111 Tenn. 202 | Tenn. | 1903
delivered the opinion of the Court.
Tbe original bill in this case was filed for tbe purpose of collecting tbe purchase money for some castings alleged to bave been sold by tbe complainant to tbe defendant. Thereupon tbe defendant filed a cross \ bill to recover damages for breach of tbe contract under which tbe castings were purchased. -Tbe court of chancery appeals, after deducting a certain amount, not now in controversy, for castings accepted and used by tbe cross complainant, found that there was a balance due to tbe latter under its claim of damages, and rendered a decree therefor. From this decree tbe original complainant has appealed and assigned errors.
The complainant is a corporation organized under the laws of Ohio, with its office in Cleveland; and the defendant is a corporation organized under the laws of Tennessee, with its office in Knoxville. Complainant is engaged in the manufacture of castings of various kinds; the defendant, in the manufacture and sale of canopies and canopy frames for mosquito nettings. Defendant ordered from complainant a large amount of malleable iron castings for mosquito canopy frames. These castings came in sets of two for each canopy, and each set consists of two pieces, which should work or fit into each other — one called the “right,” and one the “left.” One piece has a journal or pin which should fit into a hole or socket in the other piece. The castings which the complainant shipped to the defendant were defective, in that the journal or pin of the one piece was
The defendant company was organized for, and was engaged in, the manufacture and sale of mosquito canopy frames, and it had bought and contracted for materials for this purpose, including the netting, frames, wires, and brackets. It was using in this manufacture a peculiar device — an invention of one of its officers— as to which a patent had been applied for, being the bracket which is the subject-matter of this litigation, and it was using no other bracket except this. Under these conditions, the defendant applied to the complainant for the purpose of procuring 'the latter to manufacture for it these brackets. The evidence and the correspondence between the parties shows that it was known to the complainant for what purpose this bracket was to be used, and the fact that a patent had been applied for was known, and that it was a peculiar device, owned and claimed alone by defendant, and used by it in the sale of its mosquito canopy frames. It was further necessarily known how this device was to work, and how the bracket was to be used.
The correspondence further discloses that it was made known to the complainant that it was urgent and important that these brackets should be manufactured and on hand by the twentieth of April, if possible, or as soon
With these conditions existing, the complainant violated the contract in the manner above stated. That is, a large part of the goods actually delivered and received
The court of chancery appeals further finds that defendant had soliciting agents and salesmen in the field, and had sold or taken orders for a considerable number of the mosquito canopy frames above referred to. Their orders so taken and received by them from good and solvent parties amounted to from $2,200 to $2,500.
It is further found that the profits the company would have received from this amount of sales, which they had to cancel because of complainant’s default, would have been about 50 per cent, of the gross amount, or from $1,100 to $1,250.
Speaking further of these damages, the court of chancery appeals say:
“We think there can be no escape from the conclusion that these damages were actually suffered by the defendant. They are not only capable of satisfactory proof, but they have been proven, and we think they were within the reasonable contemplation of the parties when the contract was made. The complainant knew the defendant was dealing in these mosquito canopy frames; that defendant was using this bracket as a*209 necessary part in the manufacture of the frames. They necessarily knew that defendant was taking orders. They necessarily knew that they could not comply with these orders unless they could use these brackets. They necessarily knew that the brackets could not be bought in the open market. They necessarily knew that, if the complainant did not comply with this contract, the defendant would lose the business of that season. They necessarily knew that it would lose whatever profit it would have made upon the orders that it should take and be unable to fill, if the complainant did not comply with its contract. The officers of complainant did not know what amount of orders had been or would be taken, but they necessarily must have known, and reasonably had in contemplation, that they would suffer loss of whatever the profits amounted to upon such orders as might be taken, if they were unable to fill the orders by reason of complainant’s default. . . . They necessarily had in contemplation the character of loss that would follow a breach.”
The error assigned is, in substance, that it was improper for the court of chancery appeals to allow the expected profits as damages, for the reason that this amounted to an allowance of speculative damages.
