National Marine Fisheries Service, the United States Fish and Wildlife Service, and State fish and wildlife agencies.” 16 U.S.C. § 803(j)(l). The Commission retains authority to decide that recommended conditions are “inconsistent with the purposes” of the FPA оr other laws, in which event it shall of course reject them. 16 U.S.C. § 803(j)(2);
see United States Dep’t of the Interior v. FERC,
The petitioners contend that the Commission’s rejection of minimum flow requirements in the Back Channel violates these Federal Power Act provisions and the National Environmental Policy Act, see 42 U.S.C. § 4321 et seq. Their arguments can be grouped into two categories: that the Commission did not fully recognize the recreational and environmental (ie., non-power) benefits that would have resulted if it had imposed minimum flow requirements; and that the Commission inflated the economic costs Great Northern would incur from increased Back Channel flows.
A. Nonpower Issues
The main argument of the federal petitioners is that the Commission should not have treated existing conditions at Stone Dam as the baseline “no action” option because this caused “the Commission to ignore ongoing impacts directly attributable, to the new license....” Brief for the Federal Petitioners at 29. We think there is nothing .to this objection. The statute — 16 U.S.C. § 803(j) — invites a comparative inquiry. It charges the Commission with the duty of protecting, mitigating the damage to, and enhancing “fish and wildlife (including related spawning grounds and habitat) affected by the development, operation and management of the project.” To do this properly the Commission must compare what might occur to fish and wildlife if the license does not include protection for nonpower resources against what will occur with conditions im
Given the language of § 803(j), the Commission certainly had the leeway to conduct its comparative assessments using existing conditions as a baseline. To the reasons just mentioned, we incorporate by reference those given in
American Rivers v. FERC,
In any event, the baseline business has the whiff of a red herring. Baseline or no baseline, the question is whether the Commission has fully examined options calling for greater or lesser environmental protection. Here the Commission spoke of environmental “benefits” and the economic “costs” to Great Northern of options calling for stronger environmental protection. It could just as easily have spoken of economic “benefits” to Great Northern from licensing the project and environmental “costs.” So long as the Commission adequately examines both the power and nonpower impacts of recommended licensing conditions, we do not see why it matters on which side of the equation environmental concerns are placed. In issuing the new licenses in these proceedings, the Commission adopted twelve of Interior’s fourteen recommended environmental enhancements while using an existing conditions baseline. See FEIS tbls.5-8 to 5-9, at 5-20 to 5-21, adopted at 77 F.E.R.C. at 61,275. This in itself proves that the federal petitioners are mistaken in thinking that an existing conditions baseline preordains the rejection of any new conditions for the protection of fish and wildlife. So long as the Commission examines options that includе recommended environmental enhancements, its choice of a baseline will not prevent it from giving “equal consideration” to nonpower values. 5
Petitioners also argue that the Commission did not give “equal consideration” to nonpower values because it refused to assess in economic terms the nonpower benefits that would result from restoring significant flows to the Back Channel. Restored flows, petitioners believe, would attract anglers and Whitewater rafting enthusiasts to this 4.5 mile stretch of river. In the rehearing order, the Commission explained its refusal to quantify these nonpower benefits: “[T]he public-interest balancing of environmental and economic impacts cannot be done with mathematical precision, nor do we think our statutory obligation to weigh and balance all public interest considerations is served by trying to reduce it to a mere mathematical exercise.... [F]or non-power resources such аs aquatic habitat,
Petitioners’ final complaint under this heading is that the Commission did not focus on the possibility of a brook trout 6 fishery in the Back Channel. In its original order, the Commission observed that “fish species such as brook trout, eels, minnows and suckers would benefit slightly from the recommended flows, [but] the Back Channel would at best only produce several hundred adult land-locked salmon.” 77 F.E.R.C. at 61,275. The order then explained why the Back Channel would not be a desirable habitat for land-locked salmon, but did not mention brook trout again. See id. On rehearing, the Commission stated that there was “a low likelihood of re-establishing limited habitat” for brook trout. 85 F.E.R.C. at 62,243. It relied, at least in part, on “a Maine Department of Inland Fish and Wildlife priority to maintain and protect fishery resources elsewhere- in the project area.” Id. “During dry years, requiring minimum flows above leakage in the Back Channel could affect the ability to maintain constant flows in the West Branch and Millinocket Stream,, and lake level in the North Twin reservoir, which could cause stress and potential damage to salmon and trout populations in those areas.” Id. Given the plentiful brook trout fisheries in the Penobscot Mills-Ripogenus area, the Commission cannot be faulted for believing that adding another 4.5 mile stretch would have little benefit. See id.
