OPINION AND ORDER
Plаintiffs Cascadia Wildlands and Oregon Wild move for summary judgment pursuant to Fed.R.Civ.P. 56. Defendant United States Forest Service (“Forest Service”) and defendant-intervenors Freres Lumber Company, Inc. (“Freres”) and
BACKGROUND
This case involves a challenge to the Forest Service’s authorization of the Goose Project (“Project”) located in the McKenzie Ranger District of the Willamette National Forest (“WNF”) near the community of McKenzie Bridge. Administrative Record (“AR”) 18433. This region falls under the purview of the Northwest Forest Plan (“NFP”), which coordinates federal efforts to balance environmental concerns with the need for sustainable forest products within the range of the northern spottеd owl.
Working .within this framework, the Forest Service developed the Goose Project. The Forest Service’s stated purpose for the Project is threefold: “1) Actively manage stands to improve stand conditions, diversity, density, and structure, 2) Reduce hazardous fuel levels in the McKenzie Bridge Wildland-Urban Interface (“WUI”), and 3) Provide for a sustainable supply of timber products within the Goose Projeсt boundary.” AR 13435.
To these ends, the Project would permit commercial harvest of approximately 2,100 acres of public lands in the WNF through commercial thinning (1,255 acres), early serai wildlife thinning (195 acres), skip and gap creation (598 acres), dominant tree and sugar pine release (11 acres), and regeneration harvest treatments (41 acres).
At issue with the Project are the loss and downgrade of habitat for the northern spotted owl, regeneration harvests within Riparian Reserves, the loss of potential wilderness from the Lookout Mountain Potential Wilderness Area (“PWA”), and the extent of road construction. Specifically, the Project authorizes 454 acres of removal or downgrade of northern spotted owl habitat. AR 15286. In Riparian Reserves, it includes 362 acres of commercial thinning and an additional 582 acres slated for fuels treatment.
On June 2, 2009, the Forest Service conducted a public field trip in an effort to gather public opinion оn potential forest management activities. AR 2404. In August 2009, the Forest Service prepared a Biological Assessment (“BA”) to analyze the effects of various proposed federal actions on the northern spotted owl and its habitat. AR 2664-2780. Further, the Forest Service formally consulted with the Fish and Wildlife Service (“FWS”) in September 2009 to analyze specific effects of the Project on the spotted owl. AR 4822. The resulting Biological Opinion (“BiOp”), issued by the FWS, determined that while the Project would likely adversely affect specific owls, the Project would not further threaten the species’ continued existence. AR 4934-36.
On October 1, 2009, the Forest Service listed the Project in the Schedule of Proposed Actions. AR 15234. The Forest Service mailed postcards to the public on November 16, 2009, requesting scoping cоmments on the project by December 7, 2009. Id.
On June 23, 2010, the Forest Service published an Environmental Assessment (“EA”) of the Goose Project. The EA included references to both the BiOp and the BA. See, e.g., AR 13554, 13555. Following a review of the comments received in response to the EA, the Forest Service issued a Decision Notice and Finding of No Significant Impact (“FONSI”) on September 13, 2010. AR 15232-86. The decision approved the Project with only minor modifications.
In November 2010, plaintiffs challenged the Project via administrative protest. AR 15435^12. On December 16, 2010, the Forest Service responded to these protests
After exhausting their administrative remedies, plaintiffs filed a complaint in this Court, alleging that both the 2010 EA and FONSI violate the National Environmental Policy Act (“NEPA”). Plaintiffs maintain that the EA failed to disclose environmental information and consequences of the Goose Project on both the northern spotted owl habitat and the affected Riparian Reserves. Plaintiffs further contend that the proposed actions trigger NEPA’s requirement that the Forest Service prepare an Environmental Impact Statement (“EIS”).
