123 Me. 450 | Me. | 1924
This is an action of tort brought under the Federal Employer’s Liability Act, which is admittedly applicable, to recover damages for injuries sustained by the plaintiff in the yard of the Portland Terminal Company. It is before the Law Court on report under a stipulation which will be considered later. The record is voluminous but there is little contradiction on the essential points.
The topographical situation as clearly stated in the brief of the learned counsel for the defendant, was this: The Portland Terminal Company, transfer agent and switching corporation, owning terminal facilities used by both the Boston and Maine and Maine Central Railroad Companies, has in Portland or had at the time this accident occurred, eight or nine switching yards the purpose of which is to take the incoming freight trains from both roads, break them up, reclassify the cars, part for delivery and part for through shipment, make up the new trains and deliver them to each of the connecting roads ready to be started on the way to their destination.
Among others is yard No. 8 where this accident occurred, and which is situated between Commercial Street on the north and Fore River on the south. The tracks in the yard run in a general easterly and westerly direction. Four main line tracks come in from the west, at what might be termed the neck of the yard and then spread out, fan-like toward the east making about forty tracks in all in the extreme easterly portion. We are concerned in this case, however, only with the section at or near the neck comprising the four main line tracks into which all of the switching tracks converge, and the caboose or buggy track, so called, at the extreme north just beyond what is known as main line track No. 2. This buggy track runs alongside a bulkhead about 300 feet long and four and one half feet high, built of railroad sleepers placed on end. This bulkhead was originally constructed for loading or unloading purposes but for many years has not been used except at very rare intervals and then at the western end by the Telephone Company for the loading and unloading of poles.
The buggy track is so called because it is used for the storage of buggies or caboose cars in which the freight train crews keep their personal belongings. Each buggy comes into the yard with its
The accident happened as follows: A little after seven o’clock on the morning of July 15, 1919, the plaintiff, who was a section hand in yard 8, was ordered by his foreman to get some tie plates for use in laying rails. These were kept in various places, sometimes around the workmen’s shanty near the southern or river side of the yard, sometimes near the coal shed, a little easterly, and sometimes on the above described bulkhead at the north. The plaintiff found no suitable ones at the shanty, was told there were none at the coal shed by two workmen coming from that direction, and therefore he started northerly across the intervening tracks for the bulkhead. When he reached outward main line number two, .just south of the buggy track, he saw a shifting engine with seventeen freight cars on the side-track nearest Commercial Street moving slowly westerly in his direction. The engine was then some distance easterly of the switch connecting with outward main line number two, and also easterly of the switch connecting with the buggy track. The engine was backing, tender first and was pulling the train.' The plaintiff, assuming that the train would take main line number two, as always in his experience of over eight years such trains had done before, kept his course, crossed main line number two and the buggy track, stood between that track and the bulkhead, a distance of about two and a hah feet,
At the conclusion of the testimony instead of submitting the case to the jury it was reported to this court with the stipulation that “if the evidence would support a verdict for the plaintiff, the Law Court is to assess damages for the plaintiff; If the evidence would not sustain such a verdict judgment is to be rendered for the defendant.”
In other words the Law Court is to examine and pass upon the evidence as if a verdict had been actually found by the jury in favor of the plaintiff and the case were here on a general motion by the defendant to set it aside as against the evidence, the only difference being that no damages have been assessed.
Is then the assumed verdict for the plaintiff manifestly wrong? That is the clear cut issue.
I. Defendant’s Negligence.
The writ contains ten counts, five at common law and five under the Federal Employer's Liability Act. The former are abandoned. The claims under the latter, as supported by the evidence, may be condensed as follows:
Under the long established system of operation in the defendant’s yard, recognized and fully appreciated both by the employer and the employees, the buggy track on or at the side of which the accident happened had been exclusively devoted by the Terminal Company to storage purposes for a. long period of years, at least during all the eight years and a little more during which the plaintiff had worked in that yard. While that track was connected with other tracks by a switch both at its easterly and westerly end, yet the one at the westerly end had been used almost exclusively. The buggies were set on to the storage track from that end or were “kicked” on, to use the language of the train men. And they were almost always removed at the same westerly end. Occasionally a buggy might be
Moreover, section men sometimes temporarily stored their handcars or lorries on this buggy track, when working on the main line in that vicinity. At times the switch at' the easterly end had been spiked so that neither entrance nor exit could be made at that point. The other tracks in the yard were regularly inspected but not this buggy track. Its rails had become rusty from disuse so that it looked to be as it was a storage track pure and simple. All this was common knowledge in the yard.
Only once during the eight years covering the plaintiff’s term of employment had a train been moved over the buggy track. That happened five year's or more before the accident and on that occasion the Company, appreciating the danger arising out of the changed condition and apparently also its own responsibility, gave express warning to the yard employees in advance, in order that they might protect themselves. The foreman of that section notified the section men “to be careful about the buggy track as they were going to use it.” This fact is uncontradicted, is proven by testimony both from plaintiff and defendant and is most important and significant.
