184 Ky. 529 | Ky. Ct. App. | 1919
■Opinion op the Court by
Reversing.
The contract sued on is contained in a deed by which the plaintiff conveyed to the defendant a right of way 80 feet in width through his farm, and also a strip of land 10 feet wide running from the west end of the right of way strip and almost at right angles thereto, along plaintiff’s western boundary line “to the lowest point, on the surface, for the purpose of a ditch to be opened immediately upon the construction of said railroad, for the water from the ditches on either side of the railroad and the Chicago, Memphis and Gulf Railroad Company and its assigns to keep and maintain the ditches on either side of said railroad and the ditch on the west line open, and in good repair to the level of the lowest point of the surface on said line and the said Stephen Stahr and his heirs and a'ssigns to have the right if they so desire to lead tile into the ditches on either side of said railroad and into the ditch on the west line at such points as may be desired.”
In instruction No. 1 given by the court, the defendant’s obligation under the contract was stated to be to construct and maintain ditches upon either side of its-railroad track and therefrom over the latteral -strip of land “as deep as the lowest point on said land lines of sufficient width to carry said water from said land, as would reasonably be expected to fall in said vicinity,?T and a verdict was authorized for the plaintiff for any injury to his crops or loss of the use of the land he was prevented from cultivating in the years 1913, 1915 and 1916, as the jury believed from the evidence resulted' from overflow dr water remaining on his land longer than it otherwise would have done “from rainfall in said vicinity. ’ ’
1. This- instruction placed upon the defendant thfr obligation to construct and maintain these ditches so as-.
2. As urged by counsel for appellant, instruction No. 3 defining the measure of damages, if literally construed, seems to Avarrant double damages by authorizing allowance for any damage to crops and the loss of the use of the same land for each of the three years, Avhich of course was not intended, and probably not so understood by the jury, but this instruction should be corrected upon another trial, so as to make it clear that the measure- of damages applicable only to such of the land as was in cultivation Avas the difference between what was raised and what could have been produced thereon if there had been no breach of contract by the defendant, while for so much of the land as plaintiff Avas prevented from cultiAuting, if any, the measure of damages was its rental value for such time as plaintiff was prevented from using it.
3. Defendant by a separate paragraph of its answer, pleaded that the damage done to plaintiff’s growing crops in the several years complained of, was caused not by any breach of its contract, but by water backing up through the ditches and on to plaintiff’s land from a depression called Boss’ Pond into which the ditches which defendant was required to construct discharged such water as accumulated therein, and as there was some evi
It is insisted by counsel for appellee that'the errors if any in instruction No. 1 given and the error if any in refusing to give instruction “Z” offered by defendant presenting its affirmative defense, were cured by instructions “X” and “Y” given upon defendant’s'motion, which directed a verdict for the defendant, if the jury believed it had constructed and maintained ditches on each side of the railroad, and the ditch on the west property line to the lowest point on the surface of said line with proper opening under the track connecting the several ditches, and that the judgment must be affirmed under the rule that instructions will be considered as a whole and unless prejudicial when so considered, a reversal will not be ordered even though some of the instructions are not technically correct.. But we are sure that the rule has no application here, since we do. not think the instructions “X” and “Y” cured the error in No. 1, and we are sure none of the instructions given even suggested to the jury the affirmative defense presented by defendant.
Since another trial will be necessary, we do not now pass upon the question of whether or not the verdict is excessive. For the reasons indicated, the judgment is reversed and the cause remanded for another trial consistent herewith.