437 Mass. 430 | Mass. | 2002
At issue in this appeal is the validity of several takings of land in the Surfside area on the southern coast of Nantucket. The county commissioners of Nantucket County
We must decide whether the takings exceeded the proper scope of the commissioners’ power under G. L. c. 82. In so doing, we need not decide whether land taken in order to connect an existing public way to the ocean may qualify as a taking under G. L. c. 82, for in this case the commissioners expressly disavowed any intention to build (or even improve) any roadway. Indeed a good part of the taken land lies on beach sand at the edge of the surf. We face a narrower issue: whether land may be taken under G. L. c. 82 in effect to acquire beach areas for public use, and to prevent the owners of the land contiguous to that beach from inhibiting the public from traversing their land, where the taking authority has expressly disavowed any intention of building a highway. It may not. Accordingly, we reverse the judgment of the Superior Court dismissing the complaint and vacate the takings ordered by the commissioners.
1. Citizens’ petition and public hearings. On September 21, 1998, sixteen citizens of Nantucket submitted a petition to the commissioners, asking that they lay out for highway purposes and acquire by eminent domain the fee simple title to certain land in the Surfside area of the island. G. L. c. 82, § 2.
Between the first and second hearings, the commissioners revised the proposed takings plan to exclude the land that is now submerged under water. See Marblehead v. County Comm’rs of Essex, 5 Gray 451, 452 (1855) (commissioners have no authority to lay out highways over navigable waters or on land below high water mark). At the second hearing, proponents of the measure read into the record a letter to the commissioners from the Nantucket planning and economic development commission (NPDC) concerning the proposed takings, in which it gave “its strong support for the efforts ... to acquire rights of way to shoreline access in the Surfside area.” The proposed takings, it continued, were consistent with the NPDC’s identification of such rights of way “as among the highest open space acquisition priorities,” and furthered its “goal of acquiring twenty five percent of the shoreline by the year 2025.” In opposition, the affected landowners questioned the lack of conservation plans for the taken land and the legality of the takings under G. L. c. 82.
After the vote, a Nantucket resident placed an article on the Nantucket town meeting warrant “to repeal, amend, or veto” the takings, or, in the alternative, to “enact takings in the Surf-side area pursuant to a beach access management plan to be formulated in conjunction with Surfside residents and Massachusetts Coastal Zone Management.” The article failed to achieve a two-thirds majority vote needed to pass. See § 2.8(d) of the Nantucket County Charter, St. 1996, c. 290, § 4.
2. The takings. The taken land comprises fourteen forty-foot wide strips of land ranging in length from roughly 250 to 2,200 feet, and lies within a relatively unpopulated one half-mile area of beach and beach front property, one-half mile east of the existing beach. Twelve strips run perpendicular to the ocean at approximately 200-foot intervals. Of these, eleven are laid out partly on beach sand, terminating in the surf. Two of the proposed strips (Nobadeer and Weweeder) parallel the shoreline; one (Nonantum) lies entirely on the sand. The plaintiffs claim,
3. Court proceedings. The plaintiffs sought relief in the nature of certiorari in the Supreme Judicial Court for the county of Suffolk. See G. L. c. 249, § 4. They requested an injunction barring the commissioners from recording or registering any order of taking in accordance with their vote of January 26, 2000, a declaration that the commissioners’ action was not a o valid exercise of authority under G. L. c. 82, and a judgment quashing that action. A single justice transferred the case to the Superior Court, where the parties filed the administrative record of the proceedings before the commissioners. See Superior Court Standing Order 1-96(2). The plaintiffs moved for judgment on the pleadings, which the judge denied after a hearing, dismissing the complaint. We granted the plaintiffs’ application for direct appellate review.
