MEMORANDUM AND ORDER ON CROSS-MOTIONS FOR SUMMARY JUDGMENT ,
Before the court are cross-motions for summary judgment filed by Célico Partnership d/b/a Verizon Wireless (“Célico”) and the Town of Grafton (“the Town”).
Célico alleges in its complaint that the Grafton Planning Board (the “Board”) wrongfully denied its application for a special permit to place a wireless telecommu *73 nications facility at 27 Upton Street, in Grafton, Massachusetts (the “Upton Street Property”). The defendants are the Town; the Board; and Robert Hassinger, Robert Mitchell, Keith Regan, Martin Temple and Stephen Dunne, as they are members of the Board. In counts I and II, Célico claims that the Board’s denial of the special permit amounted to an effective prohibition of personal wireless services, in violation of the Telecommunications Act of 1996 (“TCA”), 47 U.S.C.A. § 332(c)(7)(B)(i)(II), and was not supported by substantial evidence also in violation of the TCA at 47 U.S.C.A. § 332(c) (7) (B) (iii).
Célico also claims, in count III, that the Board’s denial of the specific permit constituted a deprivation of rights secured by federal law, and that a cause of action for money damages exists under 42 U.S.C. § 1983. In count IV, Célico claims that the Board’s refusal to waive or modify certain zoning requirements lacked a rational relationship to a legitimate government interest and thus violated Cellco’s substantive due process rights secured by the Fifth and Fourteenth Amendments to the U;S. Constitution, and Part I, Article X of the Massachusetts Declaration Rights. Finally, in count V, Célico claims that the Board’s denial of the special permit was arbitrary and capricious, not based upon the evidence, and in excess of the Board’s authority under both Mass. Gen. L. c. 40A and the Grafton Zoning By-Law (the “ZBL”).
Both sides have moved for summary judgment on all counts. For the reasons stated below, I GRANT the Town’s motion for summary judgment on all counts and DENY Cellco’s corresponding motion.
I. FACTS
A. Background
Unless otherwise noted, the following facts are undisputed.
Célico, a personal wireless service provider, is licensed by the Federal Communications Commission to provide cellular telephone services to a geographic area that includes the Town of Grafton, Massachusetts. Cellular telephones work by transmitting a low power signal between a mobile telephone and a wireless telecommunications facility, or “cell site.” A cell site consists of antennae mounted on a tall structure such as a tower or building. As a caller moves out of the coverage range of one cell, the signal is “handed off’ from the cell site in one cell to the cell site of an adjacent cell. For there to be continuous service, it is critical that the facilities within each cell be located in accordance with radio frequency (“RF”) principles, taking into account overall network design. RF design must accommodate such features as the height of the proposed antennae, topographical concerns, the geographic distance and direction of the proposed facility to other facilities in the network, and customer demands for service.
There is currently a “coverage gap” in certain areas of Grafton, including the center of thé' Town (“Grafton Center”). The existence of a coverage gap means that there is currently not enough signal strength to allow Célico customers reliably to initiate or hold calls when located within or traveling through these areas of Grafton. Using the RF principles described above, Cellco’s RF engineers determined that a facility located within Grafton Center would remedy the coverage gap.
The Board of Selectmen of the Town (the “Selectmen”) issued a “request for proposal” (“RFP”) for the construction of a telecommunications facility on a portion of the Upton Street Property. After submitting a bid on the RFP, Célico was awarded a contract, and, on August 27, 2001, entered into a lease with the Town, acting through the Selectmen, for the construction of a wireless telecommunications fácil *74 ity on the Upon Street property. Paragraph ten of the lease states:
It is understood and agreed that LESSEE’S ability to use the Premises as contemplated by this Agreement is contingent upon obtaining all of the certificates, permits and other approvals required by any federal, state and local authorities. Notwithstanding the above, LESSEE must apply for and receive a Special Permit from the Planning Board, and nothing in this lease shall be construed as warranty that LESSEE shal [stet] receive any required Special permit from the Planning Board, or required permit from the Building Inspector.