It is true, in general, that the measure of damages for breach of an executory contract of sale of personalty is the difference between the contract price and the market value of the goods at the time and place of delivery.
The reasons underlying the general rule, and also a succinct statement of the grounds of the exceptions recognized to the rule, may be found in the following excerpt from Howard v. Stillwell & B. Mfg. Co., 139 U. S., 199, 11 Sup. Ct., 500, 35 L. Ed., 147, which we adopt as a sound statement of the law, viz.:
“The grounds upon which the general rule of excluding profits in estimating damages rests are (1) that in the greater number of cases such expected profits are too dependent .upon numerous uncertain and dangerous contingencies to constitute a definite and trustworthy measure of actual damages; (2) because such loss of profits is ordinarily remote, and not, as a matter of course, the direct and immediate result of a nonfulfillment of the contract; (3) and because most frequently an .engagement to pay such loss of profits in case of default in the performance is not a part of the contract itself, nor can it be implied from its nature and terms. 1 Sedg. Damages (7 Ed.), 108; The Lively, 1 Gall., 315, 325, Fed. Cas. No. 8,403 per Mr. Justice Story; The Anna Maria, 2 Wheat., 327, 4 L. Ed., 252; The Amiable Nancy, 3 Wheat., 546, 4 L. Ed., 456; La Amistad de Rues, 5 Wheat., 385, 5 L. Ed., 118; Smith v. Condry, 1 How.,*211 28, 11 L. Ed., 35; Parish v. United States, 8 Wall., 500, 507, 19 L. Ed., 472; Bulkley v. United States, 19 Wall., 37, 22 L. Ed., 62. But it is equally well settled that the profits which would have been realized, had the contract been performed, and which have been prevented by its breach, are included in the damages to be recovered in every case where such profits are not open to the objection of uncertainty or of remoteness, and where, from the expressed or implied terms of the contract itself, or the special circumstances under which it was made, it may be reasonably presumed that they were within the intent and mutual understanding of both parties at the time it was entered into. U. S. v. Behan, 110 U. S., 338, 345-347, 4 Sup. Ct., 81, 28 L. Ed., 168; W. U. Tel. Co. v. Hall, 124 U. S., 444, 454, 456, 8 Sup. Ct., 577, 31 L. Ed., 479; Phila., W. & B. R. Co. v. Howard, 13 How., 307, 14 L. Ed., 157.”
Other illustrative authorities are as follows:
In section 144 (8 Ed.), Sedg. on Damages, the case of Hadley v. Baxendale, 9 Ex., 341, is discussed and considered at length, and in a note to this section it is said:
“So entirely is the later law founded on this case, that the great body of cases since decided, involving the measure of damages for breach of contract, resolve themselves into a continuous commentary upon it.
“Plaintiffs were the owners of a steam mill. The shaft was broken, and they gave it to the defendant, a carrier, to take to the engineer to serve as a model for a new one. On making the contract, the defendant’s*212 <;lerk was informed that the mill was stopped, and that the shaft must be sent immediately. He delayed its delivery, the shaft was kept back in consequence, and, in an action for breach of contract, they claimed as specific damages the loss of profits while the mill was kept idle. It was held that, if the carrier had been made aware that a loss of profits would result from delay on his part, he would have been answerable, but, as it did not appear that he knew that the want of the shaft Avas the only thing which was keeping the mill idle, he could not be made responsible to such extent. The court said: ‘We think the proper rule in such cases as the present is this: Where two parties have made a contract, which one of them has broken, the damages Avhich the other party ought to receive in respect of such breach of contract should be such as may fairly and reasonably be considered either arising naturally (that is, according to the usual course of things) from such a breach of contract itself, or such as may be reasonably supposed to have been in the contemplation of both parties at the time they made the contract as a probable result of the breach of it. Now, if the special circumstances under which the contract was actually made were communicated by the plaintiff to the defendant, and thus known to both parties, the damages resulting from the breach of such a contract which they would reasonably contemplate Avould be the amount of injury Avhich Avould ordinarily follow from a breach of contract under these special circumstances so known and communicated. But*213 on the other hand, if these special circumstances were wholly unknown to the party breaking the contract, he, at the most, could only be supposed to have had in his contemplation the amount of injury which would arise generally, and in the great multitude of cases, not affected by any special circumstances, from such breach of contract. For, had the special circumstances been known, the parties might have specially provided for a breach of contract by special terms as to the damages in that case, and of this advantage it would be very unjust to deprive them. The above principles are those by which we think the jury ought to be guided in estimating the damages arising out of any breach of contract.’ ”
In section 146, Sedgwick states: “The rule in Hadley v. Baxendale would seem to mean that plaintiff may recover such damages as normally result from the breach of contract, or he may show certain special facts to have been known to the defendant at the time of the contract, which would give notice to him that a breach of the contract would result in an otherwise unexpected loss, and in such case the plaintiff might recover his special loss.”