4. Standard of review. The standard of review in a certiorari case may vary according to the nature of the action for which review is sought. See Levy v. Acting Governor, 436 Mass. 736, 745-746 (2002); McSweeney v. Town Manager of Lexington, 379 Mass. 794, 800 (1980). Commissioners have long exercised broad discretion in determining whether a new highway is warranted. See Monterey v. County Comm’rs of Berkshire, 7 Cush. 394, 402 (1851). Certiorari review of such discretionary action is generally not available except to determine whether the action was arbitrary and capricious. See, e.g., Emerson College v. Boston, 391 Mass. 415, 422 n.14 (1984); School Comm. of Hatfield v. Board of Educ., 372 Mass. 513, 517 (1977); First Church of Christ, Scientist v. Alcoholic Beverages Control Comm’n, 349 Mass. 273, 275 (1965). In the context of the plaintiffs’ claim, this is saying no more than that we examine the commissioners’ actions to determine whether they have acted for reasons extraneous to G. L. c. 82. See Fafard v. Conservation Comm’n of Reading, 41 Mass. App. Ct. 565, 567-568 (1996) (applying arbitrary and capricious standard of review).
We interpret a statute “according to the intent of the Legislature ascertained from all its words construed by the ordinary and approved usage of the language ... to the end that the purpose of its framers may be effectuated.” Hanlon v. Rollins, 286 Mass. 444, 447 (1934). Accord Boston Police Patrolmen’s Ass’n v. Boston, 435 Mass. 718, 719-720 (2002). In this case the statutory language is not conclusive, but we may glean some insight from the statute’s various provisions. We also turn to extrinsic sources, including the legislative history and other statutes, for assistance in our interpretation. See EMC Corp. v. Commissioner of Revenue, 433 Mass. 568, 570-571 & nn.6-8 (2001) (other statutes); Barclay v. DeVeau, 384 Mass. 676, 680 (1981) (legislative history).
General Laws c. 82, § 1, grants county commissioners the authority to “lay out, alter, relocate and discontinue highways and order specific repairs thereon.” To this end, the commissioners are empowered to take by eminent domain the land “necessary” to exercise that authority, id. at § 7, and may do so where they determine that the “new highway ... or the alteration, specific repair or discontinuance of an existing highway” “is required by the common convenience and necessity.” Id. at §§ 2,4. The determination that the “highway” is “required by the common convenience and necessity” is
A term appearing in different portions of a statute is to be given one consistent meaning. Arnold v. Commissioner of Corps. & Taxation, 327 Mass. 694, 700 (1951). The phrase “common convenience and necessity" appears three times in G. L. c. 82. In the first two instances, it is the yardstick by which to determine whether a new highway, alteration, or repair is “required.” G. L. c. 82, §§ 2,4. Section 32A, the third reference, provides additional context suggesting the manner in which such a requirement arises. That provision, governing the abandonment of municipal ways by city or town officers, states that the officers:
“upon finding that a city or town way or public way has become abandoned and unused for ordinary travel and that the common convenience and necessity no longer require said town way or public way to be maintained in a condition reasonably safe and convenient for travel, shall declare that the city or town shall no longer be bound to keep such way or public way in repair” (emphasis added).
G. L. c. 82, § 32A. Here, the lodestar of “common convenience and necessity” is the need for public ways maintained in a state “reasonably safe and convenient for travel.” Seeing nothing in §§ 2 or 4 to suggest a different meaning, we conclude that the inquiry into “common convenience and necessity” is to focus on whether the petitioned-for new highway, alteration, or repair is “required” to facilitate “reasonably safe and convenient. . . travel.”
In furtherance of safe and convenient travel, G. L. c. 82 contemplates that roadways will be constructed, altered, or repaired. Actions authorized by the statute include the laying out of a “new highway,” and the alteration, relocation, or specific repair of an existing one. G. L. c. 82, §§ 1, 2, 3, 8, 10. Inherent in each of these is the physical alteration or construc
Nine sections of c. 82 refer to the construction of roadways. G. L. c. 82, §§ 8, 9, 11 A, 12, 14, 24, 25, 35, 38. For example, Section 11A permits the commissioners to enter private lands to make inspections “for the layout and construction of highways.” Section 38 authorizes the purchase of land “from which may be taken materials necessary for the construction, repair or improvement of public ways.” Section 12 permits the commissioners to allocate the “cost of construction” among the county or towns where the “highway” is located.