The Upton Street Property is located in a Low Density Residential (R40) zoning district, and is approximately one-quarter mile from the Grafton Common Historic District. It is owned by the Town and is currently used by the Grafton Department of Public Works (“DPW”) as a highway maintenance facility, where salt, sand, and public works equipment are stored. A Cumberland Farms convenience store is across the highway, and a wooded area is at the rear of the property.
Under the ZBL, a telephone service provider must apply for a special permit to construct and operate a cell site within an R40 zoning district. In November of 2001, Célico filed an application with the Board for a special permit to erect a 150-foot monopole and accompanying externally mounted antennae, two dish antennae and certain ground-based equipment, within a fence enclosure, on the Upton Street Property. Célico later modified the proposal, changing the 150-foot monopole with external antennae to a 120-foot pole, with internal antennae, designed to resemble a flagpole (“flagpole design”). Célico also offered to paint the pole a color of the Board’s choice.
A public hearing was opened by the Board on January 14, 2002, and further hearings were held on February 11, March 11, April 8, and April 29 of that year. At the hearings, Célico presented evidence demonstrating a gap in its service coverage and represented that the proposed tower would decrease the number of towers needed in Grafton because another wireless service would be able to co-locate (ie., share the tower). 1 At the first hearing, Board member Robert Hassinger suggested that the parties conduct further investigation regarding possible alternative sites. At the February 11th hearing, Céli-co submitted the results of a balloon test, 2 in which the company hung blue, yellow, and red balloons at 150, 120, and 100 feet, respectively, to allow the public to view the proposed height of the tower. Hassinger again noted that he was not satisfied that Célico had exhausted all possible options and suggested alternative sites that Célico could consider.
At Celleo’s expense, the Town retained David Maxson of Broadcast Signal Lab, a wireless engineering and consulting expert, to provide technical assistance to the Town in reviewing Cellco’s application. Maxson drafted a report (“Maxson report”) summarizing his conclusions as to the evaluation of alternative sites. 3 Max- *75 son testified at the hearing on April'29, 2002.
After hearing Maxson’s testimony; 'the Board requested that the hearing be continued until after the annual meeting of the Town Water District Commission on April 30, 2002, in order to give that body an opportunity to vote on whether to permit wireless telecommunications facilities to be placed on facilities or property within its jurisdiction (specifically, on the water standpipe on Pigeon Hill). Cellco’s representatives requested that the hearing be closed and stated that Célico was not interested in other locations.
Prior to the Board’s decision denying the special permit, but after the close of the public hearings on April 29, 2002, Céli-co submitted a letter from the Massachusetts Historic Commission in which that agency concluded that the proposed flagpole design would have no adverse effect on the historical features of Grafton Center and Grafton Common. Célico also applied for three waivers (and a fourth that later became moot) in conjunction with its application. All of the applications were denied by the Board.
Throughout the hearing process, a number of abutters to the proposed site and other Grafton residents expressed opposition to the construction of the facility on the Upton Street Property, based on their concerns about the visibility of the monopole from the historic town green. 4 Additionally, the Grafton Historic District Commission (“GHDC”) submitted several letters expressing opposition and citing the negative visual impact that the cell tower, would have on Grafton Common.
On July 23, 2002, the Board issued an unanimous decision denying .Cellco’s application for a special permit.
Since 1994, the Board has granted ten applications for special permits for cell sites (eight since the adoption of the ByLaw). There are; however, no cell sites in Grafton Center. There has been only one other application for a cell site in Grafton Center, and that application was withdrawn.
