OPINION ON MOTION FOR REHEARING
Our opinion dated March 19, 1990, is hereby withdrawn, and this opinion on the City of Princeton’s motion for rehearing is substituted in its place.
The City of Princeton (the City) appeals a jury verdict rendered in favor of Tonnie Abbott and Mildred Abbott (the Abbotts) involving the responsibility for water damage incurred by the Abbotts. This is the second time this Court has had the opportunity to hear this case.
See Abbott v. City of Princeton, Texas,
The record reflects that, in 1969, the Abbotts purchased a two-acre tract of land in Princeton, Texas. Soon after the purchase, a roller skating rink was constructed on the property. Immediately north of the Abbotts’ property exists an easement owned by the City, originally granted to the City to use as an extension for a street. Located on this easement is an agricultural terrace/embankment. Immediately north of the City’s easement existed terraced farmland owned by the Princeton Independent School District. In 1971, the school decided to level the agricultural terraces, which placed the land in its natural state, in conjunction with the construction of a football stadium and adjoining parking lot. After the leveling of the terraces, upon heavy rainfall, the rainwater would run from north to south, collect at the City’s embankment, and then overflow the embankment, damaging the Abbotts’ roller rink. Before the terraces were leveled, they op *163 erated as a series of dams which stopped and diffused the flow of rainwater.
Because points of error one through three address legal, and in the alternative, factual sufficiency evidentiary points, they will be discussed together. In addressing a legal sufficiency or no evidence challenge, we must consider only the evidence and inferences, viewed in their most favorable light, which support the jury’s finding, and we must disregard all evidence and inferences to the contrary.
Stafford v. Stafford,
In addressing a factual sufficiency of the evidence challenge upon a jury verdict, an appellate court must consider and weigh
all
of the evidence, not just that evidence which supports the verdict as is done in the face of a no evidence challenge.
See Cain v. Bain,
The City maintains that the trial court erred in denying the City’s motions for judgment n.o.v. and new trial because the evidence adduced at trial is legally, and in the alternative, factually insufficient to support the jury’s findings that: (1) the natural flow of surface water had been diverted or impounded by the City in a manner to damage the Abbotts’ property; (2) thirty thousand dollars should be awarded to the Abbotts for the reasonable expenses for necessary work, labor, and materials to prevent or avoid future water damage; and (3) the diversion or impoundment of the natural flow of surface water constituted a nuisance to the Abbotts. After a thorough review of the record, we determine that the evidence is sufficient, both legally and factually, to support the jury’s findings.
Surface water has been defined as “[t]hat which is diffused over the ground from falling rains or melting snows, and continues to be such until it reaches some bed or channel in which water is accustomed to flow.”
Stoner v. City of Dallas,
In its second point of error, the City complains of the submission of a question to the jury concerning the amount of money necessary to compensate the Abbotts for “reasonable expenses for necessary work, labor and materials to prevent or avoid future water damage.” The jury answered this question with an amount of thirty thousand dollars. The City frames its point of error by stating that the evidence is legally, and in the alternative factually, insufficient to justify the submission of the question. The City’s legal insufficiency point is not that there is no evidence to support the submission, but that, as a matter of law, future damages are not recoverable for temporary injuries to land.
We will first address the legal sufficiency point and then address the factual sufficiency point. We agree with the City that the injury to the Abbotts’ property is one that appears to be of a temporary nature brought about by occasional heavy rainfall.
See, e.g., Bayouth v. Lion Oil Co.,
Russell Betts, the City’s consulting engineer, testified upon cross-examination,
without objection,
that it would cost between thirty and fifty thousand dollars to lay a series of pipes along the western boundary of the Abbotts’ property, which would alleviate the flooding problem. The jury returned an amount which was the lowest figure in Betts’s range of costs for the necessary work. This was a
certain
amount of money, which, if paid at the
*165
time of trial,
would adequately compensate the Abbotts for a future, but certain and continuing, event. Moreover, the case relied upon by the City for the proposition that this type of damage is not recoverable as a matter of law can just as easily be viewed as supporting the submission and award of such damages.
See Rosenthal v. Taylor, B. & H. Ry. Co.,
In
Rosenthal,
a property owner, who had acted with other property owners in helping a railroad company acquire an easement for the operation of its trains, brought a nuisance cause of action against the railroad for foul-smelling, offensive standing water created by an embankment built to lay train tracks.
See Rosenthal,
The Rosenthal case is also instructive for the following rule:
[T]he controlling rule in actions for injuries resulting from similar nuisances would seem to be to adopt in each case that measure of damages which is calculated to ascertain in the most certain and satisfactory manner the compensation to which the plaintiff is entitled. When the injury is liable to occur only at long intervals, or when the nuisance is likely to be removed by any agency, the damages which have occurred only up to the time of the action will be allowed; but if the nuisance is permanent, and the injury constantly and regularly recurs, then the whole damage may be recovered at once.
Id.
(emphasis added);
Meat Producers, Inc. v. McFarland,
Additionally, the statute upon which the Abbotts’ cause of action was based also supports the award.
