No. 681 | Wash. | May 24, 1893
The opinion of the court was delivered by
On the 14th day of March, 1882, the city of Seattle passed an ordinance purporting to grant a right-of-way to the Oregon & Transcontinental Railroad Company and the Columbia & Puget Sound Kailroad Company, to lay a single or double track along and upon certain streets therein described. The first section, describing the route, was amended October 29, 1883. The second section, omitting the seventh subdivision, which provided for the joint irse of such tracks by any other railroad company constructing a railroad to Seattle, and provided a method of determining compensation therefor, is as follows:
“That said Oregon & Transcontinental Railroad Company and the Columbia & Puget Sound Railroad Company be and are authorized to locate, lay down, aiid perpetually maintain and operate a single or double track railroad upon the track and place described in section one of this ordinance, upon the following terms, to wit:
‘ First: That the said companies, their successors and assigns, are to allow each wharf owner a side track connecting the said road with the warehouses of each wharf owner, the side track to be constructed and kept in repair by the wharf owners or occupants along said water front.
*381 “Second: That the rights so granted shall not in any way he construed as depriving the occupants of lots along-said water front of any riparian rights or any rights, except so far as such way extends. The said owners and occupants reserve the right to wharf out in front of said railroad, and it is agreed that they shall have that right without objection by, or on the part of, said railroad companies, their successors or assigns.
'■'■Third: The said road to be constructed by the railroad companies so as to be on a common level with the wharves along said water front.
'■‘■Fourth: That said companies, their successors and assigns, where said track crosses a wharf now or hereafter to be constructed, shall plank and keep in repair at least fifteen feet of said way, and, whenever a double track is constructed over said way, then the company or companies constructing or operating the same shall plank and keep in repair the entire way over said wharves, and the same may be used by the wharf owners at all times except when trains are passing over it.
‘■'■Fifth: That said railroad companies, their successors and assigns, shall not allow their cars to stand upon the track on any wharf along said water front without the consent of the owner of such wharf.
"■Sixth: That said Oregon & Transcontinental Kailroad Company is to construct a standard gauge railroad from Seattle to a point on the Northern Pacific Railroad Company’s constructed line, so as to connect the city of Seattle with Eastern Washington, either by way of Portland, Oregon, or the Cascade mountains, within two (2) years; and, on failure so to do, this right herein granted shall be void and of no effect: Provided, That, if any other road shall construct a standard gauge road connecting Seattle with Eastern Washington before the roads above mentioned, then and in such case the rights herein to lay, maintain and operate such tracks be, and the same are hereby, granted to the road that shall so construct such line.”
"Eighth: That said companies, their successors or assigns, shall not run trains over said tracks along said water front at a higher rate of speed than six miles an hour, and the city shall retain the same control over the streets and*382 alleys wherein the said tracks are laid [as] on and across streets and alleys upon the land. ’ ’
In the latter part of 1883, the Puget Sound Shore Railroad Company, which was the predecessor of the Northern Pacific & Puget Sound Shore Railroad Company,, and which claimed to have succeeded to the rights of the Oregon & Transcontinental Railroad Company, aforesaid, constructed a railroad of standard gauge from Seattle to Stuck J unction, a point on the Northern Pacific Railroad Company’s line, thereby connecting the city of Seattle with Eastern Washington, then via Portland, Oregon, with a continuous line of railroad. This road was constructed within the time specified. It started from a point within the southern limits of said city of Seattle, but did not cover any part of the right-of-way described in said ordinance. This road was operated for about one month after completion, but thenceforth for a year and a half no trains were run thereover. A three-rail track (the Columbia & Puget Sound Railroad being a narrow gauge road) was also constructed by the Columbia & Puget Sound Railroad Company and the Puget Sound Shore Railroad Company along the right-of-way described in said ordinance, which is now in controversy, but a gap of one rail’s length was left at the point where the standard gauge track was designed to connect with the line constructed as aforesaid. After the expiration of this period of one year and a half, during which the road aforesaid was not operated, the connection was made, and a continuous line was thenceforth operated continuously for several years, until June 6, 1889, when a great fire destroyed the railroad on said right-of-way, together with a vast amount of other property in the vicinity. The railroad companies at once set about restoring the wharves and warehouses, etc., and the railroad tracks on said right-of-way. When they reached Columbia street, building north, they found that the city had raised the grade of
The right-of-way in controversy is located upon tide and shore lands, a part of it being within the meander line, and a part without. The first five propositions contended for by appellant relate to the right of the city to maintain and control a public street on the shore land prior to the erection of the Territory of Washington into a state, to extend the streets in question thereon, and to the enactment of the ordinance establishing the higher grade of Columbia street after the destruction of the railroad at such point by fire as aforesaid. For the purposes of this case, these propositions will be taken as established. The remaining points contended for by appellant are as follows:
“6. Ordinance No. 262 (as amended by ordinance No. 484), purporting to grant a franchise to build and operate a railroad, is void, by reason of the non-existence of the Oregon & Transcontinental Railroad Company, one of the grantees named — First, in respect to the defendant Columbia & Puget Sound Railroad Company, the other grantee;*384 and also, second, in respect to the defendant Puget Sound Shore Railroad Company, which joined with the last-named grantee in building the road; and, third, in respect to said defendants jointly; and, fourth, said franchise was also void because in terms perpetual and irrevocable.
