MEMORANDUM OPINION
Plаintiffs Canadian Commercial Corp. (“CCC”) and Orenda Aerospace Corp. (“Orenda”) (collectively “plaintiffs”) filed this “reverse FOIA” action on July 14, 2004, seeking to enjoin defendant Department of the Air Force (“defendant” or “Air Force”) from releasing to a competitor,
*17
Sabreliner Corporation (“Sabreliner”), certain financial data submitted by plaintiffs in connection with a bid for a contract to provide
J85
turbojet
engine repair
and maintenance services. Plaintiffs challenge defendant’s administrative decision to release the information in response to Sa-breliner’s request under the Freedom of Information Act (“FOIA”), 5 U.S.C. § 552, as a violation of the Administrative Procedure Act (“APA”), 5 U.S.C. § 706(2)(A), (C). Specifically, plaintiffs submit that the information sought by Sabreliner is exempt from disclosure under 5 U.S.C. § 552(b)(4) (“Exemption 4”) and
McDonnell Douglas v. Air Force,
FACTUAL BACKGROUND
On January 16, 2002, the Air Force issued a solicitation for the performance of maintenance and repair work on J85 turbojet engines (“solicitation”). Admin. Rec. Exh. 15. Plaintiff Orenda submitted a proposal through plaintiff CCC, in accordance with the Federal Acquisition Regulations (“FAR”). Pl.’s Stmt, at 2 ¶2. The solicitation stated that responders were “requested” to submit certain pricing information, and that a failure to do so could result in the proposal’s disqualification. See Admin. Rec. Exh. 28 at § 1.0. By law, the government is required to consider price when it decides which proposal to accept. See Admin. Rec. Exh. 14 at 8 (citing FAR §§ 15.304(c)(1), 15.101). Plaintiffs’ proposal contained dеtailed pricing information for the base year of the contract in addition to five subsequent option years. Plaintiffs submitted a formal offer on March 4, 2002. See Admin. Rec. Exh. 5 at 1. At this time, Sabreliner also submitted an offer in response to the solicitation, PL’s Stmt, at 2 ¶ 3, but the Air Force awarded the contract to plaintiffs on May 7, 2002, see Admin. Rec. Exh. 15.
Although the contract is between CCC and the Air Force, CCC contracted its duties to Orenda, such that Orenda performs the actual labor. PL’s Stmt, at 2 n. 1. The contract has a base term of three years and four option years, over which time plaintiffs agreed to repair, overhaul, and modify J85 turbojet engines. Admin. Rec. Exh. 15; PL’s Stmt, at 2-3 ¶ 4. The contract expressly incorporated the pricing information (for both the base term and the subsequent option years) by reference to Orenda’s original proposal. Admin. Rec. Exh. 15. Plaintiff Orenda began performing under the terms of the contract, and continues to do so today (the contract expires in 2008). PL’s Stmt, at 2 ¶ 5.
Sabreliner contested the contract award before the General Accountability Office (“GAO”) and sought to gain access to plaintiffs’ detailed pricing information. PL’s Stmt, at 3 ¶ 6. During the bid protest, Sabreliner’s attorneys were permitted to review the information, but Sabreliner itself was screened from it. Id. Ultimately, Sabreliner’s protest of the contract award was unsuccessful. Id. On September 12, 2003, Sabreliner filed a FOIA request with the Air Force. Admin. Rec. Exh. 1. The FOIA request sought release of the contract and all orders and modifications to it. Id. The Air Force notified plaintiffs of Sabreliner’s request, asking them to review all of the pricing information and stated subcontracting goals attached to the contract in order to determine whether Sabreliner’s request sought protected trade secret, commercial, or financial infor *18 mation. Admin. Rec. Exh. 2. Plaintiffs were directed to identify any particular information that they sought to protect from disclosure, and to provide evidentiary support and detailed analysis to assist the Air Force in determining whether the information came within any FOIA exemptions. Id. In response, Orenda submitted three documents — an opposition letter dated November 13, 2003, Admin. Rec. Exh. 7 at 2-12; a clarification letter dated December 3, 2003, Admin. Rec. Exh. 9 at 2-3; and a supplemental letter dated January 23, 2004, Admin. Rec. Exh. 9 at 8-11. Together, Orenda submits that those filings proffered “several layers of clear and robust arguments against disclosing its information to [Sabreliner]Pl.’s Stmt, at 15 ¶ 30.
