219 N.W. 704 | Mich. | 1928
The plaintiffs are the owners of a farm *172 through which a tile drain was constructed by the defendant while serving as drain commissioner of Van Buren county. The plaintiffs claim this drain was negligently constructed by the defendant in that the portion immediately above plaintiffs' farm had a much greater fall than that crossing their land; that there were sharp angles in the line of this drain; that the drain was not laid at a proper depth; and that a sufficient outlet was not provided. The plaintiffs assert that as a result of these defects the water has broken out of this tile drain with every freshet and has caused great damage to plaintiffs' land and crops. They claim they have been thus subjected to damage because of the defendant's failure in his official capacity to use reasonable care, caution, and skill in having this drain properly laid out and properly constructed. The defendant denies the charge thus made against him. He urges as a defense that he was acting in his official capacity; that his actions and doings relative to this drain were regular and in compliance with the drain laws; that the survey for the drain was made by a competent surveyor and engineer who prepared the plans and details of said drain. The defendant disavows any and all responsibility and liability for the plans, specifications, or method of constructing the drain, or for any mistake of judgment on the part of himself or the engineer. It is also contended by the defendant that the plaintiffs caused an open tile to be placed in this drain on their land and that this was the cause of much of their damage. The plaintiffs recovered $1,200 damages and the defendant reviews by writ of error.
The various assignments of error are grouped and discussed in the appellant's brief under the following heads:
(1) Error in denying the defendant's motion to dismiss because the declaration does not state a cause of action. *173
(2) In overruling defendant's motion for directed verdict. (3) In refusing to grant defendant's requests to charge.
(4) In admitting testimony as to future damages.
(5) In overruling defendant's motion for judgment nonobstante veredicto and for a new trial.
(6) In instructing the jury.
The declaration plainly sets forth the particular duties of the defendant incident to the construction of this drain, his failure to perform them, and the resultant damage suffered by the plaintiff. A thorough consideration of the record satisfies us that the trial judge was correct in his judgment that the case presented disputed issues of fact for the jury's determination.
Testimony which seems quite convincing was submitted to the jury tending to show that the plan for laying out and constructing the drain was not that of the engineer, but, instead, it was one insisted upon by the defendant. The engineer testified that his original plans and specifications for this drain were adequate, but they were rejected by the drain commissioner; and that the subsequent plans which were required by the defendant in an effort to lessen the cost did not provide for a properly constructed drain. The record was sufficient for the plaintiffs to go to the jury on their theory that they sustained damage because the defendant failed to exercise the degree of care and skill incident to the discharge of his official duties in constructing this drain which is required by law. It is well settled that a drain commissioner is not liable for a mere mistake in judgment, or for the improper exercise of discretion in determining the method of drainage (19 C. J. p. 710); but he is bound to exercise ordinary care and judgment in the discharge of his official duties, and if he needlessly and recklessly injures the property of another he may be *174
held to be responsible for any resultant damages.Chapel v. Smith,
The case is affirmed, with costs to the appellees.
FEAD, C.J., and FELLOWS, WIEST, CLARK, McDONALD, POTTER, and SHARPE, JJ., concurred. *175