In the case of Hobbs v. London & S. W. Ry. Co., L. R., 10, Q. B., 111, Blackburn, J., citing the rule in Hadley v. Baxendale, Says:
“We think the proper rule in such a case as the present is this: Where two parties have made a contract, which one of them has broken, the damages which the*214 other party ought to receive in respect of such breach of contract should be such as may be fairly and reasonably considered either arising naturally (that is, according to the natural course of things) from such breach of contract itself (that is one alternative), or such as may be. reasonably supposed to have been in the contemplation of both parties at the time they made the contract as the probable result of the breach of it.”
Again, in section 174, the same author says:
“The allowance of profits, when not excluded as unnatural or remote, is wholly a question of the certainty of proof. Whenever there is an interference with or withholding of property, or breach of contract, or commission of a tort, the gains prevented, if proven, may be recovered. As a general rule the expected profits of a business cannot be proved, and therefore cannot be recovered. They might have been made, and they might not. . . . Instead of profits, there might have been losses. Hence in such cases the measure of damages is not the expected profits, but the average value of the use of the property, land, or business; and, to ascertain this, evidence of actual past profits must be admissible. This bears a close analogy to the ordinary rule with regard to money. Expected profits from the use of money can never be recovered. The measure of damages is the average value of the use, or, in other words, the interest. Going a step further, we shall find that, whenever expected profits become capable of certain proof, then they can be recovered.”
“Profits are recoverable if proximate, natural, and •certain. The plaintiff may then, in all proper cases, show a gain prevented, as a ground of compensation.”
And again: “In the leading case on the subject, Selden, J., in Griffin v. Colver, 16 N. Y., 489, 69 Am. Dec., 718, said:
“ ‘It is not a primary rule, but it is a mere deduction from that more general and fundamental rule which requires that the damages claimed should in all cases be shown by clear and satisfactory evidence to have been actually sustained. Profits that would certainly have been realized but for defendant’s default are recoverable. Those which are speculative and contingent are not.’ ”
And again, further on, quoting from the same opinion, the author says:
“The broad, general rule in such cases is that the party injured is entitled to recover all his damages, including gains prevented as well as loss sustained. And this rule is subject to but two conditions: The damages must be such as may fairly be supposed to have entered into the contemplation of the parties when they made the contract (that is, must be such as might naturally be expected to follow its violation), and they must be certain both in their nature and the cause from which they proceed.”
In section 177, Sedgwick says:
“The general rule is, then, that a complainant may*216 recover compensation for any gain which he can make it appear with reasonable certainty the defendant’s wrongful act prevented him from acquiring, subject, of course, to the general principles as to remoteness, compensation, etc., already stated. His compensation will be measured by the most liberal scale which he can show to be a proper one. Damages for the interruption of the business of a manufacturer, for instance, may be measured either by the rental value of the property kept unproductive or by the profits of the manufacture, if the plaintiff can show that they would have been greater than the rental value. The questions that arise in the cases are therefore questions of sufficiency of proof, and it is to be expected that the courts will not in all cases agree in their interpretation of the facts. But the decisions show, under the circumstances, a surprising degree of harmony.”