STANDARD OF REVIEW
A federal agency’s compliance with NEPA is reviewed under the Administrative Procedure Act (“APA”). 5 U.S.C. § 706. Under the APA, a final agency action may be set aside if, after reviewing the administrative record, the court determines that the agency’s action was “arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law.” Natural Res. Def. Council v. Nat’l Marine Fisheries Serv.,
Review under this standard is narrow, and the court may not substitute its judgment for that of the agency. Morongo Band of Mission Indians v. Fed. Aviation Admin.,
DISCUSSION
Plaintiffs assert that the Forest Service’s authorization of the Goose Project violated NEPA’s procedural requirements by failing to disclose consequences of the Project and by failing to prepare an EIS for the Project. Initially, plaintiffs argued that the Forest Service violated NEPA in four ways; however, as both parties now concede that a recent ruling from the Ninth Circuit Court of Appeаls foreclosed two of those arguments, this Court will not address them here. See Pis.’ Reply Mem. in Supp. of Mot. Summ. J. 15, Def.’s Mem. in Supp. of Mot. Summ. 26; Earth Island Inst. v. U.S. Forest Serv.,
NEPA is “a procedural statute that does not mandate particular results, but simply provides the necessary process to ensure that federal agencies take a hard look at the environmental consequences of their actions.” Sierra Club v. Bosworth (“Sierra Club I”),
The agency first prepares an EA to determine whether an action will be significant; if the. agency concludes there is no
I. First NEPA Claim: Failure to Disclose Environmental Information
Plaintiffs first contend that the Forest Service violated NEPA by failing to disclose 1) environmental information about the habitat competition between the spotted owl and the barred owl, and 2) consequences of logging in critical Riparian Reserves. Specifically, plaintiffs argue that the limited discussion of the interspecies competition between barred owls and northern spotted owls' in the BA and BiOp did not satisfy NEPA’s requirements. Further, plaintiffs claim that the Forest Service’s analysis of logging in Riparian Reserves failed to demonstrate why it was a necessary part of the Project.
A. EA Requirements
An EA is a “concise public document” that provides an agency’s analysis of proposed action. 40 C.F.R. § 1508.9(a). The EA “shall include brief discussions of the need for the proposal, of alternatives [to the proposed action], of the environmental impacts of the proposed action and alternatives, and a listing of the agencies and persons consulted.” Id. at § 1508.9(b). Federal regulations authorize the agencies to incorporate additional scientific data and documents by reference into the NEPA documents “when the effect will be to cut dоwn on bulk without impeding agency and public review of the action.” Id. at § 1502.21 (EIS, Incorporation by Reference); 36 C.F.R. § 220.4(h) (“Material may be incorporated by reference into any environmental or decision document. This material must be reasonably available to the public and its contents briefly described ... ”).
B. Analysis
Between 2009 and 2010, the Forest Service evaluated the environmental impacts of the Project resulting in the 2010 EA. AR 13428-557. As a part of its evaluation, the Forest Service consulted with the FWS regarding the spotted owl and the FWS submitted a BiOp; these conclusions and recommendations were included in the Forest Service’s EA. AR 13494-98. Further, the Forest Service discusses the effects of the Project, as well as a no action alternative, on the Riparian Reserves within the project area. AR 13477-79.
i. Failure to Disclose Information Regarding Barred Owl/Northem Spotted Owl Habitat Competition
Plaintiffs maintain that the EA failed to discuss or disclose the Project’s effect on interspecies competition between the northern spotted owl and the barred owl, and that any discussion of this competition in the BA and BiOp did not satisfy NEPA’s disclosure requirement and was not readily available to the public for review. Plaintiffs emphasize NEPA’s fundamental purpose of “foster[ing] better decision making and informed public participation for actions that affect the environment.” Or. Natural Res. Council Action v. U.S. Forest Serv.,
Contrary to the plaintiffs assertion, the Forest Service clearly referenced and identified the BA and the BiOp, including
Plaintiffs further assert that 'these cursory mentions of the BA and BiOp in the EA and FONSI did not take the requisite “hard look” at the specific impact of the Project on habitat competition between the owls. The bulk of the analysis, plaintiffs contend, took place in the BA and was not included in the EA. Plaintiffs cite Pacific Rivers Council v. U.S. Forest Serv.,
Unlike Pacific Rivers, the Forest Service here undertook an analysis of the consequences of the Project on the northern spotted owl and relied on a BA that also analyzed the effect of the Project. As required by the Endangered Species Act, the Forest Service further consulted with thе FWS to prepare a BiOp to analyze the effects of the Project on the northern spotted owl. 16 U.S.C. § 1531 et seq. Both the EA and the FONSI explain project-specific potential consequences and include references to the more detailed BA and BiOp, which discuss the interspecies competition for habitat. The EA notes that the proposed logging would likely adversely affect individual northern spotted owls, but would nbt jeopardize the continued existence of the species. AR 13495. The FONSI includes similar information, as well as the mitigation efforts included in the plan and responses to public comments on the potential effects. AR 15244, AR 15251, AR 15260, AR 15272-74.