B. The Zoning By-Law
The relevant portions of the ZBL are as follows:
5.8.3 Site Selection Preferences
These regulations are written to indicate that the Town of Grafton preferences for facility locations are as follows, in descending order of preference:
1. On existing structures such as buildings, communications towers, smokestacks, utility structures, etc.
2. In locations where existing topography, vegetation, buildings or other structures provide the greatest amount of screening
3. On new towers in the CB, OLI and I zoning districts
4. On government ór educational institution structures in the' CB, OLI and I zoning districts
5. On government or educational institution structures in the A or R40 zoning districts
6. On government or educational institution structures in the R20, RMF or NB zoning districts
*76 7. On new towers in the A and R40 zoning districts
8. On new towers in the R20, RMF and NB zoning districts
5.8.4 Additional Submittal Requirements
b)Site Justification or Appropriateness Statement, including a description of the narrowing process that eliminated other potential sites.
d) Support materials that show: the location of structures of similar or greater elevation within one-half-mile ... radius of the proposed site/parcel; that the owners of those locations have been contacted and asked for permission to install the facility on those structures, and denied, or that such other locations do not satisfy requirements to provide the service needed. This would include, but not be limited to, smoke stacks, water towers, tall buildings, antenna or towers of other wireless communications companies, other wireless communications facilities (fire, police, etc.) And all other tall structures. Failure to present evidence of a good faith effort on the part of the applicant to utilize existing facilities shall be grounds for denial of the application.
5.8.5 Conditions for Granting
[T]he planning Board shall make findings on which to base its determination on the specific issues of:
b) if the proposed facility is to be located in a residential zoning district ..., whether the applicant has provided substantial evidence that the facility cannot, by technical necessity, feasibly be located in a non-residential zone.
c) whether the proposal would sufficiently screen the facility from view, both through landscaping, placement and design, in order to minimize the visual appearance of the entire facility from areas within a [1,820'] radius of the proposed facility location.
d)whether the proposed facility will be housed within or upon a special structure, which will be architecturally compatible with the surrounding residential area (including, for example, bell tower or church steeple), or whether, by virtue of its design, no such special structure is required in order to minimize the visual impact within a one-quarter-mile (1,320') radius. This provision applies to facilities in a residential (A, R40, R20, or RMF) zoning district ...
5.8.6General Requirements
5.8.6.1 Any principal part of the facility ... shall be setback from the nearest property line by a distance of twice the height of the facility ... or a distance of three hundred feet (300'), whichever is greater.
5.8.6.4 A tower shall be of monopole or similarly unimposing design.... The applicant shall successfully demonstrate to the satisfaction of the Board that the proposed facility will have minimal visual impact.
5.8.6.9 All utilities proposed to serve the facility shall be installed underground. 5.8.6.13 Landscaping shall be provided around the base of the facility.... The landscaping shall consist of a planting strip at least 25 feet wide _Appli-cants may substitute alternative landscape plans that meet the purposes of this subsection to limit the visual impact of the lower portion of the tower and adjoining accessory facilities for the Board’s consideration.
C. Denial of Cellco’s Application
In the relevant portions of its written decision, the Board found:
F9.) That the proposed facility is for the construction of a new tower within a R-40 zoning district, and that a proposal of this type is one of the least preferred *77 with regard to the list of preferred facility locations in Section 5.8.3 of the ZBL. The Board further finds that a number of alternative sites were identified during the public hearing, of which several appear preferable with regard to Section 5.8.3 of the ZBL.
F13.) That with regard to Section 5.8.4b, the Applicant submitted the letter identified as EXHIBIT 8 of this Decision in response to the requirements for a Site Justification or Appro priateness Statement, as described in said section. No justification of the proposed site was included in this narrative. The Board further finds that although additional sites were mentioned, the de scription of the narrowing process is inadequate.
