This сase is before us on appeal by defendants SS TEXACO TEXAS and its owner, Texaco Panama, Inc. (collectively “Texaco”) from a judgment of the United States District Court for the District of Massachusetts,
Shortly before dawn on January 15,1979, the TEXAS, a single-screw oil tanker with an overall length of 630 feet and a beam of 85 feet, entered Boston Harbor en route to the Texaco fuel dock in the Chelsea Creеk, at Chelsea, Massachusetts. As requested by Texaco, the ship was met by two tugs belonging to Boston Tow, the CABOT and the WARTON. The master of the CABOT, Captain Paul Perkins, boarded the TEXAS to serve as docking master. He proceeded to the ship’s bridge where he met the vessel’s master, Captain Luigi Barchi.
With both tugs secured alongside, and with Captain Perkins in command, the TEXAS proceedеd through the Inner Harbor toward the mouth of the Chelsea Creek. On the bridge with Perkins and Barchi were the third mate and a helmsman. Perkins gave all helm and engine commands and directed the tugs by radio. Captain Barchi, whose native language is Italian but who also spoke English, translated Perkins’ orders into Italian for relay to the appropriate crewmembers.
In order to еnter the Chelsea Creek and pass under the McArdle Bridge, a vessel must make a ninety degree turn to starboard from a heading of almost due north to one of almost due east. According to all eyewitnesses, the approach of the TEXAS to the draw of the McArdle Bridge was normal in all respects. The TEXAS was in mid channel and properly on course. Howevеr, when the ship reached a point about 200 to 300 feet from the bridge, its bow suddenly came to port and headed toward the bridge. Despite the best efforts of Captain Perkins and the crews of both the ship and the assisting tugs, the TEXAS struck the northern side of the bridge, damaging the wooden fender pier that protects the bridge abutment and the bridge sidewalk. The district court found that a mistranslated order just prior to the collision caused the ship’s sudden swing to port. 1 The court concluded that Texaco was liable to pay $225,000 in damages plus 9% in prejudgment interest, calculated from the date of the collision. Additionally, under the so-called “pilotage clause” in the towage agreement between Texaco and Boston Tow, the court awarded Boston Tow its attorneys’ fees in an amount stipulated by the parties.
The OREGON Rule
At trial, Texaco claimed that there was no rudder error, and that the only plausible explanation was lateral drift caused by wind and current.
The court relied on testimony of Captain Perkins, Captain Stowe of the tug WAR-TON, and the City’s expert witness on ship-handling, Captain Kradolfer. Additionally, exрlanations made to the Coast Guard in *1398 vestigator within an hour of the accident supported a conclusion of rudder error. The testimony of Captain Perkins takes on added credibility when one remembers that his initial report of rudder error was against the interests of both of his employers—Boston Tow and Texaco—since liability for the ship’s fault would rest with one or both of them.
The rule is well settled that when a vessel under its own power collides with an anchored vessel or a navigational structure, the burden of proving absence of fault or
vis major
rests on the pilot vessel.
The Oregon,
It is not governed by Rule 301____ The weight and effect of such a presumption is dеtermined, as a matter of substantive law, in the light of the considerations that prompted its adoption____
Here, of course, we neither create nor modify a presumption, but merely apply a rule that long antedated adoption of the Federal Rules of Evidence. In doing so, we act in conformity [with] the traditional responsibility of the federal courts to еnunciate and develop the substantive principles of admiralty and maritime law. [Citations omitted]. The allocation of burdens we apply today have been fashioned by the federal courts under the authority of Article III of the Constitution. In addition to the factors we have discussed that make this allocation of burdens logical, we would be reluctant to hold thаt the adoption of the Rules of Evidence altered such a principle.
James v. River Parishes Co., Inc.,
Texaco presented evidence in an effort to prove that the sudden leftward movement of the TEXAS and the subsequent collision were not the fault of the vessel or its crew, but were caused by an unavoidable lateral set resulting from a combination of gusting winds and an ebb current. The trial judge specifically found that there was no evidence that either the wind or the current at the time of the collision were of sufficient magnitude or unusual direction to support Texaco’s explanation for the collision.
The record is rife with conflicting evidence supporting and refuting each party’s theory of the accidеnt. Rule 52(a) of the Federal Rules of Civil Procedure specifically requires that “[f]indings of fact shall not be set aside unless clearly erroneous, and due regard shall be given to the opportunity of the trial court to judge the credibility of the witnesses.” Considering that the court’s findings of fact are not clearly erroneous, we must, therefore, conclude that Texaco did not meet its burden of persuasion.
*1399 The Pilotage Clause
The district court ordered Texaco to reimburse codefendant Boston Tow for its attorneys’ fees, finding authority to do so in the language of the “pilotage clause,” which the court found to be part of the contract between the two companies. 2
Texaco attacks the validity of the pilo-tage clausе alleging that it is actually an exculpatory clause that contradicts public policy. It urges that we reexamine
Sun Oil v. Dalzell Towing Co.,
The situation of the agreement in Sun Oil directly parallels the facts of the case at bar:
... in anticipation of the arrival of the Sabine Sun, Turnbull, petitioner’s assistant marine superintendent, arranged by telephone to have respondent send tugs to take her through the waters ... There was no writing or formal contract concerning the service to be rendered. The agreement pieced out from the oral order and acceptance and prior like transactions between the parties included as one of its terms the [pilotage clause].