Moreover, .NEPA regulations only “direct the agency to consider the degree of adverse effect on a species, not the impact on individuals of that species.” Envtl. Prot. Info. Ctr. v. U.S. Forest Serv.,
Nonetheless, plaintiffs maintain that the EA must include a thorough analysis of
Moreover, the Forest Service discloses the same uncertainty regarding the inter-species competition, noting in the BA, “[i]t is also clear that, in some portions of the northern spotted owl’s range, barrеd owls are increasing and spotted owls are declining to some degree independently of forest management.” AR 2763. In its BiOp, the FWS also discusses the significant amount of uncertainty regarding the effects of forest management on habitat competition between the owls, ultimately concluding “that the NFP in concert with the guidelines from the Northern Spotted Owl Recovery Plan still provides the backbone of the federal contribution to spotted owl recovery even with the uncertainty surrounding the effect of the barred owls on spotted owls.” AR 4861.
Defendants point to NEPA’s requirement that documents “concentrate on the issues that are truly significant to the action in question, rather than amassing needless detail.” 40 C.F.R. § 1500.1(b). Here, the Forest Service described in detail the potential consequences of the Project to the northern spotted owl and incorporated the BA and BiOp that were prepared to assess the effects of the Project on the threatened species. The EA described the potential harm to three nesting sites due to habitat removal and harassment of one site for two seasons due to helicopter logging and the Forest Service disclosed the uncertainty regarding competition with barred owls. AR 13495-97. This Court finds that the Forest Service adequately disclosed the environmental consequence of the project on the northern spotted owl.
ii. Failure to Disclose Information Regarding Logging in Riparian Reserves
In its FONSI, the Forest Service asserts that “a hard look was taken in deciding whether to commercially thin Riparian Reserves” and noted its reasons for ultimately authorizing the thinning project on 362 acres of Riparian Reserves. AR 15239. The Forest Service’s goal of “accelerating] the development of some late suecessional characteristics” would be “improved with larger tree sizes and increased structural diversity” within those 362 acres. Id. The Forest Service further noted that conditions of 3,901 acres of Riparian Reserves in the Project area “already met the desired objectives” of the Project, pursuant to the NFP. Id.
It is on the desired objectives of the NFP that the plaintiffs focus. Plaintiffs note that the NFP prohibits logging in Riparian Reserves, except to “apply silvicultural practices for Riparian Reserves to control stocking, reestablish and manage stands, and acquire desired vegetation characteristics needed to аttain Aquatic Conservation Strategy Objectives.” Pis.’ Reply in Supp. of Mot. Summ. J. 10. (quoting SAR 166) (emphasis added). Plaintiffs maintain that the Forest Service failed to disclose information “demonstrating that Riparian Reserve logging is needed to meet ACS Objectives.” Pis.’ Mem. in Supp. of Mot. Summ. J. 20. Plaintiffs argue that the thinning authorized by the Project actually conflicts with, rather than attains, ACS Objective #8, thus precluding the Forest Service from relying on this exception for logging in Riparian Reserves.
Here, the Forest Service explained in the EA that “a riparian management strategy ... was specifically developed to accelerate late-successional characteristics.” AR 13481. The Forest Service described the characteristics' it sought to achieve, including larger diameter trees and large wood to streams, to help provide complex habitat structure. AR 13436. Further, the Project “is designed to leave residual features like live trees, snags, and down woody debris that will add structural diversity and complexity into the future.” AR 15238. Addressing the prescribed fuels reduction, the Forest Service added that the “[introduction of low severity fire ... is also anticipated to increase the plant species аnd stand structural diversity. At low burn severities, large wood would not be removed from the Reserves.” AR 13479. The Forest Service also outlined in the EA and the FONSI how the Project conformed to all nine of the ACS Objectives. AR 13542-45,15276-77. For example, the Forest Service maintained that those stands within Riparian Reserves slated for thinning would “encourage development of large wood and late successional stand structure.” AR 13545.
