CENTER FOR BIOLOGICAL DIVERSITY et al., Plaintiffs and Appellants, v. COUNTY OF SAN BERNARDINO et al., Defendants and Respondents; CADIZ, INC., et al., Real Parties in Interest and Respondents.
No. G051058
Fourth Dist., Div. Three
May 10, 2016
247 Cal. App. 4th 326
Aruna M. Prabhala, Adam F. Keats, Chelsea Tu; Center for Food Safety and Adam F. Keats for Plaintiffs and Appellants Center for Biological Diversity, San Bernardino Valley Audubon Society and Sierra Club, San Gorgonio Chapter.
University of California, Irvine School of Law Environmental Law Clinic, and Michael Robinson-Dorn for Plaintiff and Appellant National Parks Conservation Association.
Downey Brand, Christian L. Marsh, Kevin M. O‘Brien and Rebecca R.A. Smith for Defendants and Respondents County of San Bernardino and Board of Supervisors of County of San Bernardino.
Alston & Bird, Edward J. Casey and Andrew Brady for The Association of California Water Agencies as Amicus Curiae on behalf of Defendants and Respondents.
Remy Moose Manley, James G. Moose, Sabrina V. Teller and Gwynne B. Hunter for California State Association of Counties and California Association of Sanitation Agencies as Amici Curiae on behalf of Defendants and Respondents.
Brownstein Hyatt Farber Schreck, Diane C. De Felice, Amy M. Steinfeld; Woodruff, Spradlin & Smart and M. Lois Bobak for Real Parties in Interest and Respondents Cadiz, Inc., and Fenner Valley Mutual Water Company.
Cox, Castle & Nicholson, Michael H. Zischke and Andrew B. Sabey for California Building Industry Association, Building Industry Legal Defense Foundation, Building Industry Association of the Bay Area, California Business Properties Association, California Chamber of Commerce and Southern California District Council of Laborers as Amici Curiae on behalf of Defendants and Respondents and Real Parties in Interest and Respondents.
OPINION
FYBEL, J.—
INTRODUCTION
A proposed project to pump fresh groundwater from an underground aquifer located below real property owned by Cadiz, Inc. (Cadiz), in the Mojave Desert (the Project) spawned six related cases. The Project is a public/private partnership, the purposes of which are to prevent waste of the water in the aquifer, and to ultimately transport the water to customers in Los Angeles, Orange, Riverside, San Bernardino, and Ventura Counties.
In this case, the Center for Biological Diversity, San Bernardino Valley Audubon Society, and Sierra Club, San Gorgonio Chapter (collectively, CBD), and the National Parks Conservation Association (National Parks) filed a petition for a writ of mandate in the trial court, challenging the approval of the Project under the California Environmental Quality Act
First, Appellants contend that Santa Margarita was improperly designated as the lead agency for the Project, and that this error so tainted the environmental review process that such designation requires preparation of a new environmental impact report (EIR). We disagree. Santa Margarita was properly designated as the lead agency because it is jointly carrying out the Project with the property owner, Cadiz, and because it is the agency with the principal authority for approving and supervising the Project as a whole. Because we find no error in the designation of Santa Margarita as the lead agency, we need not address the issue of prejudice.
Second, Appellants argue that the EIR‘s project description was inaccurate and misleading because the Project was described as a means of conserving water, but will not save from evaporation an amount of water equal to the amount being pumped from the aquifer over the life of the Project. We conclude that the Project is consistent with the EIR‘s purpose and objectives because it will conserve water otherwise lost to brine and evaporation, and will improve water supplies throughout many areas of the State of California.
Third, Appellants argue that the EIR is misleading because it does not provide an accurate duration for pumping by the Project. We disagree. The EIR sets a definite length of time during which pumping under the Project may occur. The additional time permitted for pumping if contingencies require that the pumping be extended do not alter the total amount of water that may be withdrawn. Although the EIR and other documents included as part of the environmental review contemplate that the parties might wish to extend the pumping for an additional term of years after the stated completion date of the Project, any further term is not reasonably foreseeable at this time. Indeed, the EIR specifically provides that any extensions of the Project term would require further, separate environmental review.