I. Orenda’s First Submission: Opposition Letter of November 13, 2003
In its initial opposition, Orenda sought to protect four categories of cost and pricing information from disclosure: (1) “[a]ll line-item price and price-related information under [the current contract]”; (2) “[a]ll line-item price and price-related information contained in every option year Exhibit (Exhibits A to E)”; (3) “[a]ll Fixed Hourly Labor Rates for Over and Above Prices”; and (4) “[a]ll cost, price, and price-related information contained in Or-enda’s Subcontracting Plan.” PL’s Stmt, at 9 ¶ 20. In order to provide guidance and clarity for the Air Force, Orenda appended redacted materials to its opposition letter, and stated that it found “no legal authorization for disclosure of such information ... [which] is expressly prohibited by federal law.” PL’s Stmt, at 9-10 ¶21. A redacted copy of the contract was also attached, in order to show the Air Force which pricing information was allegedly exempt. Id; see also Admin. Rec. Exh. 7. In a nutshell, Orenda claimed that the line-item unit and other pricing information was protected by the TSA, could be withheld from disclosure pursuant to Exemption 4 of FOIA, and was not authorized for release by FAR or any other provision of law. Admin. Rec. Exh. 7 at 2.
Orenda argued that although §§ 15.503 and 15.506 authorize the general disclosure of unit price information, both provisions protect that information if it is “confidential, trade secret, or otherwise exempt under Exemption 4 [of FOIA].” Id. According to Orenda, the information at issue qualifies as confidential, trade secret, and exempt under Exemption 4, which allows the government to withhold information in response to a FOIA request if it is “commercial or financial” and “privileged or confidential.” Admin. Rec. Exh. 7 at 3. Orenda claimed that the information was privileged and confidential because it was submitted voluntarily — defendant’s solicitation did not require the information— and Orenda continuously represented the sensitive and confidential nature of the information, informing the Air Force that only certain persons were authorized to review the information and including a confidentiality footer on the cover page of the submission. Pl.’s Stmt, at 15-16 ¶¶ 30-31; 5-6 ¶ 14. Because the information is of a type that “would not customarily be released to the public by the person from whom it was obtained,” see Pl.’s Stmt, at 15-16 ¶ 30, Orenda continued, Exemption 4 justified its nondisclosure.
In the alternative, Orenda argued that even if the submission was involuntary, the information would still be privileged and confidential because its release was likely to seriously impair the Air Force’s ability to obtain necessary information in the future. PL’s Stmt, at 6 ¶ 15. Specifically, disclosing this type of information would allegedly deter competitors from bidding on future solicitations, which would com *19 promise the quality of goods and services performed — as well as the integrity and fairness of the bidding process — by undermining the government’s “fundamental policy of open competition.” Pl.’s Stmt, at 6-7 ¶¶ 16-17; 15-17 ¶¶ 29, 31-33. Additionally, Orenda anticipated that its competitive advantage would be substantially undermined by the release of the information because Sabreliner — and other companies with whom Orenda competes on the open market — would be able to reverse-engineer Orenda’s pricing formulae, ascertain its pricing strategy, “raid its subcontractor portfolio,” and undercut its future bids. PL’s Stmt, at 7-8 ¶ 18; 15-17 ¶¶ 31-33. Because the TSA protects proprietary information that comes within the ambit of Exemption 4, Orenda further asserted that the Air Force was actually prohibited by law from disclosing this information to Sa-breliner. Pl.’s Stmt, at 9 ¶ 19.