The Forest Service concedes that “[i]n-creased stand health will reduce snag and dead wood recruitment in the individual treated stands; however, approximately 9,861 acres of stands that have not received timber management will continue to have environmental stressors influencing their stand development.” AR 15239. However, the Forest Service described mitigating measures to reduce the impact on Riparian Reserves, including “[n]o-harvest and no-treatment buffers on all streams ... to minimize effects to aquatic species and their habitat.” AR 13481-82. “All perennial streams (Class 1, 2, and 3) are provided with at least a 60 foot no-harvest buffer to retain effective stream shade.” AR 13472. In addition, trees from within these buffers will continue to contribute to the in-stream habitat. AR 13479.
Thus, this Court finds that the Forest Service has .disclosed the effects of the Project on Riparian Resepes as required by NEPA and declines to address any substantive claim based on the Project’s adherence to the ACS Objectives.
II. Second NEPA Claim: An EIS Is Required
Plaintiffs further assert that the Project proposes action that may significantly affect the environment, thus triggering NEPA’s requirement that the Forest Service prepare an EIS.
A. EIS Requirement
NEPA requires all government agencies to prepare an EIS when a proposed federal action may “significantly affect[] the quality of the human environment.” 42 U.S.C. § 4332(2)(C). Importantly, the significant effect need not actually occur; it is sufficient to trigger .the preparation of an EIS if a substantial question is raised “whether a project may have a significant effect on the environment.” Blue Mountains Biodiversity Proj. v. Blackwood,
B. Analysis
The Forest Service evaluated the potential effects of the Project and concluded that it would not have a significant effect on the human environment; therefore, the Forest Service argues an EIS for the Project is not required by NEPA.
In assessing a project’s significance, both its context and .intensity are evaluated. 40 C.F.R. § 1508.27. The context varies depending on thе scope of the project. Id. The intensity, or the “severity of the impact” of the proposed action, should be evaluated based on a number “significance” ■ factors.
First, plaintiffs point to the “unique characteristic” of the Project area and its proximity to the “ecologically critical areas” of potential wilderness and Riparian Reserves. 40 C.F.R. § 1508.27(b)(3). The administrative record shows, and the defendants do not dispute, that the Project would reduce the 9,664 acre Lookout Mountain PWA by 1,249 acres; 680 acres would be harvested and an additional 569 acres would be fragmented from the rest of the PWA. AR 13518. “Visible evidence of the management actions would not substantially alter the PWA but would be evident to the casual observer walking through or adjacent to the units for approximately fifty to sixty years.” Id. ■
In addition to the number of acres being logged, the Project authorizes construction of eight miles of temporary road and one mile of permanent road. The Forest Service, in its FONSI, notes that the road would be built in part to help minimize costs of the harvest activity and to provide fire access to the area, adding that the road would be gated and closed to the public after its use. AR 15240.
Plaintiffs argue that the Ninth Circuit has found logging in roadless areas “environmentally significant” for two reasons: 1) “their potential for designation as wilderness areas”; and 2) the nature of thе roadless area itself. Lands Council v. Martin,
Defendants rebut the contention that Lands Council is- applicable; even after the proposed thinning, the Lookout Mountain PWA would still total 8,435 acres, well above the 5,000 acre threshold for wilderness designation. Defendants also argue that a roadless area slated for some harvest dоes not trigger the EIS requirement per se, relying on Smith v. U.S. Forest Serv.,
The Smith court, however, ultimately found that the Forest Service had failed to consider the environmental effects of logging in a 5,000 acre roadless area. Id. The court further noted that “the decision to harvest timber on a previously undeveloped tract of land is an ‘irreversible and irretrievable decision’ which could have ‘serious environmental consequences.’ ” Id. at 1078 (citation and internal quotations omitted). While this Court agrees that an EIS is not per se required when logging is proposed in PWA, it is persuaded that the substantial decrease in overall acreage of the PWA, coupled with the construction of the permanent road, may have significant consequences to the PWA’s unique attributes.
Second, plaintiffs argue that the Project proposes actions that may produce highly uncertain or highly controversial effects. 40 C.F.R. § 1508.27(b)(4), (b)(5). “The purpose of an EIS is to obviate the need for speculation by insuring that available data are gathered and analyzed prior to the implementation of the proposed action.” Nat’l Parks & Conservation Ass’n v. Babbitt,
In support of this argument, plaintiffs point to the administrative record where the Forest Service acknowledges uncertainties of the Project’s effects.
Plaintiffs maintain that there is significant controversy regarding the benefits of logging in Riparian Reserves. Highlighting both the pros (development of larger trees and increased stand diversity) and cons (immediate decrease in coarse woody debris, increase to overall stand health), plaintiffs argue that “[t]his is just the type of scientific dispute regarding the effects of the proposed action that should have been addressed thrоugh additional research and data collection.” Pis.’ Reply Mem. in Supp. of Mot. Summ. J. 27.
