210 Conn. 349 | Conn. | 1989
This is an appeal from a declaratory ruling of the department of public utility control (DPUC).
Examination of the record discloses that on June 8, 1987, SCRRRA filed a petition with DPUC pursuant to General Statutes §§ 4-176,
In accordance with General Statutes § 16-2 (c),
On November 5,1987, CL&P filed an administrative appeal in the Superior Court pursuant to General Stat
The defendant SCRRRA is a municipal resource recovery authority established by the joint resolution of its eleven member towns,
The plaintiff CL&P is a public service company that sells gas and electricity to its various customers throughout Connecticut. It either purchases the electricity at a wholesale price or generates the electricity at a cost that is generally lower than the price for which it sells it to others. In regulatory parlance, this is called the “avoided cost” of the electricity. See General Statutes § 16-243a (a).
CL&P’s customers include residents in eight of the eleven communities belonging to SCRRRA. Its service area, however, does not include the town of Norwich, the Jewett City borough of Griswold or the entire city
As owner of the proposed private power production facility, SCRRRA will be a private power producer within the meaning of General Statutes § 16-243b (a) (3).
SCRRRA’s facility, however, in addition to being a private power production facility will also be a resources recovery facility within the meaning of General Statutes § 22a-260 (11).
The DPUC ruling concluded that § 16-243e required CL&P to purchase all of SCRRRA’s electrical output for twenty-five years and to pay for the same at the “municipal rate” for the first twenty years of the contract. Over the term of the contract, the resulting CL&P subsidy is estimated to be $105,000,000.
CL&P appealed this ruling contending that § 16-243e as construed by DPUC: (1) preempts the letter and purposes of the federal Public Utility Regulatory Policies Act of 1978 in violation of the supremacy clause of the United States constitution; (2) violates the commerce clause of the United States constitution; (3) unconstitutionally takes CL&P’s property for public use without just compensation; and (4) unconstitutionally deprives CL&P of the equal protection of the laws. CL&P further argues that DPUC misconstrued § 16-243e in entering its order. We agree with CL&P that the statute was misapplied to the factual circumstances evident here and do not, therefore, reach the constitutional issues raised. We, therefore, remand the matter for further proceedings.
CL&P argued to DPUC that only 70 percent of the municipal solid waste that would fuel the resources recovery facility came from municipalities served by CL&P. CL&P argued that it should therefore have to pay for only 70 percent of the electrical output at the higher municipal rate required by § 16-243e and that it should be able to purchase the remaining 30 percent
Generally, this court accords “considerable deference to the construction given a statute by the administrative agency charged with its enforcement.” Sutton v. Lopes, 201 Conn. 115, 120, 513 A.2d 139, cert. denied sub nom. McCarthy v. Lopes, 479 U.S. 964, 107 S. Ct. 466, 93 L. Ed. 2d 410 (1986). However, “the construction of a statute on an issue that has not previously been subjected to judicial scrutiny is a question of law on which an administrative ruling is not entitled to special deference.” Schlumberger Technology Corporation v. Dubno, 202 Conn. 412, 423, 521 A.2d 569 (1987).
General Statutes § 16-243e establishes a special rate to be paid by electric companies for the purchase of “electricity generated by a resources recovery facility . . . owned by or operated by or for the benefit of a municipality . . . .” This rate is “the same rate that the electric company charges the municipality or municipalities for electricity.” General Statutes § 16-243e. The special rate to be paid by the electric company under § 16-243e, therefore, is the same rate that it charges the municipality for electricity. We emphasize that these rates are to be equivalent. If the electric company is not charging the municipality anything for its electricity, it follows that the municipality may not charge the electric company under § 16-243e for the electricity it may produce. Since CL&P was charging Groton, Norwich and Jewett City nothing for electricity, CL&P is not required to pay SCRRRA at the munic
This, of course, is not to say that CL&P has no obligation to purchase the electricity. General Statutes § 16-243a (b) provides in relevant part: “Each electric public service company . . . shall: (1) Purchase any electrical energy and capacity made available ... by a private power producer . . . .” General Statutes § 16-243a (c) (2) provides in relevant part: “The rates for electricity purchased from a private power producer shall be based on the full avoided costs of the electric public service company . . . regardless of whether the purchaser [electric public service company] is simultaneously making sales to the private power producer.” Here there is no statutory linkage between the rate paid and the rate charged, simply a clear mandate to purchase all of the electricity at the avoided costs of the electric public service company.
To the reserved question “Does the Decision of the Department of Public Utility Control, dated October 6, 1987, in Docket No. 87-06-12 (‘Decision’) err in interpreting and applying Section 16-243e of the General Statutes by requiring plaintiff The Connecticut Light and Power Company (‘CL&P’) to purchase all of the electricity generated by defendant Southeastern Connecticut Regional Resources Recovery Authority (‘SCRRRA’)?” the answer is “Yes.” There is error and the matter is remanded to DPUC for a recalculation of the rates to be paid by CL&P to SCRRRA through
No costs will be taxed in this court to either party.
In this opinion the other justices concurred.