Sun Oil, supra,
at 292,
Texaco asks that we set aside this exemption from liability which today appears to be generally accepted throughout the country in pilotage relationships. We do not find that the facts of the case at bar warrant such an action, even assuming we were inclined to overrule a higher court. While the record shows conflicting testimony as to whether Captain Barchi signed the approval slip containing the pilotage clause before or after the collision, the record is clear that Texaco had a 15 year history of approving agreements containing the clause, and as it had always done before, requested the service by telephone, specifying the particulars. Texaco’s argument that Boston Tow enjoyed a monopoly and, therefore, had a superior bargaining positiоn is without merit. The evidence reveals three additional tow companies operated in Boston Harbor with personnel holding the appropriate coast guard licenses to provide docking master services. Additionally, Texaco had employees of its own who held the requisite licenses. What Texaco’s argument does show, rather than a de facto monopoly, is their evaluation that Boston Tow’s pilots were the most experienced and *1400 competent ones available, and it was for this reason that they were hired. 4
Texaco cites
Bisso v. Inland Waterways Corp.,
A pilotage clause exempts for the negligence of pilots only; a towage clause exempts for all negligence of all towage employees. Pilots hold a unique position in the maritime world and have been extensively regulated both by the States and Federal Government ... Under law and custom they have an independence wholly incompatible with the general obligation of obedience normally owed by an employee to his employer ... As a rule nо employer, no person can tell them how to perform their pilotage duties. When the law does not prescribe their duties, pilots are usually free to act on their own best judgment while engaged in piloting a vessel.
Bisso, supra,
at 93-94,
The burden of establishing that a contractual provision is against public policy is on he who makes such an assertion.
National Distillers Products Corporation v. Boston Tow Boat Co.,
Alternatively, Texaco argues that attorneys’ fees cannot be indemnified in this situation. In general, it has been held that in admiralty cases, attorneys’ fees will not be awarded.
See American Union Transport Co. v. Aguadilla Terminal, Inc.,
Prejudgment Interest
Texaco argues that the award of prejudgment interest from the date of collision is erroneous, because the City did not repair most of the damage,
6
and thereby, suffered no loss of return on expended capital. It is also alleged that the City did not suffer substantial loss of use of the bridge. Citing
Stevens v. F/V Bonnie Doon,
While the damages in this case are clearly of a different nature than those in which vessels are totally lost or put out of service, or even when there is no loss of service,
7
they are, nonetheless compensable. It has been over six years since the TEXAS virtually destroyed the City’s fender pier through no fault or contributing negligence of the City. Since that time the City has suffered an increased risk to its citizenry due to the loss of protection provided by the previously sound structure. While it is unclear which estimate of damages, or combination thereof, was used by the court in making its award, we do not find, basеd upon the evidence presented by the City, that the damages plus interest awarded from the date of collision, has unjustly enriched the City. The City is entitled to the income which the monetary damages would have earned, and that should be measured by interest on short-term, risk free obligations.
Independent Bulk Transport v. Vessel MORANIA ABACO,
The decision of the district court is affirmed.
Notes
. The district court found that the collision occurred because "the vessel’s rudder was placed to port instead of starboard as ordered by Captain Perkins shortly after 0509 hours; and this [was] a result of Captain Barchi or the Third Mate's error in translating Captain Perkins’ hard starboard order from English to Italian."
. The pilotage clause reads in its entirety: PILOTAGE-When the captain or other officer of any tug provided for, or engaged in, the service of furnishing tug power for, or assistance to, a vessel which makes use of or has available her own propelling power goes on board the said vessеl or any other licensed pilot goes aboard said vessel, it is understood and agreed that said tugboat captain or other officer or licensed pilot becomes the servant of the owners of said vessel in respect to the giving of orders to any of the tugs provided for, or engaged in, said service and in respect to the handling of such vessel, and nеither those providing the tug or tugs, nor the tug or tugs, their owners, agents, or charterers shall be under any liability for damages resulting therefrom, and, further, that said tug or tugs and/or their owners, agents and/or charterers shall be under no liability for executing the orders of said tug captain or other officer or licensed pilot.
. Under the criteria of Restatement (Second) of Agency, § 220(2) (1957), the more proper characterization of the docking master might be an independent contractor' rather than a borrowed servant. See generally Note, The Pilotage Clause: Albatross of Admiralty Law, 64 Boston L.Rev. 823, 835-47 (Í984). Such a status could lend even greater support to the rationale of relief from liability of the towage company.
. Vessels using the services of Boston Tow boats are not required to use its pilots as docking masters.
. Additionally and perhaps equally important is the fact that we do not have before us information about the economics and organization of docking pilotage with which we can evaluate the consequences of a change in the established rule. Evidence in the case showed that Perkins received a $90 fee for his service as docking master. If the expense of the added liability is grеater than the possible economic benefit to the towing companies, the companies might conceivably refuse to allow their captains to act as docking masters, thus creating a situation whereby those most qualified would be unable to perform this service. Alternatively, as pointed out in Parks, The Law of Tug, Tow and Pilotage 1068 (2nd ed. 1982):
It must be remembered that literally every ship being pilоted has already procured P & I insurance insuring the liability of its owner to third parties for negligent acts of its master, crew and pilots. If the "loaned employee" status of the harbor pilot is to be ignored, then the tug company, both with respect to its assisting tugs and its "loaned” harbor pilot, must procure insurance in an amount equal to the full value of the largest vessel hаndled and her cargo. The cost of such insurance necessarily must be included in the ship assistance rates charged, in which case vessel owners will be paying twice for insurance against the same risks.
(Emphasis in original).
See also, Kane v. Hawaiian Independent Refinery, Inc.,
. Repairs to the bridge sidewalk costing $4,722 were made in 1979. Services and repairs made after that date totaled $6,395.
.
See, e.g., Stevens v. F/V Bonnie Doon,