213 Mass. 407 | Mass. | 1913
The Boston Transit Commission, in accordance with the requirement of St. 1897, c. 500, § 17, constructed a tunnel running from Boston proper to East Boston. That section, so far as now material, reads as follows: “The Boston Transit Commission shall construct a tunnel or tunnels, of sufficient size for two railway tracks, with approaches, entrances, sidings, stations and connections therefor, and for the running of railway cars therein, from a point on or near Hanover Street in the city of Boston, or such other point or points as said board may deem proper for a suitable connection- with the subway or súbways provided for” in another statute, “to a point at or near Maverick Square in that part of Boston called East Boston, where a suitable connection with surface tracks may be made. Said tunnel or tunnels shall be constructed in a thorough and substantial manner, with special reference to strength, durability and safety for railway travel, and shall be water tight, or in case of leakage the water shall be taken care of by said city.” The section then enacts that the tunnel when completed shall be leased to the defendant. Section 18 of the same statute provided for the issue of bonds by the city of Boston, the proceeds of which should be applied to pay “the cost and expenses of constructing” certain other subways “and of the tunnel or tunnels . . . provided for in the preceding section, and the stations, inclines and steps in connection therewith.” In the tunnel the Transit Commission constructed a station near the corner of Atlantic Avenue and State Street, and at each end of the station put in a stairway running to the surface of the street. The Commission constructed also at this station elevator shafts or wells, adapted and intended for four large elevators running from the floor of the tunnel not only to the surface of the street, but also to a landing fourteen feet above that surface and connected with a station on the defendant’s elevated railway. The commission
A preliminary question is whether, after it has been determined what is the character of the instrumentalities in question, and whether or not the means of access to the tunnel and the station which they afford are reasonably necessary for that purpose, the point is to be determined as an isssue of law or of fact. That question in our opinion is settled in principle by the decision in Selectmen of Natick v. Boston & Albany Railroad, 210 Mass. 229, 232. As in that case, the question here is as to the meaning of the words used in the statute; and that is a question of law. And in Browne v. Turner, 174 Mass. 150, 161, the court determined the meaning of the word “connection” in this very statute as a question of law. So in this case, it being settled just what these particular structures or articles of mechanism are, just what purpose they are intended and fitted to serve, and whether or not that use is both designed and adapted and reasonably necessary for the pur
The character of this elevator plant, including the cars and the machinery by which they are operated, is not in dispute. That the whole plant is reasonably necessary for the accommodation of the public, to afford access to and departure from the tunnel, was found as a fact. That this finding was fully warranted has not been denied, and indeed is hardly open to dispute. It seems to have been assumed by both parties. It is manifest enough that the stairways at the east and west ends of the station, with their restricted width, their great length, and the small number of their breaks or platforms, do not furnish a convenient means of access to the station, and often might be wholly insufficient for that purpose. It may be doubted whether any stairways could be regarded as adequate approaches or entrances to a tunnel sixty feet underground. But this question need not be discussed; it is concluded by the finding that has been made.
It is, as it must be, undisputed that the stairways are “approaches” or “entrances” within the meaning of those words as used in the statute. It is plain too that when it was seen that the two stairways provided did not furnish sufficient means of entrance, the duty of the Transit Commission was not fulfilled, but it was incumbent upon them to provide further entrances’ or approaches. If instead of constructing elevator shafts they had chosen to put in moving sidewalks or escalators, these certainly would have been included within the words of the statute. But. such moving sidewalks would not have served their purpose, would not have been capable of use in the manner intended and with the convenience to the travelling public which was aimed at, unless with them and as a part of their construction was furnished also the mechanism by which they could be operated. An elevator shaft without a car to run therein and machinery by which to operate it is wholly useless; it is no entrance at all; it becomes an entrance only when suitably fitted up and supplied with the means by which alone it can be made to serve as an entrance. It is only the completed plant that can be used as an entrance; the completed plant therefore must be included in that word.
The object of the whole body of legislation of which the statute
We do not consider the fact that these elevators reach a point somewhat above the surface of the street, so as to furnish a connection with the defendant’s elevated railway station, to be material, as the case has been presented to us. The system now appears to be one integral whole, not divided or attempted to be divided into separate parts with a plane of division at the surface of the street. How this may appear at another trial of the case, we do not know. The shafts or wells were, as they should have been, built by the Commission as a part of the tunnel. The elevators fitted for use are a necessary part of the entrance or means of access thereto. Perhaps the commission might have limited the height of their construction to the surface of the street; but so far as appears they did not choose to do so, and they may have acted wisely in affording ready means of communication and direct entrances and approaches between the tunnel and the elevated railway system. While all this construction was of course for the benefit of the public, it must be remembered that this benefit was to be obtained and the congestion of the streets was to be avoided by providing accommodations for those who were, or had been, or were about to become passengers upon the cars of the street railways. The finding of the judge at the trial, “that the elevators were used almost entirely as a means of communication between the tunnel station and the elevated railway station, and very little by passengers going to the station from the street
It follows from what we have said that the judge at the trial, upon his preliminary findings of fact, should have ruled, as requested by the defendant, that the duty of furnishing and installing the elevators as an entrance to the tunnel and the station therein rested upon the Transit Commission and not upon the defendant, and so that this action could not be maintained upon the evidence put in, and that his sixth finding, at least so far as it applied to the whole of the perpendicular elevator plant or system, was erroneous as matter of law.
Exceptions sustained.