II. Orenda’s Second Submission: Clarification Letter of December 3, 20031 1
The Air Force then asked Orenda on November 24, 2003 to clarify the scope and application of its objections. Within two weeks, Orenda submitted the December 3, 2003 “opposition clarification” letter. Admin. Rec. Exh. 8. This time, Orenda described the material it sought to protect as “commercially sensitive information,” Pl.’s Stmt, at 10 ¶ 22, which
specifically means all cost and pricing figures, including, but not limited to, all current and projected line-item prices, all fixed hourly labor rates for its over and above prices, all pricing and price-related information contained in its subcontracting plan, and all other information contained in any relevant document that could be used to derive this cost and pricing information.
Admin. Rec. Exh. 9 at 1-2. Orenda concluded by referring the Air Force to the redacted versions of Exhibits A — E, and including redacted versions of the contract modifications that contained commercially sensitive material. Id.
III. Orenda’s Third Submission: Supplement of January 23, 2004
On January 23, 2004, Orenda sent a third letter to further supplement the initial opposition and subsequent clarification. See Pl.’s Stmt, at 11 ¶24; Admin. Rec. Exh. 9, Orenda Opp’n Suppl., at 1-2. The supplement focused on Orenda’s previous contentions that the release of the pricing information would cause substantial competitive harm, would damage the Air Force’s future efforts, and would endanger the integrity of the procurement system. See Pl.’s Stmt, at 11 ¶ 24; Admin. Rec. Exh. 9, Orenda Opp’n Suppl., at 1-2. A memorandum from John Bayley, Orenda’s Director of Operations, was appended to this supplemental submission (“Bayley Memorandum”). Pl.’s Stmt, at 11 ¶ 25; Admin. Rec. Exh. 9, Orenda Opp’n Suppl., at 1-2. The purpose of the Bayley Memorandum was to explain and detail, by way of example, the process through which Sabreliner, with knowledge of the information that is the subject of the FOIA request, might reverse-engineer Orenda’s costs and prices. PL’s Stmt, at 11 ¶ 25; Admin. Rec. Exh. 9, Orenda Opp’n Suppl., at 2.
Specifically, the Bayley Memorandum claimed that once Sabreliner received the information at issue, it could calculate three key components of Orenda’s confidential , pricing strategy — its fully-burdened labor rate, its material mark-up, and *20 its pricing for J85 engine repair services (which, according to Orenda, is unique in the industry). PL’s Stmt, at 11- — 14 ¶¶ 25-27; Admin. Rec. Exh. 9, Orenda Opp’n Suppl., at 1-3. The Bayley Memorandum asserted that the slightest disclosure of its pricing and cost information would enable Sabreliner (and possibly other companies with whom Orenda competes for contracts on the open market) to wreak devastаtion upon its competitive position with respect to both current and future contracts. PL’s Stmt, at 14-15 ¶ 28; Admin. Rec. Exh. 9, Orenda Opp’n Suppl., at 3-4.
The supplemental submission also noted that Mr. Paul D. Ford, the former Chief of the Tactical/Trainer/Specialty Engine Branch OC-ALC/LPEA for the Air Force, had retired and joined a subsidiary of Sa-breliner. PL’s Stmt, at 15 ¶ 29; Admin. Rec. Exh. 9, Orenda Opp’n Suppl., at 3-4. Orenda informed the Air Force that in his current capacity, Mr. Ford was responsible for the direct oversight of J85 program managers and that he also acted as an advisor to the source-selection team with respect to the very contract that the Air Force awarded to Orenda. PL’s Stmt, at 15 ¶ 29; Admin. Rec. Exh. 9, Orenda Opp’n Suppl., at 3-4. Orenda also represented that Mr. Ford had probably seen its pricing information while in the government, and opined that, based upon Mr. Ford’s understanding of the dynamics of the industry, any further exposure to its cost and pricing information would enable him to deduce Orenda’s labor costs, material charges, and key pricing strategies. PL’s Stmt, at 15 ¶ 29; Admin. Rec. Exh. 9, Orenda Opp’n Suppl., at 3-4.
