196 Iowa 370 | Iowa | 1923
I. The portion of this district with which we are concerned, beginning about the section line on the north side
The plaintiff company presented claim before the board for $15,000 damages on account of the construction of the ditch across its right of way, for the cost of constructing a permanent •bridge, and for right of way taken for the ditch. The board allowed plaintiff’s claim in the amount of $81, that amount being allowed as compensation for a fraction of an acre of land, used for construction of the ditch. Nothing was allowed for cost of construction of a permanent bridge or for maintenance of a bridge.over the new ditch. Appeal was taken by plaintiff to the district court. At the conclusion of all the evidence in the trial in the district court, plaintiff moved for a directed verdict in its favor. The court overruled plaintiff’s motion, and sustained the motion of defendants, and directed a verdict in favor of defendants, and entered judgment against plaintiff for costs, from which judgment this appeal is taken. Plaintiff’s
The grounds of defendants’ motion to direct verdict in their favor were that the evidence without dispute showed that the new drainage ditch at the place where it crosses the right of way of the railroad is the natural waterway or watercourse, and that the undisputed evidence shows that said ditch was constructed at said point as a means for drainage and improvement of the territory, north of said railroad, and to facilitate drainage of said lands as a means of improvement of said district.
Other questions were raised in the motions which we need not consider.
II. The controversy arises under Section 1989-al8 of the Supplement to the Code, 1913. Portions of that section material in this action are as follows:
“And the cost of constructing the improvement across the right of way of such company, not including the cost of building and constructing or rebuilding and reconstructing any necessary culvert or bridge when such improvement is located at the place of the natural waterway or place provided by the railroad company for the flow of the water, shall be considered as an element of such company’s damages by the appraisers thereof; and the cost of building and constructing or rebuilding and reconstructing any necessary culvert or bridge when such improvement is located at the place of the natural waterway or place provided by the railroad company for the flow of the water, shall be borne by such railroad company without reimbursement therefor. ’ ’
The statute is plain that, if the drainage improvement crosses the right of way at a point that is not the natural waterway, or not at a place where the-railway company has provided for the passage of water, then the railway company is entitled to be reimbursed for the cost of constructing a bridge necessary to carry the drain across the right of way. On the other hand,
The controversy may be briefly stated thus: Plaintiff contends that the Jackson Ditch is the natural waterway. Defendants contend that the Jackson Ditch is an artificial ditch, located on higher ground than the natural surface where the new ditch crosses, and that the lower ground, — a swale or natural depression, where the new ditch is located, — is the natural waterway. The evidence of both parties shows without dispute that the Jackson Ditch does not run along the lowest surface levels of the land. The evidence shows that it does not follow in its course the natural surface slope, but cuts across such slope. The Jackson Ditch is in what is known as the Jackson 40. The Jackson 40 slopes to the south, and east, toward the southeast corner of the 40. The 40 lying east of the Jackson 40, known in the record as the Miller 40, slopes to the south and west: that is, toward the southwest corner of said 40. Both 40’s slope toward their corners where the drainage ditch crosses the railroad. The ground levels testified to by plaintiff’s engineer show that the ground rises from the west side of the drainage ditch toward the west to the Jackson Ditch, and on west of the Jackson Ditch; that, 500 feet west of the new ditch, the ground is a foot and three tenths higher than at the new ditch. Also, the testimony of plaintiff’s engineer shows that the ground rises from the east edge of the new ditch eastward; that, 600 feet east of the new ditch, the ground is two feet and seven-tenths inches higher than at the ditch. The testimony of defendants’ engineer shows practically the same levels, and that, going both east and west from the new ditch, the surface levels rise. The
We reach the conclusion that the undisputed facts show that the drainage ditch was located across plaintiff’s right of way at the natural waterway, and that the cost of constructing or maintaining the necessary bridge across the ditch is not an element of damage for which plaintiff can recover; nor can plaintiff recover for right of way. Under the record, it -was not error to overrule plaintiff’s motion for a verdict, and to direct verdict for defendants. The judgment of the trial court is— Affirmed.