The rule in Hadley v. Baxendale has been approved in this State in McDonald v. Unaka Timber Co., 88 Tenn., 38, 43, 44, 12 S. W., 420; Reese v. Miles, 99 Tenn., 398, 401, 41 S. W., 1065; Railroad v. Cabinet Co., 104 Tenn., 568, 574, 575, 58 S. W., 303, 50 L. R. A., 729; and in Machine Co. v. Compress Co., 105 Tenn., 187, 203, et seq., 58 S. W., 270.
There are several cases in this State which hold that profits cannot be allowed as damages, on the ground that they are speculative and uncertain. Hendrick v. Stewart, 1 Overt., 476; Pettee v. Tenn. Mfg. Co., 1 Sneed, 380; Whitson v. Gray, 3 Head, 442; Hurley v. Buchi, 10
In the last-mentioned case it appeared that a cotton compress bad been injured by defective machinery furnished. The measure of damages was fixed at the rental value of the property during the ensuing cotton season. The court held that the machinery was furnished with a view that it was to be used in that season. It was said that the expected profits to be gained by the running of the mill could not be allowed as damages.
In Railroad v. Cabinet Co., supra, it appeared that certain pews -had been manufactured by the cabinet company for a church in Virginia, and they were to be delivered by a certain date, under a penalty for each day’s delay thereafter. The railway company received the goods, having knowledge of the penalty contract referred to. The court held, applying the principles of Hadley v. Baxendale, that the cabinet company should recover of the railroad company the penalty which it had incurred to its vendee. The court said: “The contract and breach by the defendant now before the court was undoubtedly a special one. The pews in question were manufactured after a peculiar design for a particular church, under a particular contract, of which the defendant was particularly informed at the time it accepted them for carriage. The contract and carriage being special, the penalty for its nondelivery was likewise special, and the plaintiff was entitled to recover
In the same case it is said: “If the property is sold at an advantageous price before shipment on condition that it be delivered within a certain time, and the carrier, with knowledge of that fact, undertakes the transportation, and, through negligence, fails to make the delivery in time, and the conditional purchaser fails to receive the property on account of the delay, the liability of the carrier is measured by the difference between the market value of the property when it arrived at the place of destination and the price at which it was conditionally sold before shipment.” Deming v. Grand Trunk Railway Co., 48 N. H., 455, 2 Am. Rep., 267; Hutchinson on Carriers, section 772.
In the same case the following is quoted with approval from 3 Wood’s Railway Law, 1607: “If the intended use and application of the goods to be carried was expressly brought to the notice of the company’s servants at the time they received them, or could be reasonably inferred from the circumstances known to them, so that the special use .or application might be fairly considered to be within the contemplation of both parties to the contract, the consignor is entitled to recover the damages naturally resulting from his so being unable to use or apply the goods, since both parties may be said to have made this the basis of the contract.”
In Reese v. Miles, 99 Tenn., 398, 41 S. W., 1065, it appeared that eggs were sold as fresh eggs, with a knowl
We have referred supra to the cases of Hendrick v. Stewart, 1 Overt., 476; Porter v. Woods, 3 Humph., 56, 39 Am. Dec., 153; Pettee v. Tenn. Mfg. Co., 1 Sneed, 381; Whitson v. Gray, 3 Head, 442; McWhirter v. Douglas, 1 Cold., 602, 603; Hurley v. Buchi, 10 Lea, 346; and Machine Co. v. Compress Co., 105 Tenn., 212, 58 S. W., 270—as holding that profits cannot be allowed as damages, on the ground that they are speculative and uncertain.
But it is to be observed that in none of those cases did the court have before it directly the exact question presented for consideration in the present case.