F15.) That with regard to Section 5.8.4.d., regarding suitable existing structures, the Applicant submitted material (EXHIBITS 6 and 8 of this Decision) to address this requirement. The Board further finds that this material does not satisfy this requirement. The Board further finds that it provided the Applicant with the opportunity to address these submittal deficiencies during the public hearing process. The Board finds that the Applicant responded to the Board by submitting the letter identified as EXHIBIT 44 of this Decision, which indicated at that time the Grafton Water District Board of Water Commissioners had voted not to allow-wireless facilities on the Pigeon Hill Tank or on property of the. Water District. The Board further finds, however, that said EXHIBIT indicated that - a vote was scheduled to occur on April 30, 2002, which would consider whether to allow wireless facilities on Water District tanks. The Board finds that based on this EXHIBIT, and during the hearing on April 29, 2002, the Board asked the Applicant to consider continuing the' public hearing until the next Planning
Board meeting in order to .learn the outcome of the vote regarding wireless facilities on . the Water Commission’s tanks, and the possible inclusion of this site as a viable alternative. The Board finds that the Applicant informed the Board at the hearing on April 29, 2002, that they were not interested in further evaluating any alternative sites, referenced in Find # F9 of this Decision, and that the Applicant requested the public hearing be closed. The Board finds -that based, on the original submittal and the events described above, the Applicant failed to provide a good faith effort to utilize existing facilities. The Board further finds that as noted in Section 5.8.4.d. of the ZBL, such failure constitutes grounds for denial of the Application.
F24.) The Board further finds with regard to Section 5.8.6.4, that the structure is visible from the historic district encompassing the Town Common. It is approximately one quarter mile from the locus of the Town Common and is visible above the skyline from several points of view within the Historic District. Both the 120-foot and 100-foot flagpole designs are visible from the visually sensitive Historic District, and this visibility includes projection above the rooflines of historic buildings. This visual impact is different from that caused by other development in the area outside the District, and is not minimal, and is unacceptable. ' The Board further finds with regard to Section 5.8.Ó.4, that the Applicant did not-, satisfy the requirement to successfully demonstrate to the satisfaction of the Board that the proposed facility will have a minimal.visual impact, as required by said Section.
In addition, the Board found .that the proposed- facility did not meet the minimum setback requirement (F44), was not “generally compatible” with adjacent prop *78 erties (F45), and did not protect historic, cultural and scenic landscapes (F48). The Board also found that Célico did not “provide substantial evidence that the facility cannot, by technical necessity, feasibly be located in a non-residential zone” (F50); that the “proposal [did] not sufficiently screen the facility from view” (F51); and that the “structure will not be architecturally compatible with the surrounding residential area” (F52).
The Board denied each of the four waivers requested by Célico, and gave its reasons as follows:
1) Respecting the setback requirement: “[T]he setback requirement of [Section 5.8.6.1] serves an important role to minimize impacts to visually sensitive areas, in addition to the buffering and screening requirements of the By-law.”
2) Respecting the requirement that accompanying facilities be located underground: “Applicant did not state or explain why the utilities could not be located in accordance with the By-law in a different area on the site, further away from the wetlands.”
3) The request for a waiver for external antennae became moot with the revision of the design to resemble a flagpole.
4) Respecting the landscaping requirement: “[T]he Applicant did not satisfy [Section 5.8.6.13] as to substituting alternative landscape plans that meet the purposes of said Section to limit the visual impact of the lower portion of the tower and adjoining accessory facilities.”
II. DISCUSSION
Célico claims that the Board’s denial of its application for a special permit to locate a telecommunications facility on the Upton Street Property was unsupported by substantial evidence and constituted an effective prohibition of personal wireless services in Grafton Center. In response, the Town argues that Cellco’s application was denied because Cellco’s proposal was inconsistent with the purpose and intent of the ZBL. Moreover, the Town contends that Célico has not sustained its burden of establishing that the Upton Street Property is the only site from which wireless services may be provided to Grafton Center (ie., that there are no available, feasible alternatives), and that further reasonable efforts to obtain a permit are so likely to be fruitless that it is futile even to try.
A. Counts I and II: The Telecommunications Act
The TCA strikes a compromise between the federal interest in establishing a national network of wireless services and the local interest in retaining authority to make zoning decisions.
See Town of Amherst v. Omnipoint Communications Enters., Inc.,
1. Substantial Evidence
Under the TCA, the denial of a request for a permit to locate a telecommunications
*79
facility must be supported by substantial evidence contained in a written record.
See Nat’l Tower, LLC v. Plainville Zoning Bd. of Appeals,
Simply put, local governments are required to state clearly and in writing the reasons for a denial of permission to locate a telecommunications facility, and those reasons must be supported by substantial evidence in the record.