Fourth and finally, Appellants contend that the Project will pump more water from the aquifer than is contemplated by and discussed in the EIR. Having reviewed the EIR and related documents, we conclude that they do not permit withdrawal of water in excess of the amounts specified in the EIR, so there is nothing inaccurate or misleading about the Project description.
STATEMENT OF FACTS AND PROCEDURAL HISTORY
Cadiz owns land in the County, which overlies the Cadiz Valley and Fenner Valley aquifer system in the Mojave Desert. The aquifer is estimated to hold 17 to 34 million acre-feet of fresh groundwater. Currently, this groundwater flows downward to dry lakes, where it mixes with highly salinated groundwater before evaporating. Once the groundwater reaches the dry lakes, it becomes unusable as fresh water. The stated “fundamental” purpose of the Project is to save “substantial quantities of groundwater” that are being lost to evaporation and excess salinity.
The Project would have two distinct but related components: (1) groundwater conservation and recovery and (2) imported water storage. In the first part of the Project (phase 1), approximately 34 new wells will be constructed on Cadiz‘s land to extract an average of 50,000 acre-feet of groundwater from the aquifer every year for 50 years; as many as 75,000 acre-feet of groundwater may be extracted in any given year.2 Cadiz must pump the groundwater “in accordance with agreements with Cadiz Inc. and the Cadiz Groundwater Management, Monitoring and Mitigation Plan (GMMMP).”
The water will be transported via a 43-mile underground water conveyance pipeline to the Colorado River Aqueduct; the aqueduct will then transport the water to the Project participants, including Santa Margarita. Twenty percent of the Project‘s groundwater yield will be reserved for users in the County; the remaining 80 percent will be delivered to other water providers with whom Cadiz has contracted.
The Project participants will use the water from the Project for their customers located in Los Angeles, Orange, Riverside, San Bernardino, and Ventura Counties. The Project will be managed and operated by a private, nonprofit entity, Fenner Valley Mutual Water Company (Fenner Valley), formed by Cadiz.
In the second part of the Project (phase 2), the Project participants will be able to send any surplus surface water supplies back to the Project site, to be held in storage in spreading basins until they are needed. Phase 2 is not
Santa Margarita posted a notice of preparation of a draft EIR for the Project in March 2011. In June 2011, the County and Santa Margarita executed a memorandum of understanding that provided that Santa Margarita would act as the lead agency, and the County would act as a responsible agency (the 2011 Memorandum). In December 2011, Santa Margarita released the draft EIR for public review and comment.
Santa Margarita, the County, Cadiz, and Fenner Valley executed a memorandum of understanding in 2012 (the 2012 Memorandum), under the terms of which the signing parties agreed that a groundwater management, monitoring, and mitigation plan would be developed in connection with the finalization of the draft EIR, which would “govern the operation and management of the Project by [Fenner Valley] during the operational phase of the Project, the currently anticipated term of which is 50 years.” In the 2012 Memorandum, the parties agreed that “compliance by [Santa Margarita], [Fenner Valley], and Cadiz with the provisions of th[e 2012 Memorandum] and the [plan] will satisfy the requirements for an exclusion from the permitting requirements” of the County‘s Desert Groundwater Management Ordinance (County Ord. No. 3872, adding art. 5, § 33.06551 et seq., Desert Groundwater Management, to County Code, tit. 3, div. 3, ch. 6) (the Ordinance). The 2012 Memorandum provided that the Project could not proceed unless the parties finalized the groundwater management, monitoring, and mitigation plan (the Plan) based on information provided during the process of finalizing the draft EIR.