In the cases referred to, the general principle that profits cannot be allowed as damages, because too uncertain and speculative, was enunciated in respect of the following facts, viz.:
In Porter v. Woods it appeared that the defendant was sued for the value of certain castings to be used in the manufacture of plows, which castings had proven defective. He sought to recoup “for delay in business, for injury to his -reputation, for speculative profits.” The court held that damages of this character could not be allowed.
In Pettee v. Tenn. Mfg. Co., it appeared that the plaintiff had delivered to the defendant machinery for a cotton mill, but that the delivery had been delayed beyond the time fixed in the contract. The plaintiff sued for the Value of the machinery, and the defendant sought to recoup damages for the delay, by reason of injury alleged to have been inflicted upon his business by the delay. Speaking to this point the court said:
“Damages for breaches of contract are only those which are incidental to, or directly caused by, the breach, and may be reasonably supposed to have entered into the contemplation of the parties, and not speculative profits or accidental or consequential losses. 2 Kent, Comm. 480, note. Although this is a general rule, in its application to particular cases there is the most serious and distressing difficulty, and the legal and natural consequence, or the natural and proximate consequence, cannot easily be discovered. It must be left for the application to causes as they may arise by sound and discriminating minds. There are, however, some cases which show that an allowance of damages upon the basis of a calculation of profits would be inadmissible. Such profits are too speculative and uncertain to
In Whitson v. Gray it appeared there was a misrepresentation of four and one-half years as to the age of a slave woman, the subject of the contract, and it was sought to prove as an element of damages “that the woman in four and a half years might have given birth
In McWhirter v. Douglas, there was a contract whereby Douglas agreed to pay McWhirter for the three years next ensuing November 27, 1852, the difference between “what the business of H. & B. Douglas promises” for the three years stated and the sum which might be realized by McWhirter during this time under an offer made- to him by Cossitt, Howard & Hill, “which,” said the contract, “we now presume to he from one thousr and dollars to three thousand dollars.” The contract provided that the sum so to be paid should be paid to him “so soon as the correct amount can be arrived at.” Under the offer which Cossitt, Howard & Hill had made to McWhirter, the latter was to be taken into partnership after six months’ probation, if at the end of that time they should be mutually pleased, and was to receive 20 per cent, of the profits. McWhirter remained with Douglas & Co. for the three years they had agreed upon. After this, assuming that he had not realized from the business of this firm as much as he would have made if he had accepted the proposal made to him by Cossitt, Howard & Hill, McWhirter brought suit against Douglas upon the paper of November 27, 1852.
On the trial, Cossitt proved that the offer was made to McWhirter in good faith. The witness objected to stating what the profits had been of his firm during the three years in question, and the objection was sustained by the trial judge. Thereupon he was asked this ques
The court, speaking through Wright, J., said: “We do not agree with the circuit judge in his construction of this contract. . . . Douglas might have said to Mc-Whirter: When the business of the two firms is over, and the actual profits of each knoivn, if what you get from my business is not equal to twenty per cent, of the profits of the other hoqse, I will make it so.’ But the l&aguagie of this writing is very different, and, in our opinion, conveys no such idea. What, then, was meant? Douglas said to McWhirter: ‘You have before you two offers — one in my house, and one in the Memphis house. The business of my house bids fair, judging from the past, and this additional capital to go on, to make so much; and that of the Memphis house, judging by what Cpssitt says, to make so much. You think the offer of the Memphis house is the better one of the two. So do I. We have compared the two offers, and computed their values, and we now suppose the offer of the Memphis house to be more valuable, by from one to three thousand dollars. If you will give up the Memphis offer and become a partner in my house, I will pay you the difference in the value of the two offers, so soon as the actual sum can be arrived at. We have now in our minds some data or rule by which this is to be reached, and to which, as soon as we can, we will resort to settle it.’