See
Tex. WateR Code Ann. § 11.086(a) (Vernon 1988). As mentioned previously, the statute provides in pertinent part, “[N]o person may ... permit a diversion or impounding [of the natural flow of surface waters] by him to
continue,
in a manner that damages the property of another_” TexWateR Code Ann. § 11.086(a) (Vernon 1988) (emphasis
*166
added). By allowing the City to maintain the embankment in a manner known to impound the natural flow of surface water which damages the Abbotts, we would be condoning a continuing violation of the statute. Although violation of the statute would occur only upon occasional heavy rainfalls, the condition which effectuates this impounding,
i.e.,
the embankment, is a continuing hazard. In light of the aforementioned case law cited by the City which we either distinguish or use to support the jury’s answer, the rule stated in
Rosenthal
as well as a clear reading of the applicable water law statute, we cannot condone such a result. Accordingly, we hold that the damages awarded to the Abbotts for expenses to prevent or avoid future water damage are recoverable as a matter of law. The City also argued that the evidence was factually insufficient to support the award. We determine that based upon the testimony of Russell Betts, the City’s engineer, the verdict was not so contrary to the overwhelming weight of the evidence as to be clearly wrong and unjust.
See Cain,
The City’s third point of error contends that the evidence is legally, and in the alternative, factually insufficient to support the jury’s finding that the impoundment of water by the City constituted a nuisance. The City contends, in its brief, that the Abbotts failed to prove that the City’s conduct in maintaining the embankment and “horns” was unreasonable.
See Neyland v. Schneider,
A private nuisance, as distinguished from a public nuisance, has been defined as a nontrespassory invasion of another’s interest in the private use or enjoyment of land.
Bily v. Omni Equities, Inc.,
The next step in the analysis is to determine whether a jury could find that the intentional act of the City in allowing the flooding to continue was unreasonable. The record reflects that the City tried to work with and accommodate the Abbotts by placing drainage pipes or corrective “horns” in and around the embankment. However, this action exacerbated, rather than alleviated, the flooding problem. The record reflects that the City was notified several times of the flooding problem and this matter was the subject of several city council meetings. Based upon this record, we hold that in examining only the evidence favorable to the jury’s verdict as well as all of the evidence, both favorable and unfavorable, a jury could find that the City’s conduct in impounding the natural flow of surface water was unreasonable and created a nuisance.
See Stafford,
*167
In points of error numbers four and five, the City contends that the trial court erred in overruling its objections to submitted jury questions numbers one and five concerning impoundment of surface water and damages, respectively. Specifically, the City argues that the pleadings of the Abbotts fail to allege that the embankment caused the impounding of surface water and that they fail to support an award for future damages, in contravention of Rule 278 of the Texas Rules of Civil Procedure. Tex.R.Civ.P. 278. The portion of that rule relied upon by the City provides in part: “[T]he court shall submit the questions, instructions and definitions in the form provided by Rule 277, which are raised by the written pleadings and the evidence.” Tex. R.Civ.P. 278. Although the Abbotts’ petition did not explicitly state that the embankment caused the flooding, sufficient facts were pleaded to give the City notice that the Abbotts intended to rely upon both the embankment and the corrective drainage pipes as causes for the impoundment of the surface water. Moreover, the law favors liberal construction of pleadings to afford substantial justice where no special exceptions have been filed.
See, e.g., Roark v. Allen,
Regarding the award of thirty thousand dollars for expenses necessary to prevent or avoid future water damage, the City contends that the Abbotts’ pleadings were insufficient to support the award. A review of the record reveals that the Ab-botts filed a postverdict trial amendment on August 12,1988, to amend their petition to plead for thirty thousand dollars as the cost to install pipes along the western boundary of their property. On August 22, 1988, the City filed its response to the Abbotts’ trial amendment. The judgment, signed January 17, 1989, implicitly granted the trial amendment by awarding the Ab-botts the thirty thousand dollars as requested. This procedure is specifically authorized by rule 66 of the Texas Rules of Civil Procedure. Tex.R.Civ.P. 66. Even if the trial court did not recognize the post-verdict trial amendment, the issue of damages was tried by consent because the testimony of Russell Betts, upon which the award was undoubtedly based, came into evidence without objection. Tex.R.Civ.P. 67. Whether properly amended in the post-verdict trial amendment or tried by consent, we hold that the Abbotts’ pleadings sufficiently raised the issue of damages and, consequently, the overruling of the City’s objection as to this question was proper. Point of error number five is overruled.
In points of error numbers six through nine, the City complains of the trial court’s failure to submit certain requested questions and instructions. The requested questions and instructions concern: the Ab-botts’ negligence, failure to mitigate damages, comparative causation and responsibility, comparative causation and responsibility of other sources of the Abbott’s damages, nuisance, and the City’s duty relating to drainage improvements and storm drainage systems. In order to warrant submission to the jury, the issues must be raised by both the pleadings and the
evidence.
Tex.R.Civ.P. 278. Further, an abuse of discretion standard is applied to a trial court’s actions in refusing requested questions and instructions.
Island Rec. Dev. Corp. v. Republic of Texas Sav.,
The trial court’s judgment is affirmed and the City of Princeton’s motion for rehearing is overruled.
Notes
. Section 11.086(a) of the Texas Water Code provides:
No person may divert or impound the natural flow of surface waters in this state, or permit a diversion or impounding by him to continue, in a manner that damages the property of another by the overflow of the water diverted or impounded.
Tex.Water Code Ann. § 11.086(a) (Vernon 1988).