IV. The First Air Force Decision Letter
On July 1, 2004, the Air Force informed plaintiffs that it intended to release the requested information to Sabreliner. Admin. Rec. Exh. 10 at ¶ 1. The four-page decision letter first stated, without any analysis or rationale, that Orenda was required to submit the information with its proposal. Id. at ¶ 2. The information was, in the Air Force’s view, therefore subject to the more stringent test for involuntarily-submitted information, which requires that disclosure of the information be shown to pose a likelihood of either: (1) impairment to the government’s ability to obtain necessary information in the future, or (2) substantial harm to Orenda’s competitive position. Id. As to the first possibility, the Air Force dismissed plaintiffs’ arguments solely by relying upon its “experience in government contracting” — no analysis was provided, and defendant never described that expertise. Id.
On the likelihood of substantial competitive harm aspect, the Air Force stated that to “undercut” or “ratchet down” Or-enda’s prices effectively, competing firms would have to “predict Orenda’s proposed price on future transactions with some degree of precision.” Id. at ¶ 2(a). The Air Force again relied upon its “experience in government contracting,” stating that this experience led it to believe that past and present prices are imprecise predictors of future prices because variables like “economic uncertainty, changes in technology, work requirement, productivity and bargaining power all frustrate attempts to accurately predict prices over time.” Id. Hence, in the Air Force’s view, “the likelihood of competitive harm due to undercutting or ratcheting down is not substantial.” Id. (emphasis added). Moreover, the Air Force claimed that even if some undercutting or ratcheting-down were to occur, the harms would be mitigated because “price is just one of many factors considered.” Id. Orenda’s fear that a competitor could submit an unsolicited proposal in an attempt to persuade the government not to exercise the option year provisions was unfounded, the Air *21 Force continued, for two reasons: (1) FAR §§ 2.101 and 15.6 place certain restrictions on the submission of “ ‘new and innovative’ idea[s]” to the government; and (2) FAR §§ 17.207(d) and (e) do not permit the government to rely on price alone when “other factors,” including the government’s need to continue operations and the significant transaction costs associated with disruрting engine repair operations, are to be considered. Id.
With respect to Orenda’s argument that competitors could “reverse-engineer” cost and pricing strategies, and thereby “peer into its financial structure,” id. at ¶20)), the Air Force concluded that the examples in the Bayley Memorandum did not adequately illustrate how this could be done. To begin with, the example regarding calculation of Orenda’s fully-burdened labor rate was “presumptive,” in the Air Force’s view, because it assumed that the number of hours required to perform the work was a known variable. Id. at ¶ (2)(b)(l). In the Air Force’s words,
[t]wo separate repair contractors may use different approaches to arrive at significantly different hours to repair [the same] item. A multitude of factors, such as risk assessment, production capacity, repair methods, skill mix and level of employee experience, to name a few, could result in significant differences in the number of hours. Even for this ‘simple’ case that uses small numbers, a scant one half hour increase in the number of hours estimated to repair [the item], even when a unit price of the repair is known, results in the fully burdened labor rate being more than eight dollars ... lower.
Id. Hence, the Air Force concluded that Orenda’s example actually illustrated that “a competitor using the ‘divined’ burdened labor rate would be unlikely to harm the competitive position of Orenda, potentially resulting in just the opposite,” and noted that the potential for difference would be even larger when other factors, including type and sophistication of the equipment involved, were properly introduced into the assessment. Id. Moreover, the Air Force cоntinued, the potential for uncertainty is exacerbated when one takes account of the fact that one contractor might determine that an item simply needs to be repaired, while another might decide that it needs to be overhauled, requiring more labor and material input. Id. Hence, the Air Force concluded that it “would be virtually impossible for a competing contractor to ascertain the number of hours for the more complex, high volume [items] on this contract. The likelihood of competitive harm to Orenda is [therefore] not substantial.” Id.
The Air Force found that a second example selected from the Bayley Memorandum (focusing on the ability of a competitor to calculate Orenda’s material markup) suffered from the same types of deficiencies: it assumed that the number of hours and the fully-burdened labor rate were a known and reliable figures; it “fail[ed] to address other variables, such as quantity discounts and bargaining power;” and it ignored the more complex [items] requiring “more complex and costly material.” Id. at ¶ 2(b)(2). According to the Air Force, Orenda also “provid[ed] no discussion or example of how a competitor could ascertain sensitive cost or pricing information, such as G[eneral] & Administrative expense] or profit rates from the unit prices.” Id. at ¶ 2(b)(3). The discussion closed with a repetition of the previously-stated conclusion that “the likelihood of competitive harm is not substantial” because: (1) “[t]here are simply too many unascertainable variables to allow competitors to predict Orenda’s future pricing and strategies based on release of these unit prices;” and (2) “the effect of undercutting *22 or ratcheting down would be diluted” as a result of the fact that “price is just one of many factors considered.” Id. at ¶ 2(b)(4).