See Southwestern Bell,
(1) The 120-foot flagpole design proposed by Célico would be visible above the skyline from several places within the Historic District. The visual impact of the tower would be non-minimal and incompatible with the architecture of the ■ surrounding area;
(2) Construction of a new tower within a R40 zoning district was one of the proposals least preferred by the ZBL, and Célico did not adequately consider alternative sites; nor did it demonstrate that the facility, by technical necessity, could not be located in a non-residential zone; and
(3)Cellco’s proposal met neither the setback and landscaping requirements, nor the requirement that accompanying facilities be located underground.
See Decision of Grafton Planning Bd., Ex. 8, Aff. of Sarah L. McGinnis, Docket No. 30.
The question now raised is whether the reasons proffered by the Board are supported by substantial evidence in the record. In order to make that determination, I must review the entire record, taking into account evidence that is both supportive of and contradictory to the Board’s conclusions.
See Penobscot Air Servs., Ltd. v. FAA,
The Board’s primary reason for denying Cellco’s special permit application was its assessment of the aesthetic impact of locating the facility on the Upton Street Property, within a quarter mile of the Grafton Historic District. Relying on opposition from residents and from the Grafton Historic District Commission, as well as its own independent assessment of the photographs from the balloon test, the Board concluded that the proposed 120-foot flagpole design would have a negative visual impact on the historic Town Common. The Board received evidence of op *80 position to the location of a facility on the Upton Street Property, in the form of letters from three residents, oral protest at the April 29th hearing, and a petition signed by 273 Grafton residents. The Board also received a letter from the Grafton Historic District Commission, expressing that entity’s unanimous opposition to the tower because it would “significantly alter the hilltop character of the center of Grafton.” See Exhibit 38 of the administrative record.
The evidence in the record reflects more than “generalized concerns” about the aesthetic appeal of wireless telecommunications facilities.
See Southwestern Bell,
We think the erection of the proposed phone tower will importantly affect the beauty and historical ambience of the Common. For example, when standing at the south-west quarter of the Common, near its perimeter, the vista framed by the Library to the right, and Grafton Inn to the left was dominated by the test balloons. The sight of a tower would [be] clearly inconsistent with the Common. Another example was the view of the balloons over the McGill building, distracting from the character of that classic Greek Revival structure.
See Exhibit 28 of the administrative record.
To its credit, Célico did modify the original proposal for a 150-foot monopole to accommodate the Board’s desire for a less conspicuous facility and proposed a “stealth” flagpole design instead. However, unless there are indications that visual impact is a pretext for illegitimate biases against facilities, it is exclusively within the purview of the Town to make aesthetic judgments.
See Amherst,
Still, Célico argues that, in reaching its decision on visual impact, the Board did not take into account any of the evidence in the record that supported Cellco’s position. Specifically, Célico claims that the Board ignored both the letter from the Massachusetts Historic Commission, in which the Commission concluded that the facility would have no adverse effect on Grafton’s historical areas, particularly in view of the apparently unsightly Cumberland Farms sign across the street from the Upton Street Property. But, as Célico conceded at the hearing on the present motions, the fact that these matters were not mentioned in the Board’s written decision does not mean that the Board failed to consider them. The Board is not required to keep an exhaustive account of its deci-sionmaking process.
See Southwestern Bell,
I have considered the record as a whole and find that substantial evidence exists to *81 support the Board’s finding that the tower would have a negative visual impact on the historic green. As Célico conceded at the hearing before me on the present motion, the Board reasonably could have concluded that the tower was simply more unsightly than the Cumberland Farms sign, or that allowing the sign in the first place was a mistake. Moreover, the letter of the Massachusetts Historic District Commission was submitted to the Board after the close of the evidence. Notwithstanding the late submission, the Board reasonably could have chosen to credit the local historic commission’s opinion about visual impact over that of the state commission. The Board also found, and it is conceded by Célico, that the Upton Street Property is located in a R40 zoning district. The Upton Street' Property thus is seventh out of eight, in descending priority, on the site preferences listed in Section 5.8.3 of the ZBL.