Defendants counter that NEPA does not require an EIS every time there is some uncertainty regarding the potential effects, but only when the effects are “highly” uncertain. Envtl. Prot. Info. Ctr. v. U.S. Forest Serv. (“EPIC”),
Third, plaintiffs argue that an EIS is triggered by the significance factor considering the “degree to which [an action] may adversely affect an endangered or threatened species or its habitat.” 40 C.F.R. § 1508.27(b)(9). Here, the FWS concluded in its BiOp that the Project would adversely affect the northern spotted owl, although it would not threaten the continued existence of the species. However, “[a] project need not jeopаrdize the continued existence of a threatened or endangered species to have a ‘significant’ effect on the environment.” Klamath-Siskiyou Wildlands Ctr. v. U.S. Forest Serv.,
In- Klamathr-Siskiyou, the Forest Service determined that the proposed project would result in the loss of 500 acres of “high and moderate quality nesting/roosting habitat,” id. at 1082, and would result
Here, too, the Forest Service concluded that the Project will likely adversely affect the northern spotted owl. The Project would “downgrade 406 acres and remove 82 acres of existing suitable spotted owl habitat, which consists of nesting, roosting, and foraging habitat.” AR 13494. Further, the FWS determined that the Project would cause the “incidental take of two northern spotted owl nest pairs and one resident owl.” Id. Similar to Klamath-Siskiyou, the adverse effect on a threatened species, combined with the uncertainty of the actual effects, contribute to this Court’s finding that the Project may have a significant effect on the environment.
Finally, plaintiffs argue that the proposed thinning in Riparian Reserves threatens a violation of ACS Objective 8, therefore qualifying the potential effects of the Project significant. Plaintiffs argue that the proposed thinning would, in fact, “retard recruitment of woody debris for proper aquatic function,” in direct conflict with the NFP and the ACS Objectives contained within the NFP’s SG. Pis.’ Mem. in Supp. of Mot. Summ. J. 34.
Defendants maintain that a substantive claim based on the Forest Service’s analysis of Riparian Reserve effects should have been brought under NFMA and not the procedural requirements of NEPA. Defendants argue that in order to assert a threatened violation of the ACS Objectives as a “significance” factor warranting an EIS under NEPA, plaintiffs must allege a substantive claim that the Forest Service’s EA violates the NFP and NFMA.
As discussed above, this Court found that the Forest Service adequately ‘disclosed the effects of the Project within Riparian Reserves. However, the fact that the Forest Service disclosed such effects does not necessarily render them insignificant. As previously noted, logging in Riparian Reserves is generally prohibit-' ed by the NFP, with limited exceptions. The Forest Service relies on the exception that silvicultural practices may be applied when they are “needed to attain Aquatic Conservation Strategy objectives.” SAR 166. Plaintiffs counter the Forest Service’s analysis, arguing that logging will delay the build-up of coarse woody debris, which is “a key component of the Aquatic Conservation Strategy.” Pis.’ Reply Mem. in Supp. of Mot. Summ. J. 24; AR 13654-65, AR 13670-82. .
The Forest Service does not analyze this precise issue in its EA and fails to support the need for logging in Riparian Reserves as necessary to achieve ACS Objective 8. AR 13544-45 (describing the Project goals of achieving late successional characteristics, but not why those goals are necessary to “supply amounts and distribution of coarse woody debris” to achieve ACS Objective 8). Given the scope of the Project and the potential effects within ecologically critical Riparian Reserves, this Court may weigh the potential violation of the ACS Objectives as a “significance” factor, among others, in deciding whether an EIS is required.
The Court recognizes the deference afforded to an agency, and when considered individually, none of these significance factors might require an EIS. However, when considered collectively, they do. The Pro
When viewed together, this Court is compelled to find that these “significance” factors raise a substantial question as to whether the Goose Project may significantly affect the environment. Accordingly, NEPA requires that the Forest Service prepare an EIS.
