159 Mich. 42 | Mich. | 1909
This case was begun to recover damages for personal injuries sustained by the plaintiff December 16, 1904, by a fall caused by the breaking of part of a scaffold on which he was working for the defendant in the construction of storm windows in a church at Sandwich, Ontario. The plaintiff and the defendant are both residents of Detroit, where the latter is engaged in the manufacture of stained and other glass windows, and in setting them. The trial judge directed a verdict in favor of defendant. The case is brought here by writ of error.
The plaintiff is a lead glazier, and had been engaged in that trade for about a year previous to the time of entering
The defendant had a contract to put up some 22 large storm windows, and sent the plaintiff there with James Bracken, foreman in his business, who was in charge of the work. Later on Walters and one Bealer were sent over to help with the work. The work was going on for several days, when it was decided to put up a scaffold. It was the testimony of defendant that he and Mr. Bracken called at a lumber yard in Windsor, and the proprietor was told of the job at Sandwich, and “ that Bracken was going to look after it for me and to give him at the proper time whatever lumber he would require and charge it to me.” It is not admitted by plaintiff that any such conversation occurred, and complaint is made that the cross-examination of Mr. Halpin was cut short with an intimation from the trial judge that he was ready to instruct the jury about the material.
It is the claim of the plaintiff that, instead of new and suitable material being supplied, the planks which were used on the platform were taken from a pile of old planks that had previously been used for sidewalks, and that they were not suitable material for the construction of a platform. It was shown by the cross-examination of plaintiff that he assisted in bringing the planks from the
“The employer in this case provided material as I deem it, and an experienced foreman, a man of bright intelligence, and they were all very intelligent, all understood the English language. A lumber firm was instructed to supply the material, all that was needed, and the employer thereby did his whole duty.”
As before stated, a verdict was directed in favor of defendant. In doing this we think the judge erred. The case was one to be submitted to the jury under proper instructions. See 2 Labatt on Master & Servant, p. 1654; Lafayette Bridge Co. v. Olsen, 108 Fed. 335 (47 C. C. A. 367, 54 L. R. A. 33); Richards v. Hayes, 17 App. Div. 422 (45 N. Y. Supp. 234); Brown v. Gilchrist, 80 Mich. 56 (45 N. W. 82, 20 Am. St. Rep. 496); Morton v. Railroad Co., 81 Mich. 423 (46 N. W. 111); Tangney v. Wilson & Co., 87 Mich. 453 (49 N. W. 666); McIntyre v. Detroit Safe Co., 129 Mich. 385 (89 N. W. 39); McDonald v. Railroad Co., 132 Mich. 372 (93 N. W. 1041, 102 Am. St. Rep. 426).
It is suggested that the directed verdict should stand, though it should be found that the reason given by the judge for directing the verdict was not a good one, as under the law of Canada the plaintiff cannot recover. An answer to this suggestion is found in the fact that no proof was made in the lower court as to the law of Canada applicable to the case. See Jones v. Palmer, 1 Doug. (Mich.) 379; Crane v. Hardy, 1 Mich. 56.
Judgment is reversed, and new trial ordered.