The Board found further that Célico had not complied with Section 5.8.5(b) of the ZBL, which requires the applicant to provide “substantial evidence that the facility cannot, by technical necessity, be located in a non-residential zone.” There is ample evidence in the record, including Cellco’s failure to comply with certain submittal requirements outlined in the by-law, to support the Board’s finding that Célico failed to make a good faith effort to evaluate alternatives or to utilize existing facilities. 5 I need not rehearse that evidence here, because I think it sufficient to point out that Cellco’s conduct at the hearing on April. 29, 2002, adequately supports the Board’s conclusion. • As noted above, at that final hearing, the Board pointed out that the water standpipe located within the Grafton Water District might provide adequate signal coverage to meet Cellco’s objectives and recommended continuing the hearing until after the Water District Board voted on whether to allow telecommunications facilities on its facilities. Instead of agreeing to the continuance as the Board requested, Cellco’s representative stated that Célico was not interested, in further evaluating any alternative sites and requested the hearing be closed. 6 It was certainly reasonable for the Board to conclude, from Cellco’s reaction to the suggestions of a continuance of the hearing and from the absence of contrary evidence in the record, that Célico had not made a good faith effort to assess all alternative locations for their potential to serve the targeted coverage area.
As a concluding note to the foregoing discussion of substantial evidence, I emphasize that the plan proposed by Célico was at odds with the provisions of the bylaw from the very beginning. The proposed site was next to the lowest on the by-law’s preference list, was within a quarter mile of a historic district, and required no fewer than three waivers for the granting of a special permit. From the perspective of the purpose and intent of the by *82 law (which the plaintiffs do not challenge) this was perhaps one of the worst places in Grafton to erect a telecommunications facility. The Board suggested a number of alternatives to Célico, and only after Célico refused to consider them further, did the Board ultimately deny the special permit application. Based on the evidence in the administrative record, I GRANT the Town’s motion for summary judgment as to count I and DENY the motion of Célico as to that count.
2. Effective Prohibition of Wireless Services
The TCA also provides that a state or local government “shall not prohibit or have the effect of prohibiting the provision of personal wireless services.” 47 U.S.C.A. § 332(c)(7)(B)(i)(II). This anti-prohibition clause “can be violated even if substantial evidence exists to support the denial of an individual permit under the terms of the town’s ordinances.”
Nat’l Tower,
Review of a zoning board’s decision under the anti-prohibition clause is
de novo.
The district court need not accord any deference to the local board and may review evidence that is not contained in the administrative record.
Nat’l Tower,
Summary judgment is appropriate when “the pleadings, depositions, answers to interrogatories, and admissions on file, together with the affidavits, if any, show that there is no genuine issue as to any material fact and that the moving party is entitled to a judgment as a matter of law.” Fed.R.Civ.P. 56(c). The moving party has the burden of establishing “the lack of a genuine, material factual issue.”
Snow v. Hamischfeger Corp.,
The plaintiff must establish two elements in an effective prohibition claim: (1) that the Town’s zoning decisions and ordinances prevent the closing of significant gaps in the availability of wireless services,
Nat’l Tower,
Thus, the starting point of the effective prohibition analysis is always to determine whether there is a substantial gap in service that could be addressed by the proposed facility. “A ‘gap’ in wireless services exists ‘when a remote user of those services is unable to either connect with the land-based national telephone network, or to maintain a connection capable of supporting a reasonably uninterrupted communication.’ ”
Omnipoint,
Regarding the second element (the futility of further efforts to reach an accommodation with the Town), Célico argues that the circumstances surrounding the denial of its application for a special permit indicate that applying for another permit would be fruitless. Obviously, the imposition of a blanket ban on cell towers or facilities would violate the TCA’s anti-prohibition clause, but so too can an individual zoning decision.