Its use on this particular morning was occasioned by an emergency. An accident had happened the night before on some portion of the main line toward the west preventing the passage of trains over main line number two and for that reason the defendant brought the buggy line into requisition. No notice however, of this proposed change was given. No warning was communicated to the section men, regardless of the legal duty resting upon an employer to notify employees when without their knowledge a safe place in which to work is suddenly changed into an unsafe and perilous one.
Not only was the unwarned change itself accompanied by danger to the workmen, but no precautions were taken to protect them from the moving train after it had started. The fireman was coaling the locomotive at the time and under the rules of the road and under the dictates of ordinary precaution additional responsibility was then thrown upon the engineer to look out for trouble in the direction in which the cars were moving. But the cab was concealed from the track by the tender and the engineer was looldng toward the rear of the train talcing signals from the head brakeman who was on the
It may be true that the automatic bell was ringing on the engine, but that was usual when the engine was taking its customary course, and gave no indication or warning that it was to take the other track. In short the Company was pulling its train into this storage track without the slightest warning or attempt at warning to employees who in the course of their duties might have occasion, as did the plaintiff, to go upon and about it, a thing it had never done before. The whole situation constituted a trap, not designedly of course, but none the less effectively set to catch not strangers unacquainted with the ordinary situation, but to catch employees of long standing whose very knowledge and experience made them the innocent victims of the defendant’s negligence.
Under all these circumstances, we have no hesitation in declaring that a finding of the jury that the negligence of the defendant had been proven should not be disturbed. Granting that the defendant had the legal right to use its own property for its own legitimate purposes, yet the use of one’s property in disregard of the legal rights of others liable to be affected or injured thereby is the very gist of negligence.
The defendant seeks to avoid legal liability by invoking the doctrine laid down by the U. S. Supreme Court in the leading case of Aerfetz v. Humphreys, 145 U. S., 418, where it is held that persons having direct charge of a switching engine and cars upon the tracks in a railroad yard “have a right to act upon the belief that the various employees in the yard familiar with the continuously recurring railroad movement of the cars would take reasonable precaution against their approach,” that the railroad company under those circumstances “is not compelled to send some one in front of the ears for the mere sake of giving notice to employees who had all the time knowledge of what was to be expected.” This doctrine is followed in many other cases and is undoubtedly sound. The very nature of the railroad business demands such a doctrine. It is but a declaration that the employer
• But the distinction between the facts in that line of cases and in the present is sharp and clear. It is that between the peril connected with passage across an actively used traffic track and a practically dead storage track. Had the plaintiff been injured while crossing any of the tracks before reaching the storage track this doctrine might be effectively invoked. But when he reached the storage track, the danger of passing trains had ceased, and another situation arose. What was to be naturally expected there, applying the same legal rule, was the danger from cabooses kicked on from the west, and nothing else.- That he was expected to look out for and he says that he did. He looked toward the west where danger might lie. He did not look toward the east for a peril that had never been created before. Nor was he bound to do so. The duty then was shifted to the defendant to see that he and his co-employees were seasonably warned of the change.
No step was taken toward that end and the negligence of the defendant as assumedly found was not a clearly wrong finding.
II. Assumption of Risk.
The defendant further urges that the plaintiff assumed the risk and therefore cannot recover. This defense is a bar to recovery under the Federal Employer’s Liability Act if the facts warrant its application. But here they do not. The assumption of risk on the part of an employee necessarily implies prior knowledge of the conditions from which the accident happens. Clement v. Maine Central R. R. Co., 117 Maine, 45. That condition here is the passage of a train over the storage track. Of this the plaintiff was admittedly in utter ignorance. He did not know of the risk, had no reason to know it, and therefore he cannot be held to have assumed it.
III. Damages.
The plaintiff was a man fifty-three years of age and in good health. His injuries were grievous and permanent. His right hip and leg
IV. Contributory Negligence.
Under the Federal Employer’s Liability Act, contributory negligence on the part of the plaintiff is not a ground of absolute defense, but may serve to diminish the amount of damages to which the plaintiff might otherwise be entitled.
The defendant invokes such diminution here in case actionable negligence is attributed to the Company.
But we are unable to discover want of due care on the plaintiff’s part. He acted as the ordinarily prudent man should have acted under the same circumstances. The same element that enters so largely into the negligence of the defendant favors the plaintiff on the question of his own due care, namely, the sudden and unexpected and unwarned use of a hitherto unused track. When inquired of in regard to his crossing the various tracks from south to north, he said: “I looked up and down the tracks every time I crossed every one, . . . . Looked up and down the tracks for fear of any trouble coming.” As he neared track number two he saw the shifter and cars backing up, tender first, and he warned a fellow workman who was with him to look out for it, thus showing his own alertness. The train was then east of the easterly switch. It was a common occurrence for such a train to be on that track leading into outward main track number two at that time. It was in accordance with the universal method of work in that yard for the train to pass on to that track and he naturally expected this one to do the same. He had a right to so expect. Only on one occasion had the Company used the
To hold the plaintiff guilty of contributory negligence under the facts of this case would be contrary to what we conceive to be good law and good sense. Therefore the award is not to be diminished by any contributing fault of the plaintiff and the entry should be,
Judgment for plaintiff for $10,000.