CONCLUSION
The Forest Service’s and defendant-intervenors’ motions for summary judgment (docs. 25, 30) are GRANTED as. to plaintiffs’ NEPA claim that the Forest Service failed to disclose information regarding the Goose Project’s effects on the northern spotted owl and Riparian Reserves, and DENIED in all other respects. Plaintiffs’ motion for summary judgment (doc. 23) is GRANTED as to their NEPA claim regarding the Forest Service’s failure to prepare an EIS in light of the potentially significant effect of the Goose Project on the environment, and DENIED in all other respects.
Accordingly, the Forest Service is enjoined from going forward with the Goose Project until an EIS has been prepared. IT IS SO ORDERED.
Notes
. Defendant-intervenors’ arguments in favor of summary judgment are analogous to those asserted by the Forest Service. Accordingly, except where otherwise indicated, the Court will address defendant-intervenors’ and the Forest Service’s motions together.
. The NFP Record of Decision was adopted in 1994 and covers 24.5 million acres of land managed by the Forest Service and the Bureau of Land Management in Washington, Oregon, and northern California.
. The goal of the SG is to "maintain a healthy forest ecosystem with habitat that will support populations of native species ... including protection for riparian areas and waters; and maintain a sustainable supply of timber and other forest products that will help maintain the stability of local and regional economies on a predictable and long-term basis.’’ SAR 094. The SG allocates the lands under the NFP into one of seven different designations, each with its own authorized uses and practices.
. The Forest Service noted significant public concern over the “regeneration harvest” and explained:
Regeneration harvest should not be considered synonymous with "clearcuts” as seen on private lands ... The regeneration harvest units will leave more than the minimum retention required by the NWFP ... The treatments post harvest will be more like a shelterwood or seed harvest with both scattered and clumped residual trees left. This will allow for at least a two aged stand to develop into the future giving the stand more complex habitat structure. The increased habitat structure is an attempt to get a timber commodity out of the stand while still preserving some late successional characteristics that can possibly be utilized by late successional species in the future (>50 years). AR 15238.
. The Forest Service has noted the importance of reducing the wildfire fuels in the McKenzie Wildland-Urban Interface ("WUI”). The Forest Service further asserts
. The Forest Service's discussion of the fuels treatment in Riparian Reserves states that the "net result would be increased plant species and stand structural diversity, with a closer resemblance to historic stand condition than non-thinned plantations.” AR 13479.
. The Forest Service noted that all modifications were "within the range of effects analyzed in the EA” and included a no-harvest buffer to protect a maple grove in unit 420, а no-harvest buffer around a “special interest area” in unit 380, and a provision against cutting any tree greater than 36” in diameter within 350 feet of a private residential boundary. AR 15235.
. ACS Objective # 8 requires the agency to: Maintain and restore the species composi
. In fact, defendants here contend that plaintiffs' argument regarding compliance with ACS # 8 is a substantive claim which should have been brought under the NFMA. As the plaintiffs have not claimed a substantive violation of NFMA, however, this Court need only address whether the Forest Service disclosed the environmental consequences of its proposed actions as required by NEPA. For the reasons more fully explained in this opinion, this Court finds that the Forest Service has met NEPA's disclosure requirement and will not address the ACS Objectives as a substantive claim.
. The following factors are considered in evaluating intensity:
(1) Impacts that may be both beneficial and adverse.
(2) The degree to which the proposed action affects public health or safety.
(3) Unique characteristics ... such as proximity to ... park lands, prime farmlands, wetlands, wild and scenic rivers, or ecologically critical areas.
(4) The degree to which the effects ... are likely to be highly controversial.
(5) The degree to which the possible effects ... are highly uncertain or involve unique or unknown risks.
(6) The dеgree to which the action may establish a precedent for future actions.
(7) Whether the action is related to other actions with individually insignificant but cumulatively significant impacts.
(8) The degree to which the action may adversely affect [places/structures] listed in or eligible for listing in the National Register of Historic Places.
(9) The degree to which the action may adversely affect an endangered or threatened species or its habitat.
(10) Whether the action threatens a violation of Federal, State, or local law. 40 C.F.R. § 1508.27
. In addition, plaintiffs cite to the FWS's Revised Recovery Plan for the Northern Spotted Owl and its 2012 Draft EIS on the “Experimental Removal of Barred Owls to Benefit Northern Spotted Owls” in which the agency acknowledges the current uncertainties and the need for ongoing research regarding interspecies competition between the owls. Pis.’ Reply Mem. in Supp. of Mot. Summ. J. 21-22; AR 16348, AR 16350, AR 16424, AR 16593-17025.