On July 31, 2012, Santa Margarita certified the final EIR and approved an updated version of the Plan. A month later, Appellants filed a verified petition for a writ of mandate challenging the approval of the Project and the certification of the EIR. The petition was originally filed in the San Bernardino County Superior Court, but was transferred to the Orange County Superior Court by stipulated order, as two related cases were pending in Orange County. A bench trial was held, after which the trial court issued a detailed statement of decision outlining its findings of fact and conclusions of law. The court denied the petition with prejudice and entered judgment against Appellants. Appellants timely filed notices of appeal.
DISCUSSION
I.
CALIFORNIA WATER LAW
The California Constitution and the Water Code make clear that the policy of this state is to put water resources to reasonable and beneficial use. The Constitution provides: “It is hereby declared that because of the conditions prevailing in this State the general welfare requires that the water resources of the State be put to beneficial use to the fullest extent of which they are capable, and that the waste or unreasonable use or unreasonable method of use of water be prevented, and that the conservation of such waters is to be exercised with a view to the reasonable and beneficial use thereof in the interest of the people and for the public welfare.” (
The Water Code states, in relevant part:
—“It is hereby declared that the people of the State have a paramount interest in the use of all the water of the State and that the State shall determine what water of the State, surface and underground, can be converted to public use or controlled for public protection.” (
—“It is hereby declared that the protection of the public interest in the development of the water resources of the State is of vital concern to the people of the State and that the State shall determine in what way the water of the State, both surface and underground, should be developed for the greatest public benefit.” (
—“It is the policy of the state that groundwater resources be managed sustainably for long-term reliability and multiple economic, social, and environmental benefits for current and future beneficial uses. Sustainable groundwater management is best achieved locally through the development, implementation, and updating of plans and programs based on the best available science.” (
—The Legislature‘s stated intent in enacting the Sustainable Groundwater Management Act was “to do all of the following: [¶] (a) To provide for the
Groundwater belongs to the state, not any person or entity, but may be extracted by those with the right to do so, including those whose land overlies the groundwater source. “At least since 1928 when the predecessor to article X section 2 of the California Constitution was adopted, there is no private ownership of groundwater. [Citation.] The State of California owns all of the groundwater in California, not as a proprietary owner, but in a manner that empowers it to supervise and regulate water use. [Citation.] Water rights holders have the right to ‘take and use water,’ but they do not own the water and cannot waste it. [Citation.] ¶ A person obtains a right to extract groundwater by owning specific land, by appropriating water [citation], or by inheriting a pueblo right. [Citation.] Ownership of land appurtenant to groundwater engenders an ‘overlying right.’ [Citation.] Under the ‘correlative rights doctrine,’ ‘as between the owners of land overlying strata of percolating waters, the rights of each to the water are limited, in correlation with those of others, to his “reasonable use” thereof when the water is insufficient to meet the needs of all. [Citations.]’ [Citation.] An appropriative right is based on the taking of groundwater. [Citation.]” (Central and West Basin Water Replenishment Dist. v. Southern Cal. Water Co. (2003) 109 Cal.App.4th 891, 905-906.)
State agencies have consistently concluded that flexibility is necessary in managing groundwater supplies. “Groundwater management must be adapted to an area‘s political, institutional, legal, and technical constraints and opportunities. Groundwater management must be tailored to each basin or subbasin‘s conditions and needs. Even within a single basin, the management objectives may change as more is learned about managing the resource within that basin. Flexibility is the key, but that flexibility must operate within a framework that ensures public participation, monitoring, evaluation,
II.