Finally, the Air Force dismissed Oren-da’s argument regarding its unique pricing strategy on the basis that “Orenda has not shown [its] approach is unique ... nor can [it] show any evidence or example to support [the] claim ... that ‘this is not the pricing structure employed by our competitors in J85 engine and maintenance work.’ ” Id. at ¶ 2(c). Moreover, the Air Force asserted that Orenda “has not shown a competitor could deduce .,. Or-enda’s approach by simply reviewing Or-enda’s unit prices ... [the] argument is speculative and inadequately supports [the alleged] conclusion.” Id. Defendant also disposed of Orenda’s fears regarding Mr. Ford, stating that, notwithstanding Oren-da’s contentions, there was “no reason to believe this employee accessed Orenda’s sensitive cost and pricing information. Even if he did, release of these contract unit prices would not broaden the scope of his understanding of Orenda’s sensitive cost and pricing information.” Id. at ¶ 2(d).
V. This Action
Plaintiffs filed this reverse-FOIA action following their receipt of the Air Force’s first decision letter. Shortly thereafter,
McDonnell Douglas,
VI. The Second Air Force Decision Letter
On July 19, 2005, just before filing the Administrative Record, the Air Force issued a second decision letter that contained a much more detailed analysis than the first. See Admin. Rec. Exh. 14. The conclusion, however, was unaltered. The Administrative Record included this second decision letter, as well as a new written submission made by plaintiffs (at the Am Force’s request) before the second decision letter was issued. See Admin. Rec. Exhs. 13,14.
The second decision letter opens with a lengthy (though rambling) discussion of the history of government contracting and the passage of FOIA, through which the Air Force claims to establish that because contract prices “were releasable prior to *23 enactment of FOIA,” and “FOIA’s enactment did not change the release requirement for contract prices,” such information falls “outside the scope of FOIA exemption (b)(4).” Id. at 2-4. The Air Force then discusses the scope of the TSA and how it relates to contract award prices, arguing that the plain language of the TSA does not encompass contract prices. Without relying on any authority from the FOIA context, the Air Force sets forth a two-pronged legal calculus for the TSA under which it must consider “1) whether the information falls within the plain terms of any category listed in the TSA prohibition as understood by ordinary people and 2) if so, whether disclosure of the information is otherwise authorized by law.” Id. at 4. Before this standard is applied to the information at issue, however, the decision letter embarks on a review of Supreme Court precedent that examines the TSA in light of its character as a criminal statute. See id. at 4-5. 2
According to the Air Force, “ ‘ordinary people’ would not find the ‘plain terms’ of any category of information identified in the TSA to include [plaintiffs’] sales prices or government contract prices.” Id. at 5. The Air Force quotes from the legislative history of FOIA, detailing a congressman’s difficulty in obtaining information about the contract prices of unsuccessful competitors: “[t]he Committee believes the trade secrets statute ... neither applies to [this] information ... nor justifies a general rule against releasing all information submitted by unsuccessful offerors on negotiated procurement.” H.R.Rep. No. 87-818, at 43 (1961). Based on this language, the Air Force concludes that “[l]ogic dictates that contract award prices of the successful offeror must be outside the scope of the TSA” and that “contract award prices do not fall within any category of information listed in TSA.” Id.