“Remote and contingent damages, depending on the result of successive schemes or investments, are never allowed for the violation of any contract. Such a rule would be in the highest degree unfavorable to the interests of the community. The subject would be involved in utter uncertainty. . . . Another reason why speculative estimates of profits will not be allowed is that it is not proper to admit witnesses to testify their opinion as to the amount of damages which the plaintiff has sustained in their loss or deprivation. They can only testify as to facts (Sedg. on Dam. 589, 591), and to permit a witness to testify as to what a mercantile house ought to have made upon a given capital, in order to reach anticipated profits, is even more objectionable. Here McWhirter, in the offer of Oossitt & Hill, was to share only in the profits. He was to take none of the capital. It was uncertain whether they would all agree, upon the six-months probation, to form the partnership; and then it Avas dissolvable by death, or by the action of either of the parties in thirty days’ time, and the good fortune of the house in its successive schemes of investment, sale, and reinvestment were all to risk. How, then, could the value of the offer to McWhirter, unless fixed by him and Douglas, be anything but conjectural?”
In Hurley v. Buchi it appeared that plaintiff, a market
In Machine Co. v. Compress Co. there was no effort to prove any certain profits. Indeed, from the facts pre-
From this review of our cases, it is clear that the court did not in either of them have before it a state of facts in any wise resembling the facts shown in the present case, but, on the contrary, facts from which there could be no other conclusion than, that the damages sought were purely speculative and contingent.
We do not in anywise impair the force of the general rule that profits fall within the designation of speculative damages, and cannot be allowed; but we think there is a clear distinction where the testimony shows that the damages, although consisting of profits, are really certain and clear. In the present case it appears that orders had been taken from solvent people for goods, amounting to at least $2,200, and that the profit upon these sales was 50 per cent. Here is no element whatever of speculation or uncertainty. To deny compensation under these circumstances would be to apply the general rule to a case to which it was never intended to be applied, and work a practical injustice.
We think the facts stated show that the contract was made with a knowledge on the part of the complainant that the articles which they were to furnish were to be used in the manufacture of mosquito canopy nets, and
In State of Tennessee v. Ward & Briggs, 9 Heisk., 132, 133, and other cases (Foster v. Water Co., 3 Lea, 46; Winters v. Fleece, 4 Lea, 551; Smith v. O’Donnell, 8 Lea, 479; Insurance Co. v. Heidel, Id., 495; Insurance Co. v. Mathews, Id., 504), it is stated, in substance, that “the contract itself must give the measure of damages, and, if it fail to do so, the damages can only be nominal.” This is merely a brief statement of the rule in Hadley v. Bawendale — that “where .two parties have made a contract, which one of them has broken, the damages which the other party ought to receive in respect of such breach should be either such as may fairly and reasonably be considered-as arising naturally (i. e., according to the usual course of things) from such a breach of contract itself, or such as may reasonably be supposed to have been within- the contemplation of both parties at the time they made the contract as the probable result of-the breach of it.” The contract thus gives the measure of damages upon the first branch of the rule by the mere statement of its terms, its subject-matter, and the obligations of the parties. As to the second branch, it gives the-measure when, in the course of the dealing between
This phase of the matter is illustrated in Machine Co.
“Mr. Leach thoroughly understood, and we discussed together, the necessity for haying this contract done in time to press cotton for the season of 1897, and that, if his company took the contract, they were to take it and complete the work in time for the crop of 1897.”
And the following testimony of Mr. W. S. Campbell:
“What information, if any, did you impart to the Livermore Foundry & Machine Company of the necessity of having the work contracted for completed in time, and as to the uses to which the press, when repaired, was to be put?”
“Well, I, of course, impressed the fact upon him that we wanted it completed, in time to press cotton that would begin to come in to us; and, in fact, they fully understood the nature of the contract, and the necessity for having it in shape by the time the season was open for compressing.”
It is insisted by the complainant that these damages should not be allowed because the castings were not themselves to be resold, but were only to enter into the manufacture of another article of commerce, which was
It results, there was no error in the decree of the court of chancery appeals, and it must be affirmed.