CEQA STANDARDS AND STANDARD OF REVIEW
“CEQA is a comprehensive scheme designed to provide long-term protection to the environment.” (Mountain Lion Foundation v. Fish & Game Com. (1997) 16 Cal.4th 105, 112.) “Its purposes are manifold, but chief among them is that of providing public agencies and the general public with detailed information about the effects of a proposed project on the environment.” (San Franciscans for Reasonable Growth v. City and County of San Francisco (1984) 151 Cal.App.3d 61, 72.) Environmental protection is the guiding concept in interpreting CEQA. “The foremost principle under CEQA is that the Legislature intended the act ‘to be interpreted in such manner as to afford the fullest possible protection to the environment within the reasonable scope of the statutory language.‘” (Laurel Heights Improvement Assn. v. Regents of University of California (1988) 47 Cal.3d 376, 390 (Laurel Heights).)
“The EIR is the primary means of achieving the Legislature‘s considered declaration that it is the policy of this state to ‘take all action necessary to protect, rehabilitate, and enhance the environmental quality of the state.‘” (Laurel Heights, supra, 47 Cal.3d at p. 392.) The EIR is therefore the ” ‘heart of CEQA’ ” and an ” ‘environmental “alarm bell” whose purpose it is to alert the public and its responsible officials to environmental changes before they have reached ecological points of no return.’ ” (Ibid.) “The EIR is also intended ‘to demonstrate to an apprehensive citizenry that the agency has, in fact, analyzed and considered the ecological implications of its action.’ ” (Ibid.) Thus, the EIR is an accountability document and the EIR process “protects not only the environment but also informed self-government.” (Ibid.)
An EIR must identify the significant effects on the environment of a project, identify alternatives to the project, and indicate the manner in which those significant effects can be mitigated or avoided. (
“In reviewing a petition challenging the legality of a lead agency‘s actions under CEQA, our role is the same as the trial court‘s. We review the agency‘s actions, not the trial court‘s decision, and our inquiry extends ‘only to whether there was a prejudicial abuse of discretion’ on the part of the agency. [Citations.]” (Rialto Citizens for Responsible Growth v. City of Rialto (2012) 208 Cal.App.4th 899, 923; see Center for Biological Diversity v. Department of Fish & Wildlife (2015) 62 Cal.4th 204, 214–215.) “Abuse of discretion is established if the agency has not proceeded in a manner required by law or if the determination or decision is not supported by substantial evidence.” (
“Questions concerning the proper interpretation or application of the requirements of CEQA are matters of law. [Citation.] CEQA requires that an EIR include detailed information concerning, among other things, the significant environmental effects of the project under consideration. [Citations.] When the informational requirements of CEQA are not met but the agency nevertheless certifies the EIR as meeting them, the agency fails to proceed in a manner required by law and abuses its discretion. [Citation.] ’ “The EIR is the heart of CEQA,” and the integrity of the process is dependent on the adequacy of the EIR. [Citations.]’ [Citation.] ¶ In reviewing the lead agency‘s actions under CEQA, we do not ’ “pass upon the correctness of the EIR‘s environmental conclusions, but only upon its sufficiency as an informative document.” ’ [Citation.] We may not set aside an agency‘s approval of an EIR on the ground that an opposite conclusion would have been equally or more reasonable. ‘Our limited function is consistent with the principle that “[t]he purpose of CEQA is not to generate paper, but to compel government at all levels to make decisions with environmental consequences
III.
THE DESIGNATION OF SANTA MARGARITA AS THE LEAD AGENCY FOR THE PROJECT IS IN COMPLIANCE WITH CEQA.
In the 2011 Memorandum, Santa Margarita and the County agreed that Santa Margarita would serve as the lead agency for the Project, and the County would be a responsible agency. In its statement of decision, the trial court found: “[Santa Margarita] should not have been designated the lead agency for the Project. CEQA‘s underpinnings of accountability and stewardship support the conclusion that the County should have instead served as lead agency. The County was in the best position to objectively balance the benefits and risks of the project rather than the purchaser of the water, [Santa Margarita].” The court further found, however, that the error in designating Santa Margarita as the lead agency was not prejudicial: “[T]he Court is unable to conclude that the failure to designate the County as Lead Agency, without more, constitutes a CEQA violation where [Santa Margarita] may be considered to have a substantial claim to be the lead agency.” For the reasons we explain, and as summarized in part III.B. of the Discussion section, we conclude that the designation of Santa Margarita as the lead agency for the Project complied with CEQA.