The next step in the Air Force’s analysis considers whether disclosure of the information is authorized by law, which would strip away any protection that the TSA might arguably otherwise provide. The Air Force quotes from four FAR provisions that it contends authorize the disclosure of contract unit prices, stating that
FAR § 15.503(b)(iv) requires as sрecific government-wide procurement policy that all contract award unit prices “shall” be made publicly available upon request. FAR §§ 15.503(B)(l)(iv) and 15.506(d)(2) require as specific government-wide procurement policy that competitors “shall” be provided all contract award unit prices. FAR § 5.303(b)(2) requires as specific government-wide procurement policy that, if an agency elects to make local announcement to the media at award, contract award unit prices “shall” be included in such local public announcement of a negotiated procurement. FAR § 3.104-2(b)(4) makes clear that OFPP took TSA into account when OFPP promulgated these mandatory requirements to disclose contract award unit prices.
Id.
at 6. The Air Force concludes this discussion with a statement that because the FAR provisions meet the test set forth in
Chrysler Corp. v. Brown, 441
U.S. 281,
The remainder of the decision letter primarily addresses the arguments advanced by plaintiffs in their written submissions, as well as the Bayley Memorandum.
See id.
at 7-25. Here, thе Air Force summarily dismisses plaintiffs’ argument that FAR does not authorize disclosure of the information based upon the fact that the case plaintiffs rely upon,
MCI Worldcom, Inc. v. GSA,
Next, the Air Force concludes that the information was provided involuntarily because the contract at issue “is a requirements contract, which means that the government would be billed under the contract using delivery orders that vary in amount depending on the type and amount of work to be done ..., [and r]e-view of unit prices under the contract is essential in evaluating the proposals for this contract,” and because FAR § 15.101 requires the government to consider price when “determining which offer constitutes the best value.” Id. at 8. Hence, the Air Force analyzes whether the information is “privileged or confidential” within the meaning of Exemption 4 by using the Nat’l Parks I standard for information that has been involuntarily provided. Id. Here, plaintiffs had argued that impairment of the government’s ability to obtain information in the future counseled against disclosure. But the Air Force asserts that the government, not plaintiffs, is in the best position to determine whether its interests would be harmed in this manner, and finds that it was unlikely that such impairment would result because “[pjrocurement regulations have required the disclosure of contract award unit prices to competitors since the late 1950s” and it has observed no “impaired competition in negotiated procurements in the over 45 years” since that time, nor does it have any reason to “forecast such harm in the future.” Id.
The Air Force then considers the likelihood of substantial competitive harm to plaintiffs, purportedly under
Nat'l Parks & Conserv’n Ass’n v. Kleppe (“Nat’l Parks II”),
The Air Force then proceeds to deconstruct ¶¶ 6-9 of the Bayley Memorandum. See id. at 10-15. According to the Air Force, plaintiffs failed to provide evidence that the government has ever chosen not to exercise an option in any of plaintiffs’ prior contracts, or that there is a general practice of not exercising such options in “this type of contracting activity.” See id. at 10-11. Options are, the Air Force asserts, “regularly and routinely” exercised “unless funds are not available to fund the requirement or the incumbent’s performance was less than satisfactory. The latter circumstance would be undertaken only when that course would be more advantageous than termination for either convenience or default.” Id. at 11. In essence, market conditions would have to be “so favorable that they would outweigh the nеed for continuity of operations, potential costs of disrupting operations, and the risk that recompetition would not be overall advantageous to the government.” Id. Relying on past practice, the Air Force concludes that it is likely that options will continue to be regularly exercised due to “1) the likelihood that the original competition resulted in all offerors offering their best prices at the time of contract award and 2) the uncertain benefit of re-competition.” Id. Hence, the Air Force asserts that plaintiffs did not carry their burden to establish that competitors could persuade the government not to exercise the options and instead to recompete the contract. Furthermore, any such unsolicited proposal “based on price alone ... does not meet the definition of ‘unsolicited proposal’ in FAR 2.101 Subpart 15.6 .... [and] could not be considered by the government.” Id.