General Statutes (Rev. to 1987) § 4-176 provides: “declaratory rulings. Each agency may, in its discretion, issue declaratory rulings as to the applicability of any statutory provision or of any regulation or order of the agency, and each agency shall provide by regulation for the filing and prompt disposition of petitions seeking such rulings. If the agency issues an adverse ruling, the remedy for an aggrieved person shall be an action for declaratory judgment under section 4-175 unless the agency conducted a hearing pursuant to sections 4-177 and 4-178 for the purpose of finding facts as a basis for such ruling, in which case the remedy for an aggrieved person shall be an appeal pursuant to section 4-183. If the agency fails to exercise its discretion to issue such a ruling, such failure shall be deemed a sufficient request by the plaintiff for the purposes of section 4-175. Rulings disposing of petitions have the same status as agency decisions or orders in contested cases.”
This section was subsequently revised by Public Acts 1988, No. 88-317.
General Statutes § 16-243a (c) provides in relevant part: “The department of public utility control, with respect to electric public service companies . . . shall establish rates and conditions of service for: (1) The purchase of electrical energy and capacity made available by a private power producer .... The rates for electricity purchased from a private power producer shall be based on the full avoided costs of the electric public service company . . . regardless of whether the purchaser is simultaneously making sales to the private power producer.”
General Statutes § 16-243e provides: “Any electric company, as defined in section 16-1, purchasing electricity generated by a resources recovery facility, as defined in section 22a-260, owned by or operated by or for the benefit of a municipality or municipalities, shall enter into a contract with the owner of such facility requiring the electric company to purchase such
General Statutes § 16-2 (c) provides: “Any matter coming before the authority may be assigned by the chairperson to a panel of three commissioners, not more than two of whom shall be members of the same political party. Except as otherwise provided by statute or regulation, the panel shall determine whether a public hearing shall be held on the matter, and may designate one or two of its members to conduct such hearing or appoint an examiner to ascertain the facts and report thereon to the panel. The decision of the panel, if unanimous, shall be the decision of the authority. If the decision of the panel is not unanimous, the matter shall be referred to the entire authority for decision.”
General Statutes § 16-8 (a) provides in relevant part: “The department may designate in specific cases a hearing examiner who may be a member of its technical staff or a member of the Connecticut Bar engaged for that purpose ... to hold a hearing and make report thereon to the department.”
General Statutes § 16-35 provides in relevant part: “Any company, town, city, borough, corporation or person aggrieved by any order, authorization or decision of the department of public utility control . . . may appeal therefrom in accordance with the provisions of section 4-183.”
General Statutes (Rev. to 1987) § 4-183 (a) provides in relevant part: “A person who has exhausted all administrative remedies available within the agency and who is aggrieved by a final decision ... is entitled to judicial review by way of appeal under this chapter . . . .”
Practice Book § 4147 provides in relevant part: “A reservation shall be taken to the supreme court or to the appellate court from those cases in which an appeal could have been taken directly to the supreme court, or to the appellate court, respectively, had judgment been rendered.”
Practice Book § 4148 provides in relevant part: “Before any question shall be reserved by any court, counsel shall file in that court a stipulation which shall clearly and fully state the question or questions upon which advice is desired.”
The member towns are East Lyme, Griswold, Groton, Ledyard, Mont-ville, New London, North Stonington, Norwich, Sprague, Stonington and Waterford.
General Statutes § 7-273aa (b) provides in relevant part: “Any . . . two or more municipalities may, by concurrent ordinances of their legislative bodies, adopt the provisions of this chapter and . . . create a new . . . regional resource recovery authority.”
General Statutes § 16-243b (a) (1) provides: “ ‘Private power production facility’ means a facility which generates electricity in the state (A) solely through the use of cogeneration technology, provided the average useful thermal energy output of the facility is at least twenty per cent of the total energy output of the facility, (B) solely through the use of renewable energy sources or (C) through both only.”
General Statutes § 16-243a (a) provides: “As used in this section, ‘avoided costs’ means the incremental costs to an electric public service company, municipal electric energy cooperative organized under chapter 101a or municipal electric utility organized under chapter 101, of electric energy or capacity or both which, but for the purchase from a private power producer, as defined in section 16-243b, such company, cooperative or utility would generate itself or purchase from another source.”
General Statutes § 16-243b (a) (3) provides in relevant part: “ ‘Private power producer’ means ... (C) ... a political subdivision of the state or any other person, firm or corporation . . . which generates electricity solely through ownership of one hundred per cent or less of a private power production facility . . . .”
General Statutes § 22a-260 (11) provides: “ ‘Resources recovery facility’ means a facility utilizing processes aimed at reclaiming the material or energy values from solid wastes.”
General Statutes § 16-243e provides: “Any electric company, as defined in section 16-1, purchasing electricity generated by a resources recovery facility, as defined in section 22a-260, owned by or operated by or for the benefit of a municipality or municipalities, shall enter into a contract with the owner of such facility requiring the electric company to purchase such electricity, for a period beginning on the date that the facility begins gener
Because CL&P has agreed to pay for 70 percent of the electrical output at the higher municipal rate, we need not address the preemption issues that CL&P raises on appeal, “Constitutional issues are not considered unless absolutely necessary to the decision of a case . . . . ” State v. DellaCamera, 166 Conn. 557, 560-61, 353 A.2d 750 (1974),