Aрpellant-plaintiff was injured when she stepped into an uncovered sewer manhole which was located in the parking lot of a newly opened shopping center in Gordon County. She filed suit, alleging that appellee-defendants were jointly and severally liable for the injuries she had sustained. Appellant’s suit was brought in Fulton County, that being the county of residence of appellees JDN Construction Company (JDNCC) and JDN Enterprises, Inc. (JDNEI). Prior to trial, the trial court granted summary judgment in favor of appellee Bartow Paving Company (BPC), and appellant entered into a settlement agreement with JDNCC and JDNEI. Thereafter, appellees Bruce Shuler and the City of Calhoun (City), moved to transfer the action to Gordon County. The motion to transfer was denied and the case procеeded to jury trial in Fulton County. The jury returned verdicts in favor of Shuler and the City. In Case No. A92A1505, appellant appeals and, in Case Nos. A92A1506 and A92A1507, Shuler and the City cross-appeal.
Case No. A92A1506
In his cross-appeal, Shuler enumerates as error the denial of his motion for a direсted verdict. If meritorious, this enumeration would serve to moot the main appeal as to Shuler. Accordingly, we will address Shuler’s cross-appeal first.
1. Shuler was employed by the City to perform certain sewer line work which had been necessitated by the cоnstruction of the shopping center and parking lot. Shuler’s work was turned over to and accepted by the City in May of 1988. At that time, the manhole was on top of a stack which rose some 13 feet above grade. Although Shuler testified that, prior to turning his work over to the City, he had sealed the manhole with a traffic-bearing cover, there is at least some evidence that there was no manhole cover in place at the time the work was accepted by the City. Thereafter, filling of the site resulted in the grade being raised the 13 feet necessary to make it level with the top of the manhole stack. At that time, sоmeone other than Shuler placed a non-traffic-bearing cover on the manhole. BPC then paved the site *786 to serve as the parking lot for the shopping center. After the shopping center opened, the manhole cover broke and fell down into the manhole stack, apparently due to the weight of vehicles that it had not been designed to bear. Appellant fell into this uncovered manhole, some eight months after Shuler’s work had been turned over to and accepted by the City.
As a general rule, acceptance by the employer insulates an indеpendent contractor from liability for injuries subsequently resulting from his negligent performance of the contract.
Young v. Smith & Kelly Co.,
The first exception is where the work is a nuisance per se, or inherently or intrinsically dangerous. This exception “is applicable only where the work performed is
itself
inherently dangerous. [Cits.]” (Emphasis in original.)
Peachtree North Apts. Co. v. Huffman-Wolfe Co.,
Case No. A92A1505
2. At the jury trial, the settlement agreement that appellant had reached with JDNCC and JDNEI was admitted into evidence, with the amount of the settlement having been edited therefrom. Appellant enumerates as error the admission of the edited settlemеnt agreement.
Appellant’s settlement agreement with JDNCC and JDNEI was certainly not relevant to the City’s
liability.
That agreement did not evince that JDNCC and JDNEI were
solely
liable for appellant’s injury and that the City had
no
liability therefor. The agreement was, however, relevant to the extent of appellant’s potential
recovery
as against the City. An injured party can have but one satisfaction for his injuries.
Ford Motor Co. v. Lee,
In the instant case, the edited settlement agreement was obviously neither relevant nor admissible for the jury’s consideration under
either
option. Under the first option, limited disclosure of the
amount of
the settlement is authorized. Under the second option, disclosure of
no
portion of the settlement agreement is authorized. Here,
*788
the trial court disclosed all portions of the settlement agreement
except
the amount. The City has cited no case which is authority for the proposition that a settlement agreement from which the amount has been edited is relevаnt and admissible into evidence for any purpose whatsoever. Neither
Ford Motor Co. v. Lee,
supra, nor
Weaver v. Ross,
It follows that, in the instant case, the trial court erred in admitting the settlement agreement which had been edited to conceal the amount thereof. The effect of the trial court’s evidentiary ruling was to exclude the only potentially relevant portion of the settlеment agreement and to admit only the clearly irrelevant portions thereof. Under the first option, the amount of the settlement would have been relevant and admissible for the jury’s consideration on the limited issue of the extent of appellant’s recovery against the City. Under the second option, no portion of the settlement agreement would have been relevant and admissible for the jury’s consideration on the limited issue of the extent of appellant’s recovery against the City. There is no other option, whеreby all portions of the settlement agreement except the amount thereof would be relevant and admissible for any purpose whatsoever.