Addressing plaintiffs’ argument that disclosure would permit competitors to undercut prices in the future, the Air Force concluded that because the option year pricing information essentially forecasts what the prices will be based upon a multitude of factors (including then-current costs and cost estimates) that existed in 2002 (when the forecasts were made), it is unlikely that competitors would be able to calculate what the prices would actually be some three to seven years later, when those factors and considerations may be markedly different. See id. at 11. To the Air Force, plaintiffs had not demonstrated how, in light of the complexity and precision required for such calculations, it was likely that competitors could “aсcurately duplicate the myriad of considerations and factors ... used to calculate any of [the] option year prices for any line item, or know how well the models ... used to calculate ... [them] tracked actual economic conditions to any particular point in time in the future.” Id. at 12. The prices that plaintiffs would actually offer in the future would, in the Air Force’s view, be based on their actual costs at that time and projections of “changes in costs and economic and market circumstances over the period of the anticipated contract ... [as well as] current micro-economic cir *26 cumstances and ... business circumstances and goals (including risk assessment and profit needs) at that time.” Id. at 12.
The Air Force similarly dispensed with plaintiffs’ “reverse-engineering” argument, finding that “line item prices established in 2002 cannot be dismantled by a competitor to determine each of the components that go into setting each of those prices. The components of the unit prices contain information that is known only to [plaintiffs].” Id. By the same logic, the Air Force continued, competitors would be unable to take the prices for the contract term, which were developed in 2002, and use them alone or in combination with option year prices to estimate the price of an item that would be provided at some unidentified future point. Id. “The actual costs at any point in the future,” the Air Force opines, “will almost invariably vary from your projections because of the myriad of variables that impact any particular price computation over time.” Id. Relying once again on its experiencе, the Air Force further states that the
government has not been able to predict prices for any of the requirements specified in any of the line items or for items similar to those covered by these line items with any degree of accuracy. Nor has the government been able to discern the final negotiated prices in most current negotiations based on procurement history and market research .... despite the many pricing specialists hired to assist contracting officers in the acquisition process.
Id. at 13. From its discussion of plaintiffs’ argument that disclosure would permit competitors to undercut or undermine other contracts with commercial partners, it is evident that the Air Force did not fully comprehend the points advanced in the Bayley Memorandum and written submissions. See id. at 13-15. As a consequence, the discussion simply articulates points of confusion — specifically with respect to who or what constitutes a “commercial partner” — and concludes that the confusion results from plaintiffs’ failure to carry its evidentiary burden. See id. The Air Force also reiterates arguments made in the first decision letter with respect to the likelihood that disclosure would reveal plaintiffs’ pricing strategy, permit competitors to calculate material markups or fully burdened labor rates, or threaten the integrity of the contracting system. Specifically, the Air Force repeats that the examples contained in the Bayley Memorandum are insufficiently complex, too speculative or conjectural, and improperly assume that the requirements of all customers — and the assessments of all competing firms— would be the same. See id. at 17-22.
As for the harm that plaintiffs allege will befall the Ah- Force and the integrity of the contracting system, the Air Force claims that because such harms concern its own interests, ib — not plaintiffs — can best judge whether such harms exist, and in its experience they do not. See id. at 17-21. The Air Force asserts that companies often make use of several different pricing strategies at different times, and plaintiffs had failed to provide evidence of how competitors could possibly ascertain which pricing strategy was being used in connection with a given product or service at a particular time. Furthermore, the Air Force claims that, based upon the detailed requirements of the solicitation with respect to pricing, it would have been impossible for plaintiffs actually to employ the “modular” strategy that they identified. See id. at 22.
Of the twenty-six repetitious pages in the second decision letter, only three and a half even purport to address McDonnell *27 Douglas. Primarily, the Air Force interprets that case as holding that
exemption (b)(4) establishes only the boundary of commercial information that the government is not required to disclose under FOIA, but ... the government is only required to withhold such commercial information if it also falls within the TSA prohibition.... The scope of exemption (b)(4) falls totally within the scope of TSA, which means that [plaintiffs] must demonstrate that these contract prices fall within ‘plain terms’ of a TSA category as understood by ‘ordinary people’ in order for those prices to fall within exemption (b)(4).