Amherst,
“For a telecommunications provider to argue that a permit denial is impermissible because there are no alternative sites, it must develop a record demonstrating that it- has made a
full effort
to evaluate the other available alternatives and that the alternatives are not feasible to serve its customers.”
Southwestern Bell,
The parties appear to agree that there is no “direct replacement,” from an RF perspective, for the Upton Stréet Property; however, Célico has not eliminated the possibility that there may be other single or multiple site solutions that will provide adequate coverage to the gap. Other sites suggested by the Town include the steeple of the United Church of Christ located in Grafton Center. Even Jared Robinson, Cellco’s RF expert, has acknowledged that the church steeple’ can accommodate antenna arrays, and that a facility located there would cover the Grafton Center and some of the surrounding neighborhoods. See Aff. of Jared Robinson, Ex. 1 at ¶ 11, McGinnis Aff. Although Robinson has stated that the steeple is not tall enough fully to address Cellco’s coverage objectives, see id., Cellco seems not to have considered how coverage of areas not addressed by a facility at the church or at other sites proposed by the Town (e.g., the smokestack near the Town Hall office building) might be provided by increasing the signal strength at other Célico facilities or by seeking permits for more facilities. See, *84 e.g., Dep. of David Maxson at 102-104 (describing how CEllco might be able to reallocate the siting of facilities to cover the gap in Grafton without building a tower at the Upton Street Property).
At the hearing on April 29, 2002, the Town also suggested consideration by Céli-co of the State Police tower at 40 Worcester Street. Although Robinson has stated that the State Police tower does not “appear to have sufficient structural strength” to support the necessary equipment, see Robinson Aff. at ¶ 8, there is no evidence that Célico ever tested the structural strength of the tower or sought the opinion of a structural engineer to confirm Robinson’s observation. Moreover, there is no evidence that Célico ever considered the possibility of constructing a replacement tower that would accommodate telecommunications and emergency facilities. See Dep. of Robert Hassinger at 85 (stating that the State Police tower was discussed at the hearing, but that it would need to be rebuilt in order to accommodate a cell site). As a final point with respect to the State Police tower, Célico contends that the State Police are unlikely to agree to sharing a tower with a wireless service provider. There is no evidence, however, that Célico ever approached the State Police with an offer.
Finally, Célico does not appear to have adequately considered the possibility of reconfiguring its network, or using cell sites from outside Grafton Center to provide service within Grafton Center.
See Second Generation,
The First Circuit’s analysis in
Amherst
suggests that a Town might require a provider to rethink its network design.
See Amherst,
*85
Far from foreclosing all of Celleo’s options in providing coverage to Grafton Center, the record indicates that the Board tried to work with Célico by repeatedly suggesting alternative sites Céli-co might explore. In offering alternatives, the Board’s actions were supererogatory.
See Nat’l Tower,
In summary, Cellco’s proposed site was one of the most objectionable locations in Grafton for a 120-foot tower, and the Board gave Célico numerous suggestions that would receive favorable consideration by the Board. Thus, it is simply far “too early to give up on the Board.” Id. at 16. Cellco’s “one-proposal strategy may have been a sound business gamble, but it does not prove the Town has in effect banned personal wireless communication.” Id. at 15 (noting that site planning and procuring leases are both expensive and time-consuming for providers).
Thus, the Town’s motion for summary judgment is GRANTED as to count II. The motion of Célico for summary judgment as to this count is DENIED.
B. Count III: 42 U.S.C. § 1983
Because I have sustained the Board’s decision to deny the special permit and *86 have concluded that the rejection of Cell-co’s application for that special permit does not constitute an effective prohibition, there is no TCA violation. Accordingly, there can be no § 1983 claim, because no federal right has been infringed.
Moreover, there is disagreement among the courts as to whether § 1983 is preempted by the enforcement scheme of the TCA itself.
Compare Nat'l Telecomm. Advisors, Inc. v. City of Chicopee,
The Town’s motion for summary judgment is GRANTED as to count III; the corresponding motion of Célico for summary judgment on this count is DENIED.