The Federal Power Act requires the Commission to consider the recommendations of the United States Fish and Wildlife Service and State fish and wildlife agencies.
7
See
16 U.S.C. § 803(j)(l). Even when the recommendations of federal and state agencies are in concert, those agencies do not have “veto рower” over Commission licensing decisions.
Department of Interior,
B. Power Issues
The Commission stated that the “reduction in the project’s ... annual energy benefits for the Back Channel flows outweighs the enhancement in aquatic resources that the flows would produce.” 77 F.E.R.C. at 61,276. The Commission calculated this annual reduction as $916,000 8 (6% of the project’s total benefits), see id., based on the price of purchasing replacement power from the least-cost alternative source — Bangor Hydro & Electric Company, 9 see FEIS § 2.4.4, at 2-33 to 2-34.
Petitioners complain that the Cоmmission failed to consider the alternative of Great Northern conserving energy, something the statute requires the Commission to consider. See 16 U.S.C. §§ 797(e), 808(a)(2)(C); see also 42 U.S.C. § 4332(2)(E); 40 C.F.R. § 1502.14. They put it this way: “By considering conserved power as the least cost alternative to hy-dropower, rather than the more expensive purchased power used by the Commission, the cost of environmental enhancements, such as Back Channel flows, are much lower.” Final Brief for Petitioners Conservation Law Foundation, et al. and Trout Unlimited at 12. But the Commission did consider the alternative of energy conservation. After examining Great Northern’s plant data, the Commission concluded that the mills had recently increased energy efficiency as the result of plant modernization efforts and the use of steam generation and that no reliable evidence supported petitioners’ view that “enormous conserved power potential” still existed at the mills. See FEIS E-3, cited in 77 F.E.R.C. at 61,269 n. 16; id. at E-24. The final impact statement alsо noted that Great Northern, “operating as a private for-profit enterprise, would have a strong economic incentive to maximize savings from conservation and not waste electric power, particularly as it manufactures an energy-intensive product.” Id. at E-23, cited in 85 F.E.R.C. at 62,243 n. 14. Any conservation that did occur would be “used to displace higher cost fossil fuel power ... [sjince the entire output from the two projects supplies only a portion of GNP’s total annuаl power needs.... ” Id., cited in 85 F.E.R.C. at 62,243 n. 14. We see no ground for disagreeing with this reasoning. The Penobscot Mills (31% of energy needs) and Ripogenus (19% of energy needs) Projects supply only half of the energy needed for Great Northern’s paper manufacturing. See 77 F.E.R.C. at 61,242, 61,270. Until the company’s conservation measures achieved a 50% reduction in its energy needs (something no one contends is likely), the consequence of increased energy efficiency would be a decrease in the cоmpany’s purchase of other, more expensive, sources of power. Thus, the “replacement cost” of reduced hydroelectric power would still be the price of power from Bangor, namely $916,OOO. 10
III
The Penobscot River Basin is “home to the Penobscot Indian Nation (PIN), much of whose cultural heritage is closely associated with the river and the resources it provides.” FEIS § 3-1, at 3-1. Under the Maine Indian Claims Settlement Act, the “‘Penobscot Indian Reservation’” is defined as “the islands in the Penobscot River reserved to the Penоbscot Nation by agreement with the States of Massachusetts and Maine consisting solely of Indian Island, also known as Old Town Island, and all islands in that river northward thereof that existed on June 29, 1818.... ” 25 U.S.C. § 1722(i) (incorporating 30 Me. Rev.Stat. Ann. § 6203(8)). The Penobscot Nation claims that its reservation includes the islands in the West Branch of the Penobscot. The State of Maine disagrees, contending that nothing “even remotely suggests that any land or islands in any branches or tributaries of the Penobscot River were being reserved” to the Tribe. FEIS § 4.11.1.2, at 4-69.
