| Me. | Dec 30, 1889

Foster, J.

On June 8, 1881, Owen B. Williams was the owner of the premises, land and water privilege about which this contention has arisen, situated upon Carleton stream in the village of Sangerville. Upon that day he conveyed by metes and bounds a specific part of the premises to the plaintiffs, and in the conveyance, immediately following the description of the boundaries, is this language: “Together with the Williams dam and all the water privilege of the Carleton Mill Stream, so called, for all the purposes of propelling a factory and its machinery and appurtenances to be built on said privilege, said factory building to be ninety-eight feet in length and forty-eight feet in width, with all necessary appurtenances and machinery for working the same up to its full capacity.”

Subsequently the plaintiffs built a woolen factory on the privilege conveyed by this deed, two stories high besides a basement, the main building being the same dimensions as that named in the deed. On the easterly side of the main building, but connected with it, a tower eighteen feet by twelve feet was erected, in which were the stair-ways to the main building, and an elevator operated by power from the factory wheel.

On the northerly end of the main building and connected with the same outside the ninety-eight feet in length, was erected an annex in which were placed the factory wheel, two pickers, a duster and a force pump, which were run by the factory wheel; also dye kettles, rinsing tubs, boiler to heat the factory, and chimney. The only wheel which run the factory was built under this annex.

The case shows that while the main building contained sufficient room for the wheel, pickers and duster, yet no more power was required to propel them in this annex than if located in the main building.

The points in controversy, so far as they are raised by the bill of exceptions, pertain to the legal construction of this deed, and may be determined by the answer to this single question:— *219Whether the language in the deed shall be construed to measure the quantity of water to which the plaintiffs are entitled, or to limit the use of water to carry only such machinery as may be in the main building.

The plaintiffs’ contention is for the former, — that the grant is of water sufficient or necessary to propel a particular factory, reference to the mill being made only to indicate and measure the quantity of power intended to be conveyed.

The defendants, upon the contrary, contend that the deed is to be so construed as to limit the power for the special purpose of propelling only such machinery as may be contained in the main building.

It is undoubtedly competent for the owner of the whole of a mill privilege to convey any part of the power he pleases and limit its use to any particular purpose which he may see fit to express in the grant and the other party is willing to accept. Where such purposes are plain from the terms of the conveyance, courts will so construe the contract as to carry into effect the expressed intention of the parties. Oftentimes, however, where such rights are derived solely from grant, particularly where they are a part only of a larger wafer power, it is a question of some difficulty in construing the grant to determine whether the power granted was intended to be applied to a specific use only, or whether a reference to the purposes named in the grant was made for the sole purpose of defining and measuring the quantity of power granted. If the parties from the terms of the grant have left it doubtful whether the kind of mill or particular machinery inentioncd indicates the quantity of water and measures the extent of the power intended to be conveyed, or is referred to as a limit of the use to the particular kind of mill, or specified machinery, the former construction will be favored as being more favorable to the grantee, more for the general interest of the public, and as being more probably the intention of the parties. This is the general doctrine adopted by the courts and adhered to in grants of this nature whenever the description of the rights conveyed is in such terms as to leave it in doubt which of these two kinds or species of grants was intended. Deshon v. Porter, *22038 Maine, 289, 293; Pratt v. Lamson, 2 Allen, 275; Tourtellot v. Phelps, 4 Gray, 370, 374; Ashly v. Pease, 18 Pick. 268, 275 ; Covel v. Hart, 56 Maine, 518.

In this case the court instructed the jury that the “plaintiffs’ rights are not confined to such machinery alone as they might put into the main building, for the true construction of that deed does not restrict the water to such machinery as is in there, but the language of the deed is simply used to express the measure of the water to which they are entitled.”

This instruction we think presented the law correctly to the jury. In construing the plaintiffs’ deed from Williams the intention of the parties must first be sought from the language of the deed, taken in connection with the situation of their business, the subject matter to which it relates, and the object to be obtained. Sumner v. Williams, 8 Mass. 162" court="Mass." date_filed="1811-10-15" href="https://app.midpage.ai/document/sumner-v-williams-6403767?utm_source=webapp" opinion_id="6403767">8 Mass. 162; Deshon v. Porter, supra.

When we consider, therefore, the objects and purposes for which the power was granted, we think it clear that the language of the deed does not restrict the grantees to the use of the water for the specific purpose of propelling such machinery only as might be in the main building, but that by the terms of the deed, so far as they relate to the machinery to be used in a factory of the dimensions named, the intention was to describe the quantity of water the use of which is thereby conveyed. Hence, if some of the machinery required in a factory like this is located in an annex instead of being in the main building, and no more power is required to propel it than if it were situated in the main building, -it would certainly be within the terms of the plaintiffs’ deed.

The power intended to be conveyed, as expressed in the deed, is “for all the purposes of propelling a factory and its machinery and appurtenances” essential to the successful operation of a building of the size mentioned in the terms of the grant, “with all the necessary appurtenances and machinery for working the same up to its full capacity.”

The annex and tower situated upon the plaintiffs’ land and thus connected with the factory building proper, considering the nature of the grant and the purposes to which the power was to be applied, may properly be considered as embraced within *221the terms of the deed. The case discloses the fact that there was sufficient room in the main building for such machinery as was placed within this annex. If, therefore, the plaintiffs considered it for their interest or convenience to place some portion of the machinery necessary to the operation of their factory in this separate apartment, provided no more power was required to operate it than if it had all been under the same roof, they had a right soto do. The instructions of the court to which exceptions are taken were in accordance with the views we have here expressed, and were therefore correct.

Nor were the defendants’ rights affected by the refusal of the court to instruct the jury that the plaintiffs could not operate the factory more than a reasonable time, and that ten hours a day through the year is a reasonable time. The plaintiffs’ rights are not thus circumscribed. It is expressly stated that the plaintiffs “have the first right to, and control of, all the water in said stream at the said dam and privilege at all times and seasons of the year for propelling their said factory and machinery for the factory building as before described.” Having the right to the use of the water for the purposes of their factory at all times and seasons of the year, they ha.d a right to run their factory as many hours a day as they considered proper. Their deed contains no limitation upon the number of hours out of the twenty-four each day in which they can ran their factory. It is not for the court to restrict the time when the factory shall be operated when the parties have not seen fit to do so.

JSxceptiom overruled.

Peters, C. J., Danforth, Virgin, Libbey and Emery, JJ., concurred.
© 2024 Midpage AI does not provide legal advice. By using midpage, you consent to our Terms and Conditions.