134 Mo. App. 601 | Mo. Ct. App. | 1908
The defendants are property-owners in Independence, a city of the third class. The city undertook to pave a part of one of its streets on which
There are several reasons advanced by defendants why the bills are invalid. It will not be necessary to notice more than one, and that is the claim that the work and material for the paving was not provided for by an ordinance, and, in consequence, the contract let was not the result of competition. It appears that an ordinance was passed for the paving, to be done “with asphalt on concrete foundation in accordance with the specifications prepared by the city engineer for this work, on file in the office of the city clerk.” No objection is taken to the fact that the ordinance did not embody on its face the character, dimensions and material of the work. It is conceded that an ordinance may adopt specifications as a part of itself, which are at the time of the adoption of the ordinance on file in some place designated in the ordinance. [Galbreath v. Newton, 30 Mo. App. 380.] ' In that manner they become a part of the ordinance. But the complaint here is that the specifications on file with the city clerk did not designate the main and principal part of the paving, nor its mode of construction; that they, on their face, left that to future specifications to be submitted by the bidders in the shape of what is called a “formula.” The specifications on file with the clerk and which became a part of the ordinance, prescribed how. the concrete should be made and of what particular materials and the proportions thereof. They then specified of what the binder course should be composed and in what proportions. After thus providing for the foundation of the pavement, the specifications proceeded to specify that:
“(4) If the American Bituminous Rock Asphalt is used, the binder course to be omitted and a sufficient amount of the hydraulic concrete used to bring the sur*604 face of the concrete two (2) inches below and parallel with the finished surface of the. pavement.”
“(5) Upon the foundation thus prepared, there shall be placed an asphalt wearing surface not less than two (2) inches in thickness when thoroughly compressed, which shall be manufactured and made strictly in accordance with the formula accompanying the proposal.”'
This was followed by the specification that this two inch asphaltum paving surface “shall be laid substantially according to the formula accompanying the proposal, which shall in each case be treated as a part of the specifications and contract.”
The formula for the pavement, thus made a part of the specifications, was made up of the following specifications :
“Upon this concrete base will be laid the wearing surface or pavement proper, the matrix or binding material of which is a cement prepared with Trinidad asphaltum of the best quality obtained from the island of Trinidad, and heavy petroleum oil, unmixed with any of the products of coal tar.
“The heavy petroleum oil; the residuum obtained by distillation of petroleum — will be free from water, light oils, and other objectionable impurities, and specific gravity 18 degrees to 23 degrees Beaume, and will bear a fire test of 350 degrees Fahr.
“The Trinidad Asphaltum will be carefully refined and brought to a uniform standard of purity and gravity.
“The refined asphalt and petroleum residuum will be mixed in the following ratio by weight: The refined asphalt, 100 parts; heavy petroleum oil, 13 parts. But this ratio may be varied according to circumstances, as may be necessary to secure the best practical result.
“The pavement mixture, or wearing surface will be composed of: Asphaltic Cement, 12 to 16 per cent;*605 clear selected sand, 57 to 73 per cent; pulverized carbonate of lime, 15 to 17 per cent; 100 to 100.
“In order to make the pavement uniform and to secure the best results the proportion of asphaltic cement may be varied according to the quality and character of the sand.
“The proportion of carbonate of lime may be reduced, or it may be omitted entirely, when suitable sand can be obtained.
“The sand and asphaltic cement are to be heated separately to about 800 degrees Fahr. The pulverized carbonate of lime while cold, will be mixed with the hot sand, in the required proportions, and will then be mixed with the asphaltic cement at the required temperature, and in the proper proportion, in an apparatus suited to effect a perfect mixture.
“The pavement mixture thus prepared will be laid on the foundation. The first binder course per specification, the second, called the surface coat, prepared as above specified will be laid on the binder coat; it will be brought to the ground in carts at a temperature of about 250 degrees Fahr.; it will then be carefully spread by means of iron rakes in such a manner as to give a uniform and regular grade of two (2) inches.
“The surface will then be compressed by a band roller, after which a small 'amount of hydraulic cement will be swept over it, and it will then be thoroughly compressed by a heavy steam roller, the rolling to be continued as long as it makes an impression on the surface.”
It thus appears that the specifications for an important, if not the principal, part of the paving, viz: the aspbaltum surface, were not in existence when the ordinance was passed and could not have been provided by the ordinance. [Dickey v. Holmes, 109 Mo. App. 721.] The city council did not provide the material or character of work for the paving. That vital particular was not considered by that body when it passed the ordinance. It is true that this formula, or additional specifi
More than this, there was never any competition for the paving, as let. This for the simple reason that the particular work and material to be required, was not known until the bid was made. Who can say that others than plaintiffs would not have done the work for less? What opportunity had the public to. compete for the contract as finally made?
Even if it should be conceded that no harm was done, it would not be a sufficient answer. It is not a question of harm, hut one of power. It was said in Inge v. Board of Public Works, 135 Ala. 187, that “The basis of the bidding and of the contract entered into should be the same, for, otherwise, the very object and purpose of the law in calling for competitive bidding might be thwarted. ‘To require the bids upon one basis, and award the contract on another, would, in practical effect, be an abandonment of all bids. [Wickwire v. City of Elkhart, 144 Ind. 305; to the same effect, People v. Board of Improvement, 43 N. Y. 229; Shaw v. Trenton, 49 N. J. L. 339.]’ Any material departure in the contract awarded, from the terms and conditions upon which the bidding is had, renders the contract, in a sense, a private one. To permit such in the awarding of public contracts by public officers would be to open wide the door for favoritism and defeat the thing which the law intended to safeguard, in requiring the contracts to be let upon bids made on advertised specifications. It is unimportant whether the additional stipulation . . . be in itself an advantage to the city or not. If it constitutes a material change and therefore a departure from the basis of the bidding, and becomes an element or consideration in the determination of who is the lowest and best bidder, it will invalidate the contract entered into.”
The proceedings leading up to this tax are so clearly invalid as to render the bills void and the circuit court properly so held. The judgment is affirmed.