A.
Relevant Legal Standards
Both Santa Margarita and the County are public agencies within the meaning of CEQA. ” ‘Public agency’ includes any state agency, board, or commission, any county, city and county, city, regional agency, public district, redevelopment agency, or other political subdivision.” (
All the parties to this action agree that in determining whether Santa Margarita was the appropriate lead agency for the Project, we must consider
B.
Summary of Holdings
Santa Margarita was correctly designated as the lead agency for the Project under
We hold that, under
We also hold that, under
C.
Under Guidelines Section 15051, Subdivisions (a) and (b), Santa Margarita Will Carry Out the Project and Has the Greatest Responsibility—Vis-à-vis the County—for Supervising or Approving the Project as a Whole.
1. Santa Margarita‘s Responsibilities
The final EIR provides sufficient evidentiary support for the designation of Santa Margarita as the lead agency based on its cooperative partnership with Cadiz in implementing, carrying out, supervising, and approving the Project as a whole. Among Santa Margarita‘s responsibilities with regard to the Project are the following:
—Obtaining financing for the costs involved in pumping and transporting water from the pumping site to the Colorado River Aqueduct for transfer to the Project participants;
—Approving the design and construction of the wells, pipelines, and conveyance facilities for the Project;
—Managing and overseeing the operation of the Project;
—Negotiating, reviewing, and approving the terms for the conveyance of water;
—Carrying out and supervising the Project as the managing member of Fenner Valley;
—Overseeing all actions of Fenner Valley, including, but not limited to, collecting payments received for the sale of water, complying with all regulatory requirements, and implementing the mitigation measures contained in the EIR and the corrective measures contained in the Plan;
—Controlling and operating the “Fenner Joint Powers Authority,” which will review and approve the Project designs and specifications, manage and oversee the operation of the Project facilities in coordination with Fenner Valley, and oversee compliance with the Plan;
—Holding an undivided interest in the Project facilities and an easement over the Project facilities which gives Santa Margarita the priority right to use the Project facilities to take its contracted share of water;
—Ensuring that Fenner Valley fully implements all regulatory permits and mitigation measures under the Plan;
—Providing staffing for the day-to-day operation and maintenance of the Project, as well as bookkeeping and administration through the joint powers authority;
—Using its discretion to determine if the Project has triggered a potential adverse impact or undesirable result, and determining whether corrective measures are necessary; and
—Serving as the contracting entity, through Fenner Valley, for storage participation in phase 2 of the Project.
2. Guidelines Section 15051, Subdivisions (a) and (b)
Accordingly, pursuant to
D.
Pursuant to Guidelines Section 15051, Subdivision (d), Santa Margarita and the County Properly Entered into the Agreement for Santa Margarita to Act as the Lead Agency.
We also hold Santa Margarita was properly designated as the lead agency for the Project under
The County does have general governmental powers, which would make the County an appropriate candidate for lead agency if the Project were solely being carried out by a nongovernmental entity or person. (
Appellants contend primarily that because the County must either approve or exempt the Project from the Ordinance before any pumping may occur, it has the greatest responsibility for approving and supervising the Project. This argument, however, myopically and improperly considers only the pumping portion of the Project. As explained in detail ante, the Project as
Other than its approval or exemption of the Project‘s water pumping wells, the County‘s primary supervisory responsibilities over the Project would be:
—Approval of the Plan following certification of the final EIR, and discretionary authority to determine whether the Plan conforms to the 2012 Memorandum and the Ordinance.
—Consideration of the final EIR as a responsible agency and the authority to require mitigation measures or alternatives as set forth in the final EIR.