“7. Said ordinance is void by reason of non-compliance with the sixth condition therein specified, as to the time within which the road should be constructed to a connection with Eastern Washington, and by reason of failure continuously to operate the road when constructed.
“8. Said ordinance was of no force in respect to the shore land, comprising the place to which the injunction sought relates, because the city, at the date of the ordinance, had no power to dispose of or incumber the shore; and the city is not estopped, by its subsequently acquired title to the locus in quo as a street, from denying its former power to make the grant.
“9. Assuming, however, that the defendants have the franchise claimed under the ordinance, the city’s right of control over the street at the point of crossing was paramount, and could be exercised, when the injunction was sought, as the city might see fit, though the result might be the impairment or even destruction of the defendants’ franchise; the sole remedy of the defendants, if any, being an action for damages.
“10. Even if the city’s right of control over the street could not be exercised to the destruction of the defendants’ franchise, its exercise in this case would not work a destruction of the franchise, apart from the change of grade of other streets crossing the railroad; and such change of other streets was not properly proved, and, if proved, was irrelevant under the pleadings. ’ ’
The order in which the points have been stated will not be followed in the discussion, but the proposition in relation to the want of authority in the city to grant the right-of-way in question, stated in its eighth ground, will be first noticed. The right to authorize railroad companies to lay their tracks upon the streets and public places in the city generally was expressly conferred by law. Section 11 of
“The city of Seattle has power to provide for the survey of the blocks and streets of the city, and for making and establishing the boundary lines of such blocks and streets, and to establish the grades of all streets within the city, and to lay off, widen, straighten, narrow, change, extend, vacate and establish streets, highways, alleys and all public grounds, and to provide for the condemnation of such real estate as may be necessary for such purposes, and to levy and collect assessments upon all property benefited by any change or improvement authorized by this section, sufficient to make compensation for all property condemned or damaged; and to authorize or forbid the location and laying down of tracks for railways and street railways on any and all streets and alleys and public places within the city: Provided, That no street or alley shall be-extended or vacated except by a vote of six members of the council in favor thereof: And provided further, That any person or corporation laying down such railway shall be liable to the owners of property abutting upon such streets, alley or alleys, for all damages or injury caused thereby, to be ascertained on the petition of the property owners, in the manner provided by chapter 188, §§2473 to 2576, inclusive, of the Code of Washington of 1881; and the judgment and decree thereon shall be that the company or persons shall pay such damages, and, on such payment, shall be entitled to such right-of-way, and, if no petition for such compensation shall be filed within two years after the track is so laid, such claim shall be barred. 5 ’
There are several sections contained in the Code of 1881 also relating to this subject matter, which are as follows:
“Sec. 2458. When it shall be necessary or convenient in the location of any road herein mentioned to appropriate any part of any public road, street or alley or public grounds, the county court of the county wherein such road, street, alley or public grounds may be, unless the same be within the corporate limits of a municipal corporation, is*386 authorized to agree with the corporation constructing the road, upon the extent, terms and conditions upon which the same may be appropriated or used and occupied by such corporation, and if such parties shall be unable to agree thereon, such corporation may appropriate so much thereof as may be necessary and convenient, in the location and construction of said road.
“Sec. 2459. Whenever a private corporation is authorized to appropriate any public highway or grounds, as mentioned in the last section, if the same be within the limits of any town, whether incorporated or not, such corporation shall locate their road upon such particular road, street or alley, or public grounds, within such town, as the local authorities mentioned in the last section, and having charge thereof,_shall designate; but if such local authorities shall fail or refuse to make such designation within a reasonable time, when requested, such corporation may make such appropriation without reference thereto.”
These are now §§ 1574 and 1575, vol. 1, of the present code.