The land issue is of some consequence to this case. The Tribe believes it should have been a consulting party to the
The Tribe also contends that increased flows in the Back Channel would provide its members with canoe access to religious sites, which means that the Commission violated the American Indian Religious Freedom Act. This statute requires the “United States to protect and preserve for American Indians their inherent right of freedom to believe, express, and exerсise the traditional religions of the American Indian ... including but not limited to access to sites.... ” 42 U.S.C. § 1996. The Commission’s response is conclusive: even with flows of 350 cfs, canoe navigation of the Back Channel would not • be possible.
See
77 F.E.R.C. at 61,275 n. 39. The Commission also noted that “there is a nearby canoe route on the Penobscot that permits canoe passage to the same sites” — presumably the route the Tribe has used since 1899.
See
85 F.E.R.C. at 62,243. Federal agencies are to consider, “but not necessarily to defer to, Indian religious values.”
Wilson v. Block,
The petitions for review are denied.
Notes
. American Rivers, American Whitewater Affiliation, Appalachian Mountain Club, Conservation Law Foundation, and Trout Unlimited.
. Petitioners raise no specific objection to the Commission's order relicensing the Ripogen-us Project, see 77 F.E.R.C. ¶ 61,316 (1996), though that order was also listed in the petitions for review.
.Interior initially recommended flows of 500 cfs and later increased the recommendation to 945 cfs. See 85 F.E.R.C. at 62,242 n. 6. In its petition for rehearing before the Commission, however, Interior only "arguefd] for a minimum flow 350 cfs.” Id. at 62,242.
. During the interim, the Commission had issued annual renewals of the Penobscot Mills license under the same terms as the expired license. See 16 U.S.C. § 808(a).
. We also agree with the
American Rivers
court,
see
. A “brook trout” (Salvelinus fontinalis) is actually a char. “Chars are distinguished from trout by their mouth structure; the vomerine bone in the center of a trout's mouth has teeth all along it, while the vomer of the char has only a few teeth on the front end of the bone.” AJ. McClane, , ed., McClane's New Standard Fishing Encyclopedia and International Angling Guide 207 (1998 ed.).
. The same provision requires the Commission to "attempt to resolve any inconsistency” between its proposed license and other agency recommendations. See 16 U.S.C. § 803(j)(2). The Commission did so in a "dispute-resolution meeting with representatives from Interior on February 8, 1996.” 77 F.E.R.C. at 61,274.
. The Commission cоncluded that the annual cost of Interior’s request for 950 cfs would be $2.5 million, or 16% of the project's power production. See 77 F.E.R.C. at 61,274-75.
. The Commission (as well as the parties) assume that Great Northern would purchase fossil fuel power — not hydro power — from Bangor.
.Although conservation would not change the $916,000 replacement cost of increased Back Channel flows, it would reduce Great Northern's total energy costs. But it was the magnitude of the replacement cost, not the impact it would have on the company's overall economic condition, that led the Commission to reject the proposal for increased Back Channel flows. See infra note 11.
. Petitioners' pre-argument motion to remand the case to the Commission for the taking of additional evidence,
see
16 U.S.C. § 8257(b), is denied. In November 1999, Great Northern Paper submitted an application to the Commission seeking the transfer of the Penobscot Mills license to a new subsidiary, Great Northern Energy. A subsidiаry of Duke Energy Corporation has a minority interest in Great Northern Energy. Petitioners believe these developments affect two of the Commission findings: that Back Channel flows could threaten the mills’ economic viability and that expanded conservation efforts are not plausible. We do not see, however, how these developments could alter the two dominant factors in the Commission's decision: the replacement energy cost of $916,000 and the minimal (perhaps even detrimental) effect on fisheries.
See
77 F.E.R.C. at 61,275 ("Interior’s recommendations ... would entail a significant reduction in energy benefits on behalf of only marginal improvements to aquatic habitat....”);
id.
at 61,276 ("Given the modest fisheries benefit likely to occur and the significant adverse impact on the project’s energy benefits, we are not requiring minimum flows for the Back Channel.”). It does not "clearly appear that the new evidence would compel or persuade to a contrary result,” so we deny the motion.
Friends of the River v. FERC,
. The Tribe raises several other arguments that do not warrant written exposition. These have been considered and rejected.