—Reporting and monitoring responsibilities for the mitigation measures in the Plan, pursuant to Santa Margarita‘s delegation of that authority. (
—Decisionmaking authority if review and corrective actions are necessary to avoid undesirable results during the term of the Project, in concert with Santa Margarita.4
The Project involves a well field, piping system, 43-mile pipeline, monitoring features, and a fire suppression system, among other things. Although the County has a supervisory role over groundwater pumping under the Plan, Santa Margarita has broader approval and supervisory power over the Project as a whole, both directly and through its role as the “lead participant” in controlling Fenner Valley. That the County has some discretionary authority for carrying out or approving the Project does not mean it should have been designated as the lead agency rather than as a responsible agency. (
CBD suggests that the lead agency should be the agency that is in the best position to objectively balance the benefits and risks of the Project, in order to fulfill CEQA‘s underpinnings of accountability and stewardship.
CBD argues that the County and Santa Margarita could only enter an agreement for the latter to act as the lead agency, pursuant to
IV.
THE EIR‘S PROJECT DESCRIPTION WAS NEITHER INACCURATE NOR MISLEADING, AND DID NOT VIOLATE CEQA.
Appellants argue that the EIR contained “a misleading, legally deficient project description that is inaccurate, unstable, and not finite. In particular, the Project description fails to disclose and analyze likely extensions of the Project beyond the 50 year-term claimed by the EIR and the likely additional groundwater extractions beyond the claimed 50,000 [acre-feet per year] average. Reasonably foreseeable Project expansions regarding the duration
A.
The EIR‘s “Conservation” Objective Is Neither Inaccurate nor Misleading.
The Guidelines specify that the purpose and objective of a project must be included in an EIR. “The description of the project shall contain the following information but should not supply extensive detail beyond that needed for evaluation and review of the environmental impact. [¶] ... [¶] A statement of the objectives sought by the proposed project. A clearly written statement of objectives will help the lead agency develop a reasonable range of alternatives to evaluate in the EIR and will aid the decision makers in preparing findings or a statement of overriding considerations, if necessary. The statement of objectives should include the underlying purpose of the project.” (
The draft EIR identifies its purpose as follows: “The fundamental purpose of the Project is to save substantial quantities of groundwater that are presently wasted and lost to evaporation by natural processes.” The EIR also includes the following list of objectives: “The objectives for this Project are as follows: [¶] ... Maximize beneficial use of groundwater in the Bristol, Cadiz, and Fenner Valleys by conserving and using water that would otherwise be lost to brine and evaporation; [¶] ... Improve water supply reliability for Southern California water providers by developing a long term source of water that is not significantly affected by drought; [¶] ... Reduce dependence on imported water by utilizing a source of water that is not dependent upon surface water resources from the Colorado River or the Sacramento-San Joaquin Delta; [¶] ... Enhance dry-year water supply reliability within the service areas of [Santa Margarita] and other Southern California water provider Project Participants; [¶] ... Enhance water supply opportunities and delivery flexibility for [Santa Margarita] and other participating water providers through the provision of carry-over storage and, for Phase [2,] imported water storage; [¶] ... Support operational water needs of the Arizona and California Railroad (ARZC) in the Project area; [¶] ... Create additional water storage capacity in Southern California to enhance water supply reliability; [¶] ... Locate, design, and operate the Project in a manner that minimizes significant environmental effects and provides for long-term sustainable operations.”
CBD argues that the EIR‘s assertions regarding the savings of water that would evaporate are not substantiated because they are “based on unjustified and conflicting evaporation rates of the basin.” Studies included in the final EIR, however, provide substantial evidentiary support for the evaporation rates that form the basis of the Project objectives and the EIR.