While it is admitted that the city had the right generally to allow railroad companies to lay tracks upon its streets, it is contended that it had no such right where such streets were located upon tide lands, because the title thereto was in the territory in trust for the future state, and, therefore, that the city could not burden the same with any easement. It is contended, however, that the city had the right to occupy such lands for street purposes, and, although we have taken this contention as established, it may be well to notice some of the provisions of the city charter relating thereto. Section 11, as we have seen, confers power to lay off, establish and extend streets, etc., and establish the grades thereof. Section 26 confers power to build, construct and regulate wharves, piers and landing places at the foot of any street terminating at the shore of Elliott bay, and to regulate and prescribe the limits of the extension of wharves into the waters of any harbors within the
We are also of the opinion that the city is not in a position to urge that the ordinance is void by reason of a noncompliance with the sixth condition as to the time within which the railroad should be constructed, nor of the failure to continuously operate the road when constructed. The essential object of the ordinance was to secure continuous railway connection with the eastern part of the state, and for that purpose the ordinance, by a proviso in said condition, purported to confer or convey the right to lay a track upon the right-of-way in question to any company which should first construct a standard gauge railroad affording such connection. There was no intention to limit the privileges authorized to the particular corporations named, and while it is admitted that the road was not constructed from the point in controversy within the time specified, and that for a year and a half from about a month after its completion it was not operated, and thus, as appellant contends, the spirit of the ordinance was violated, yet, notwithstanding this, the ordinance was not repealed, nor was any step taken during said time to compel the railroad companies to remove their tracks from the streets in question, but they were allowed to remain there, and finally the line was put in operation, and was operated continuously for several years prior to the institution of this suit. The respondents’ rights in the premises were in no wise questioned during said times, and, conceding that the city had the right to impose the time limitation condition, we are of the opinion that it is now, and was at the time of the institution of this suit, estopped from availing itself of the same under the circumstances.
It seems to us that the contention of the respondents is well founded, that the ordinance in question, while it re
As to the sixth proposition: The point that there was no such corporation in existence as the Oregon & Transcontinental Railroad Company seems to us immaterial. It does appear that there was a corporation known as the “Oregon Transcontinental Company,” and we think it fairly appears from the proof that this was the corporation that was intended to be designated, instead of the ‘ ‘ Oregon & Transcontinental Railroad Company, ’ ’ which had no existence, and that it-was, in effect, simply a misnomer; but, under the view we have taken of the points heretofore discussed, this matter becomes unimportant.
The point in relation to the franchise being void, because in terms perpetual and irrevocable, will be further noticed. What has been said disposes of the sixth, seventh and eighth propositions otherwise.
Many of appellant’s statements advanced in support of its ninth ground are unquestionably sound, but they fail to sustain the position taken. A city’s power to improve and graduate its streets is undoubtedly a continuant power, not exhausted by its first exercise, and inalienable by the coi'porate authorities, and such authorities are the ones to judge of the expediency or necessity of its exercise. This is well sustained by the cases cited. But the next statement, that under this power the city’s right to establish and execute a new and higher grade of Columbia street at the place in dispute follows as a matter of course, must be
“The provisions in these ordinances, requiring the tracks to conform to grade, and to be laid under the direction of the street commissioner, . . . are of the character of regulations which may be adopted, and, if reasonable, are valid. Such regulations do not appreciably interfere with the exercise of its franchise by a corporation having a franchise to use the public streets for its- business; . and the legislature is presumed to have intended, when it authorized the use of the public streets for such purposes, that its grantee should hold its privileges subject to such regulations as are reasonably necessary for the common use of the streets, for the purposes of a street railway, and for ordinary travel. ’ ’
Nor can we agree with the statement that there was in this case no taking of property by the alteration of such grades because, at the particular time the ordinances were passed, the railroad tracks had been destroyed by fire at the point in question, and, for that reason, there was no property there in existence to take. The argument might apply with some force in case of the destruction of a structure which could be rebuilt as well to conform to one grade as another, and where there would only be a damaging, instead of a deprivation, of the right. But the railroad tracks at this point must be rebuilt with reference to the established grade of the railroads of which they were a part. The part which merely crossed the street could not be segregated and looked at independently, for it was of no value, excepting as a part of the system, and could only be reconstructed practically upon the same grade as before; and this, as we have seen, was rendered impossible by the changes in the grades of the streets made as aforesaid. Although the railway tracks across this street were destroyed by fire, the property of the companies still remained. The property was the franchise — the right to use the street for
The substance of the tenth point has been previously disposed of in the view taken that the acts of the city, if sustained, would work a destruction of the franchise. Minor points as to whether the proof ivas irrelevant under the pleadings are of no particular importance at this time. Where a full and fair trial has been had upon the merits, and this is apparent, little attention will be paid in an equity cause to technical points raised over the pleadings.
The judgment of the lower court is affirmed.
Dunbar, C. J., and Hoyt, Stiles and Anders, JJ., concur.