We cannot say that the trial court’s evidentiary error was harmless. Since the edited settlement agreement was admitted into evidence, the jury obviously considered it to be relevant for some purpose. As thе amount was not disclosed and the first option was not followed, the jury certainly could not have considered the evidence as relevant to the issue of the amount of appellant’s recovery. Instead, the evidence may well have erronеously influenced the jury on the issue of the City’s liability. A settlement would have no bearing on the liability of a non-settling alleged joint tortfeasor and is not evidence that the alleged negligence of the settling alleged joint tortfeasor is the sole proximate cause of the plaintiff’s injury. Nevertheless, the instant record dеmonstrates that, in his opening statement, counsel for the City asserted that appellant had already settled with the parties “that did the wrong” and that appellant had “nothing to lose” by proceeding against the City. Appellant was not entitled to a double recovery for her injury, but the City was not entitled to rely upon the settlement agreement as evidence that appellant was *789 making such an attempt. The burden was on appellant to prove the City’s negligence and if the appellant so proved, it wоuld be up to the City to establish a viable defense to its liability. Evidence that the negligence of JDNCC and JDNEI was the sole proximate cause of appellant’s injury would be such a viable defense. Appellant’s settlement with JDNCC and JDNEI would not be relevant to such a defense and, under the reсord, we cannot say that the jury did not erroneously conclude that it was relevant and that the verdict in favor of the City was not erroneously influenced by the evidence that JDNCC and JDNEI had already settled with appellant. Accordingly, the judgment in favor of the City must be reversed and a new trial held as to the City’s liability.
3. Appellant enumerates as error the grant of the City’s motion for a directed verdict as to its non-liability for punitive damages.
“Negligence, even gross negligence, is inadequate to support a punitive damage award. [Cit.]”
Colonial Pipeline Co. v. Brown,
4. Appellant enumerates as error the grant of BPC’s motion for summary judgment.
BPC did not construct the sewer line and did not place the non-traffic-bearing cover over the manhole. BPC merely paved the area after the sewer line had been constructed and after someone else had placed the cover over the manhole. There is no evidence that BPC knew or should have known that the cover was not appropriate. BPC’s expertise was in paving, not in sewer construction. There is no evidence that BPC performed its paving work negligently and the evidence shows that, after completion of the paving job, it was turned over and accepted. Under this evidence, the trial court correctly granted BPC’s motion for summary judgment. “[W]hеre a contractor who does not hold itself out as an expert in the design of work such as that involved in the controversy, performs its work without negligence, and the work is approved and accepted by the owner or the one who contracted for the work on the owner’s behalf, the contractor is not liable for injuries resulting from the defective design of the *790 work.” David Allen Co. v. Benton, supra at 558. BPC did not hold itself out as an expert in sewer work, it performed its paving work without negligence, the paving work was approved and aсcepted, and BPC cannot be held liable for appellant’s injuries resulting from the placement of the non-traffic-bearing cover over the manhole.
Case No. A92A1507
5. The City enumerates as error the denial of its motion to transfer the action to Gordon County.
At the commencement of the instant action, there was a basis for venue in Fulton County. JDNCC and JDNEI were residents of that county and the City was alleged to be a joint tortfeasor. Although appellant subsequently settled with JDNCC and JDNEI, there has been no finding that JDNCC and JDNEI are
not
liable to appellant. It follows that the trial court correctly denied the City’s motion to transfer the action to Gordon County.
Motor Convoy v. Brannen,
6. The judgment in Case No. A92A1506 is reversed with direction that the trial court enter judgment in accordance with Shuler’s motion for a directed verdict. The judgment in Case No. A92A1505 is affirmed as to BPC and as> to the City’s motion for a directed verdict on the issue of punitive damages, but reversed as to the City’s liability for compensatory damages with direction that a new trial be held as to that issue. The judgment in Case No. A92A1507 is affirmed.
Judgment reversed with direction in Case No. A92A1506. Judgment affirmed in part and reversed with direction in part in Case No. A92A1505. Judgment affirmed in Case No. A92A1507.