CBD also argues that Santa Margarita misrepresented the amount of water that would be saved from evaporation by showing the savings over a 100-year period, rather than the 50-year period in which water will be extracted. The EIR explains how more water must be extracted in the earlier years of the Project in order to establish a “cone of depression” that will ultimately result in no water from the groundwater basin being lost by draining into the dry lakes. Therefore, to express the total amount of water that will be recaptured from excess salinity or evaporation, it is appropriate to consider the savings in the period after the initial 50-year period, after which the evaporation rates will continue to be lower, unless and until the natural recharge causes the groundwater basin to reach an amount above the cone of depression, allowing the water to again flow into the dry lakes.
In the absence of the Project, the water recharge will simply flow downgradient from the groundwater basin, become hypersalinic, and eventually be lost to evaporation. Pumping the water out of the basin to a sufficient level means that the water will no longer flow downgradient. This explains why the reduction in evaporation losses in the earliest years would be lower than those in later years.
CBD is correct in noting that the amount of water saved from evaporation is a percentage of the total water removed from the aquifer by the Project. This does not, however, make the objectives misleading or inaccurate. Under the worst case scenario set forth in the EIR, with the lowest rate of natural recharge of the aquifer, the Project would extract significantly more water
We therefore reject CBD‘s contention that the EIR‘s objective was inaccurate or misleading.
B.
The EIR‘s Description Regarding the Total Duration of the Project Is Stable and Finite, and Is Not Misleading.
CBD argues that the EIR‘s description regarding the total duration of the Project is unstable, not finite, and misleading. Although the EIR analyzes the environmental impacts of pumping water from the aquifer for 50 years, CBD contends that there are several circumstances under which the Project will continue beyond 50 years.
First, the EIR states that the imported water storage component of the Project will be limited to the same 50-year period as the conservation and recovery component. CBD contends that the EIR also states that phase 2 will be implemented after the completion of phase 1. In fact, the EIR states only that phase 2 will begin after phase 1 has become operational, not that phase 2 will begin after phase 1 has been working for 50 years. The EIR states: “[T]he Imported Water component is proposed to be implemented after the Conservation and Recovery Project. Therefore, the Imported Water Storage Component would not adversely affect groundwater supplies or impede naturally occurring groundwater recharge. Therefore, there would be no impact.” The purpose of implementing phase 1 before phase 2 is to ensure that when water is added to recharge the aquifer, the cone of depression will already exist, ensuring that the water added for recharge will not flow downward and be lost to hypersalinity and evaporation.
Second, CBD contends that the term of the Project is unclear. Although the EIR specifies that the term of the Project is 50 years, it also provides: “In the event that circumstances beyond the control of the Project operator required additional time to complete contracted water deliveries, the Project term may be extended for a limited time under the terms of the agreements.” The final EIR and the option agreement provide that the 50-year term of phase 1 of the Project may be extended in order to complete contracted-for water deliveries. A short extension of time to fulfill the water delivery contracts does not violate CEQA, and does not make the term of the Project infinite. The EIR specifies that pumping water as part of the Project is limited to the average of 50,000 acre-feet per year for 50 years. In the event that weather conditions or
The relevant documents also provide that the Project participants may agree to an additional term beyond the 50-year term currently specified. If an additional term is agreed to, new agreements and a new environmental analysis would be required, including the development of a new groundwater management, monitoring, and mitigation plan.
CBD argues that the EIR is flawed because the Project could be indefinitely expanded. “[A]n EIR must include an analysis of the environmental effects of future expansion or other action if: (1) it is a reasonably foreseeable consequence of the initial project; and (2) the future expansion or action will be significant in that it will likely change the scope or nature of the initial project or its environmental effects. Absent these two circumstances, the future expansion need not be considered in the EIR for the proposed project. Of course, if the future action is not considered at that time, it will have to be discussed in a subsequent EIR before the future action can be approved under CEQA. [¶] This standard is consistent with the principle that ‘environmental considerations do not become submerged by chopping a large project into many little ones—each with a minimal potential impact on the environment—which cumulatively may have disastrous consequences.’ [Citation.] The standard also gives due deference to the fact that premature environmental analysis may be meaningless and financially wasteful. Under this standard, the facts of each case will determine whether and to what extent an EIR must analyze future expansion or other action.” (Laurel Heights, supra, 47 Cal.3d at p. 396.)