Other sections speak of the work to be performed. The commissioners must, “in their return. . . determine and specify the manner in which a new highway shall be laid out. . . and [must] specify in sufficient detail the work required so that the same may be completed in accordance with [their] directions, and the time within which it shall be completed.” G. L. c. 82, § 8. They must “examine the work. . . during its progress to ascertain that it is well done.” Id. On default of the “city or town whose duty it is to make such highway,” the commissioners are authorized to complete it themselves. G. L. c. 82, § 14. See Marcus v. County Comm’rs of Norfolk, 344 Mass. 749, 750 (1962) (within commissioners’ discretion to construct highways on failure of obligated town or city). Last, payment obligations for work done and damages incurred in the construction of the highway do not arise until the highway is “finally laid out” and “completed, in whole or in part.” G. L. c. 82, §§ 12, 16.
Read as a whole, it is plain that G. L. c. 82 authorizes takings for a new highway only where the construction or physical improvement of a highway necessary for travel is contemplated. The commissioners’ argument that under G. L. c. 82, “[p]avement is simply not required,” misses the mark. What the statute contemplates is that land will be taken for the purpose of constructing highways. The manner of that construction is in the discretion of the commissioners, as informed (in cases of public objection to the takings) by a public hearing regarding “the manner in which the proposed improvement shall be carried out.” G. L. c. 82, § 5. The mere taking of the land in its natural state, intending nothing more than to secure, in effect, a
The legislative history of G. L. c. 82 lends further support to our reading of the law. See Barclay v. DeVeau, supra at 680. Few statutes in our Commonwealth can claim as extensive a heritage. The roots of G. L. c. 82 reach back in an unbroken line spanning over 360 years. At its genesis, as today, the statute’s purpose is evident: to facilitate safe and convenient travel through the construction of roadways where these are necessary. The original statute, enacted in 1639, reflects this: “To the end there may be convenient High-wayes for Travellers ... all Country Highwayes shall be such as may be most easie and safe for Travellers” (emphasis in original). General Laws of Massachusetts Colony, at 64 (1672), reprinted in Colonial Laws of Massachusetts 1672-1686 (1887). In “Common grounds, or where the Soyle is wet, myrie or very rocky,” ways were to be laid out “the wider,” indicating the statute’s focus on safe and convenient travel. Id. Thus the Colony Laws. of 1647 ensured clear roads by requiring the removal of any “incumbrance” on highways as “determined for ease and conveniency of Travellers.” Id. at 65.
In the Province Laws of 1693, the highway statute took a more comprehensive form. St. 1693-1694, c. 23. The preamble restated the law’s purpose: “For the better amending and keeping in repair and clear the highways and common roads, leading from town to town, and place to place.” Id. Highways were, for the first time, to be laid out only if “judged to be of common necessity or conveniency,” and the work was to be done “with most conveniency to the publick.” Id. at § 2. All roads were to be “kept in repair,” with failure occasioning liability for resulting injuries. Id. at §§ 1, 4.
In 1825, the General Court repealed all prior highway statutes and enacted a new, but similar, law. St. 1825, c. 171, § 7. Its focus on the making of highways was manifest. The commissioners, imbued with the power “to order and determine upon the making, altering, turning or discontinuing” of highways, id.
Subsequent statutes carried forward the provisions of the 1825 statute with minor revisions.
More plausible statutory avenues are available to the commissioners to secure public access to the beach and ocean. See Commonwealth v. Welosky, 276 Mass. 398, 401-406 (1931), cert. denied, 284 U.S. 684 (1932) (looking to other statutes to guide interpretation). Accord EMC Corp. v. Commissioner of Revenue, 433 Mass. 568, 570-571 (2001). General Laws c. 34,
“The commissioners may . . . acquire by eminent domain. . . the fee or other lesser interest in such real property within their respective counties as may be necessary to maintain, improve, protect, limit the future use of or otherwise conserve and properly utilize open spaces, and may control and manage the same.”
G. L. c. 34, § 25. Securing access to an open public space like a beach
If G. L. c. 34, § 25, offers a more plausible basis for the takings, why did the commissioners choose to proceed under G. L.