C. Count IV: Substantive Due Process
Célico claims that the Board’s refusal to waive the setback, landscaping, and burying requirements of the ZBL constitutes a violation of substantive due process. As the plaintiffs have cited no cases to support the notion that denial of a waiver request is cognizable as a substantive due process claim, I do not address this claim substantively.
See United States v. Figueroa-Encarnacion,
D. Count V: Violation of Mass. Gen. L. 40A and the By-Law
Finally, Célico claims that the Board’s denial was arbitrary and capricious, not based upon evidence, and in excess of the Board’s authority under Mass. Gen. L. 40A and the ZBL. A decision of the Planning Board can only be disturbed under chapter 40A § 17 if it is based on a legally untenable ground or is unreasonable, whimsical, capricious or arbitrary.
See Subaru of New England, Inc. v. Board of Appeals of Canton,
Thus, the Town’s motion for summary judgment is GRANTED as to count V, and Cellco’s motion for summary judgment as to this count is DENIED.
III. CONCLUSION
The motion for summary judgment of the plaintiff Célico is DENIED. The motion for summary judgment of the defendant Town of Grafton is GRANTED.
IT IS SO ORDERED.
Notes
.The parties appear to dispute the number of additional facilities that could be accommodated by the flagpole. Célico suggests it might be able to accommodate two additional facilities; the Town suggests it is only one. It is undisputed that the modification in the design from a monopole to a flagpole reduced the extent to which other providers could co-locate.
. The balloon test is required by the ZBL. Town of Grafton, Massachusetts Zoning ByLaw 5.8.4(e).
. I will refer to the Maxson report in the discussion below where necessary, but feel no need to belabor the present statement of facts by reciting his conclusions now. I note that the Maxson Report is dated June 4, 2002, *75 after the close of public hearings before the Planning Board on April 29, 2002. The report is not listed as a numbered exhibit in the administrative record, and I will not consider it part of the record when I discuss Cellco's substantial evidence claim.
. Célico points out that these residents may not have known at this time that the proposal had been changed to a flagpole.
. These submittal requirements include: 1) Section 5.8.4(b), which requires submission of a Site Justification and Appropriateness Statement, including a description of the narrowing process that eliminated other potential sites; and 2) Section 5.8.4(d), which requires extensive documentation of efforts to evaluate all sites of similar height or elevation within a half-mile radius of the proposed site for feasibility and availability.
. It is irrelevant to the substantial evidence claim that the Water District Board later voted not to allow the siting of telecommunications facilities within the water district. First, the hearing before the Planning Board was closed on April 29, 2002, at Cellco’s request, and no evidence of the Water District Board’s decision is contained in the administrative record. Second, the Board was entitled to consider Cellco's refusal to wait until after the meeting of the Water District Board as evidence of Cellco's failure to make good faith efforts to explore alternative sites.
. Indeed, Célico admits that other carriers have successfully sought permits to site facilities in the non-residential zones.
. Cellco's accusations that the Board forced another provider to withdraw its application to locate a facility'in Grafton Center is entirely unsupported by any admissible evidence in the record. The only basis for this contention in the record is the affidavit of Kenneth Kelly, president of VitalSite Services, a real estate consulting firm employed by Célico. Without revealing any basis of personal knowledge, Kelly states only that he is "aware that Nextel withdrew its application after several hearing sessions because the Board had made clear that the application would be denied if it were not withdrawn.” Even if true and admissible, there is no indication from this statement that the Board was hostile to Nextel's applications for illegitimate reasons or that any interactions between the Board and Nextel were improper.
. Tellingly, in rejecting the standpipe, Stephen Russell, a property consultant hired by • Célico, vaguely states in his affidavit that the water district property "does not represent an
improvement
over the DPW property ...” Affidavit of Stephen Russell, Exhibit 5 to Affidavit of Sarah McGinnis (emphasis added). Language like this indicates that Cellco may be dismissing alternatives as infeasible because they are not Cellco’s first choice. In an effective prohibition claim, the provider must demonstrate that no alternatives are "technically feasible,” not just that they are less desirable,
See Amherst,