For the Project to be extended beyond its 50-year term, the parties would, 50 years from the date the Project begins pumping, have to agree to extend the pumping for a further 30 years, and then pursue a new environmental analysis. Under the circumstances of the Project, we find the possibility of an extension of the term of the Project to be far too speculative to require environmental analysis at this point.
The EIR does not need to address a future action “that is merely contemplated or a gleam in a planner‘s eye.” (Laurel Heights, supra, 47 Cal.3d at p. 398.) City of Santee v. County of San Diego (1989) 214 Cal.App.3d 1438, cited by CBD, does not require a different result. In that case, the EIR for a temporary expansion of a detention facility was determined to be inadequate “because: (1) it fails to accurately describe the project and discuss the anticipated future uses of the ‘temporary’ project and the environmental effects of those uses, and (2) the discussion of the alternatives is inadequate under CEQA.” (Id. at pp. 1440–1441.) The project at issue was
C.
The EIR‘s Descriptions of the Rate and Total Quantity of Groundwater Withdrawal Are Stable and Finite, and Are Not Misleading.
CBD also challenges the EIR based on claimed inaccuracies in the descriptions of the total quantity of groundwater that may be withdrawn from the aquifer, and of the rate at which the water will be withdrawn. The Project‘s EIR permits a total of 2.5 million acre-feet of groundwater to be withdrawn, at an average rate of 50,000 acre-feet per year over 50 years. The actual amount withdrawn during a given year may be as much as 75,000 acre-feet.
The 2012 Memorandum provides that 20 percent of the total annual yield from the Project shall be reserved for the benefit of the County‘s water users, and that 25,000 acre-feet of groundwater shall be reserved for the County. These amounts are not included in exhibit A to the water purchase and sale agreement, entered into among Cadiz, Fenner Valley, and Santa Margarita.6 However, Santa Margarita cites to the water purchase and sale agreement,
CBD also argues that average annual groundwater withdrawal in excess of 50,000 acre-feet is reasonably foreseeable and indeed anticipated for two reasons. First, the conveyance pipeline to be used as part of the Project has a maximum capacity of 105,000 acre-feet. CBD does not acknowledge that the 105,000 acre-feet capacity is only reached when two pipelines are in use. The capacity of the phase 1 pipeline is 75,000 acre-feet annually, which is consistent with the maximum amount of groundwater that may be extracted in any given year. If phase 2 of the Project were to be undertaken, a natural gas pipeline could be converted, which would provide an additional 30,000 acre-feet per year capacity, so that water could be sent back to the Project site to be stored.
Second, CBD notes that the option agreement, the 2012 Memorandum, and the water purchase and sale agreement do not place any limits on the amount of groundwater extracted. CBD fails to note, however, that the Plan, which was referenced in the 2012 Memorandum and the water purchase and sale agreement, specifically states the average and maximum annual withdrawal rates of 50,000 acre-feet and 75,000 acre-feet, respectively.
DISPOSITION
The judgment is affirmed. Respondents to recover costs on appeal.
Aronson, Acting P. J., and Ikola, J., concurred.
On May 18, 2016, the opinion was modified to read as printed above.
Notes
| Project Participant | Project Allotment (acre-feet per year) |
| Santa Margarita Water District | 15,000 |
| Three Valleys Municipal Water District | 5,000 |
| Golden State Water Company | 5,000 |
| Suburban Water Systems | 5,000 |
| Jurupa Community Services District | 5,000 |
| Arizona California Railroad | 100 |
| California Water Service Company | 5,000 |
| Total Project Allotment Subscribed | 40,100 |
| Project Allotment Available | 9,900 |
| Total Annual Project Allotment | 50,000 |