Having determined the permissible range of bases for action under G. L. c. 82, we last consider whether the commissioners’ actions were authorized by the statute. The commissioners rely in their brief primarily on the fact that the ways “consist either of connections to existing public ways or are newly established public ways preserving historic rights of way connecting one portion of the island to another.” The commissioners have specifically disavowed any intent to build roadways on the land taken. Indeed, the very layout of the takings — including twelve purported “highways” into the surf, laid out at 200-foot intervals on one-half mile of beach sand — belies any suggestion that the land might have been intended for that purpose. In the absence of such an intent, the stated goals of preserving “historic rights of way” and connecting on paper “existing public ways” do not bring the takings within the scope of G. L.
The judgment is reversed, and the takings orders enacted under the authority of G. L. c. 82, § 7, are hereby vacated.
So ordered.
The commissioners may be petitioned to exercise their powers “[i]f common convenience and necessity require a new highway from town to town or from place to place within the same town, or the alteration, specific repair or discontinuance of an existing highway.” G. L. c. 82, § 2.
The commissioners “shall hear the parties [and] determine whether [the highway petitioned for] is required by the common convenience and necessity.” G. L. c. 82, § 4. On an affirmative finding, assuming no interested person objects, the commissioners may “lay out, order specific repairs upon or alter such highway without further notice.” G. L. c. 82, § 5. An objection by an interested person necessitates a second hearing “at which any party interested may be heard with respect to the manner in which the proposed improvement shall be carried out.” Id.
One other section speaks specifically in terms of travel. The commissioners are empowered, “[a]t the time of ordering specific repairs upon a highway, [to] direct it to be closed for public travel for a reasonable time.” G. L. c. 82, § 10.
liability for injuries caused by defects in public ways is now covered by G. L. c. 84. See, e.g., Hawkes v. Metropolitan Transit Auth., 328 Mass. 140 (1951).
Two amendments that do not survive in the current statute highlight that the law contemplates the construction of roadways in furtherance of its purpose. An 1842 amendment prevented the payment of damages to the landowner from whom land was taken “until the land. . . shall have been entered upon, and possession taken for the purpose of constructing said highway or alteration.” St. 1842, c. 86, § 1. A similar amendment in 1892 required applications for the revision of the judgment in the assessment of damages be brought within “one year, to be reckoned, in the case of the taking of land, from the day when the highway is entered upon and possession taken for the purpose of constructing the same, in the case of specific repairs, from the day when the work is actually commenced.” St. 1892, c. 415, § 1. Takings procedures such as these have since been consolidated in G. L. c. 79. See G.L. c. 82, § 7. See also St. 1918, c. 257, §§ 187,208; Walker v. Medford, 272 Mass. 161, 163-164 (1930).
Although “open spaces” is not expressly defined in G. L. c. 34, § 25, it would include space on a public beach. General Laws c. 12, § 11D, for example, includes “open spaces” in a noninclusive list of land that may be subject to “damage to the environment”: “seashores, dunes, marine resources, underwater archaeological resources, wetlands, open spaces, natural areas, parks or historic districts or sites.” See Boston Ass’n of Sch. Adm’rs & Supervisors v. Boston Retirement Bd., 383 Mass. 336, 341 (1981) (generic phrase takes its color of meaning from more specific words in a list). Cf. Arnold v. Commissioner of Corps. & Taxation, 327 Mass. 694, 700 (1951) (term appearing in different portions of statute to he given one consistent meaning).
General Laws c. 40, § 14, offers another plausible basis for the commissioners to act. The selectmen of a town (who in Nantucket are also the county commissioners, G. L. c. 34, § 4) may “take by eminent domain under chapter seventy-nine, any land, easement or right therein within the city or town not already appropriated to public use, for any municipal purpose for which the purchase or taking of land, easement or right therein is not otherwise authorized or directed by statute [provided that] the taking or purchase. . . has previously been authorized... by vote of the town.” G. L. c. 40, § 14. See, e.g., Walker v. Medford, 272 Mass. 161, 163 (1930) (taking for street is
General Laws c. 40, § 8C, also provides that a city or town, after establishing a “conservation commission,” may, “upon the written request of the commission, take by eminent domain under chapter seventy-nine, the fee or any lesser interest in any land or waters located in such city or town,” as is “necessary to acquire, maintain, improve, protect, limit the future use of or otherwise conserve and properly utilize open spaces in land and water areas within [the commission’s] city or town.” The record does not reflect whether there exists a conservation commission in Nantucket.