251 F. 181 | 8th Cir. | 1918
During the navigation season of 1914, the Northern Lakes Steamship Company owned and operated - the steamer Champlain. During the same season the Clarkson Coal & Dock Company owned and operated a eoa.1 dock with unloading rigs thereon at Duluth, Minn. The dock was known as the Clarkson dock.
The Clarkson dock is situated on the harbor front and extends out into the harbor from the shore 800, or 1,000 feet. It' is about 500 feet wide. On the northerly side there is a dredged slip of about 200 feet in width. Doaded vessels went into this slip and made fast to the dock for the purpose of discharging their cargoes. Running along the edge of the dock lengthwise and about 5 feet from the slip was a single steel railroad rail mounted on and spiked to timbers. About 250 feet from the slip was another single steel rail, parallel to the rail next to the slip. On these two steel rails was erected a bridge or trestle holding the unloading device. At the end of the trestle wTere two steel legs. These legs were mounted on trucks, each truck having four flanged wheels. These trucks at each end of the trestle rested on the steel rails. -Upon the legs thus mounted was constructed the steel trestle, extending over and across the dock for a distance of about 250-feet and at a height of about 50-feet. The entire structure could be rolled along the dock on the steel rails, and could be placed at any point where it was desired to unload a cargo. This structure occupied the easterly half of the dock. A similar structure, mounted and operated in the'same way, occupied the westerly half.
The two structures were so built that they could be placed end to end and attached to each other, thus forming a trestle or bridge extending over the entire width of the dock. They were thus fastened together at the time of the accident shown in the testimony in this record. At the slip end of the bridge or trestle was an adjustable steel boom that could be extended out over the vessel. From the end of this boom steel buckets were lowered into the hold of the vessel being unloaded, and when filled these buckets were hoisted by steel lines by machinery on the bridge or trestle, and dumped into cars, which were run out over the bridge or trestle and dumped on the dock. This movable bridge or trestle was very heavy, and was held in place by adjustable clamps applied to the^ steel rail on which the legs supporting the trestle rested. The jawTs of the clamps were designed to drop over and around .the ball of the rail, and after being put in place were tightened against the web of the rail by turning a threaded screw.
On the afternoon of April 25, 1914, the outer trestle was shifted to a point near the outer end of the dock and connected end to end with the inner trestle, forming one continuous bridge''as already described. On the following day the steamer Champlain arrived at the port of Duluth with a cargo of coal consigned to the Clarkson dock. The vessel did not immediately go into the slip, for the reason that the unloading boom of the trestle extended out over the slip. Dater-in the day the vessel shifted over alongside the Clarkson dock. On the morning of the next day the work of discharging the cargo from the'hold of the vessel began, and continued during the day and the-following night. A wind sprang up from the northeast during the early part of the night, and by 4 or 5 o’clock the next morning, the 28th,'. it had attained a velocity of 40 to 50 miles an hour or greater. The-work of unloading was suspended about half past 5 o’clock in the-
The Clarkson Coal & Dock Company appeals from the decree adjudging damages against it, and the Northern Lakes Steamship Company appeals because, as it contends, the amount of damages found be the court is not as large as it should be under the testimony. The six hssignments of error of the Clarkson Coal & Dock Company can be reduced to one. That one is that the facts fail to show that it was negligent.
The testimony fairly shows: (1) That the Champlain came into the slip and moored at the dock at the invitation of the Clarksoig Coai & Dock Company. (2) That when screwed up the jaws of the clamps did not press tightly against the web of the rail. (3) That an appreciable space was left between the jaws of the clamp and the web of the rail.
The Clarkson Coal & Dock Company contends: (1) That it procured from a reliable manufacturer and used under the direction of a competent engineer the best device obtainable for holding the bridge in place on the rails. (2) That the bridge fell as the result of an unavoidable accident, or an act of God.
Mr. C. W. Bryson, the manager of the Northern Lakes Steamship Compafiy, testified'that the Champlain during one trip of the season, 1914, earned $324 per day, and that upon another trip during the same season the same vessel earned $326 per day. Mr. Robert H. Kidd, a marine surveyor and a ship builder, testified that the earning power of the Champlain during the season mentioned was $400 to $450 per day, and that the average daily expense of that vessel would be $225. According to Mr. Kidd’s figures the net earnings of the Champlain would have been $175 to $225 per day. The court allowed a sum for demurrage or net earnings in excess of the amount testified to by Mr. Kidd and less than the amount testified to by Mr. Bryson. We cannot say that the amount found by the .court .was not correct, or that the testimony warrants a larger amount.
The decrees in both cases will be affirmed, with costs to the Northern Lakes Steamship Company in No. 4967, and to the Clarkson Coal & Dock Company in No. 4968.