Id. at 15. The Air Force also relies on McDonnell Douglas to conclude (correctly) that “[w]hether any of the contract prices at issue must be withheld turns on the particular facts of this case,” id. at 23, but spends the majority of its discussion attempting to draw very fine distinctiоns between McDonnell Douglas and this case (apparently attempting to limit McDonnell Douglas to its precise set of facts). See id. at 23-24. For example, the Air Force claims that McDonnell Douglas is distinguishable because those plaintiffs did not attempt to prevent the Air Force from releasing all of the pricing information— they only sought to preclude the release of some of the information. Id. at 23. Moreover, according to the Air Force, the level of detail used to describe the alleged harms and to link harms to specific types of information was greater in McDonnell Douglas. Id. The Air Force then rejected plaintiffs’ interpretation of McDonnell Douglas, characterizing it as an attempt to establish a per se rule against disclosure of pricing information in all circumstances— which McDonnell Douglas itself rejects. Id. at 24, 25. In the Air Force’s view, “the McDonnell Douglas holding dealing with unexercised option year prices [cannot be used] as a rule of general applicability” and the evidentiary support for each argument raised by plaintiffs must instead be analyzed “in accordance with the criteria set forth in Nat’l Parks II, Public Citizen, and Toyota.” Id. at 24. The Air Force also appears to assert that McDonnell Douglas was incorrectly decided because the D.C. Circuit did not consider the legislative history of Exemption 4 or the mandates of the allegedly relevant FAR provisions, even going so far as to suggest that the court misunderstood the requirements that apply in the context of negotiated solicitations. See id. at 24-25.
ANALYSIS
I. Which Decision Letter Constitutes the Administrative Decision Under Review?
A court “should have before it neither more nor less information than did the agency when it made its decision.”
IMS, P.C. v. Alvarez,
Although this issue usually arises in the context of counsel’s attempt to justify a less-than adequate agency decision, it applies with equal force to additional agency action following a decision because a
post hoc
rationalization is simply defined as one that “seek[s] to defend past agency action against attack.”
See Auer v. Robbins,
The second decision letter in this case could exemplify the type of agency action that is usually characterized as a
post hoc
rationale. To begin with, it reads like a litigation brief — indeed, even a cursory comparison of the second decision letter and the Air Force’s opposition memorandum suggests that the former was the first draft of the latter. Moreover, the second decision letter clearly seeks to defend, and cure any inadequacies in, the first decision letter.
4
See Collagenex Pharms., Inc. v. Thompson,
But the issue is not quite so simple. Following the stay of proceedings, plaintiffs submitted a written document, albeit at the Air Force’s invitation, in advance of the second decision letter. Specifically, on July 8, 2005, plaintiffs tendered a “Supplemental Submission” (which they were “pleased” to make) that outlined substantive arguments against disclosure and stated that plaintiffs “look[ed] forward to resolution of th[e] issue.” Admin. Rec. Exh. 13 at 1, 3. Indeed, plaintiffs have acknowledged that the Supplemental Submission was intended to help the Air Force appreciate the impact of McDonnell Douglas upon its earlier determination. It is clear, *29 then, that plaintiffs sought to have the earlier determination reversed and expected to hear from the Air Force in that regard, and are now simply dissatisfied with the Air Force’s decision. Having acquiesced in the reconsideration of the earlier decision, plaintiffs cannot now claim that such reconsideration was improper. Accordingly, the Court will review the post-McDonnell Douglas decision letter under the APA.
The question that remains is whether the Court is armеd with an adequate record upon which to engage in a reasoned, detailed analysis of the pertinent agency decision. In their opening brief, plaintiffs chose to focus only on the arguments in the first decision letter. Naturally, the Air Force’s opposition memorandum largely relied upon the better-articulated rationale supplied by the second decision letter. Plaintiffs’ reply, however, did address the arguments raised in the Air Force’s opposition memorandum, which mirrors the second agency decision letter. Moreover, the Court has subsequently given plaintiffs two additional opportunities — through oral argument at the motions hearing, and through additional briefing ordered thereafter — to focus on the sufficiency of the Air Force’s rationale as expressed in the second decision letter. Hence, the record is adequate to enable the Court to assess the relevant agency decision.
II. Is the Material at Issue Exempt Under Exemption 4 of FOlA?
Exemption 4 permits the government to withhold information responsive to a FOIA request if the information is: (1) commercial or financial, (2) obtained from a person, and (3) privileged or confidential.
National Parks & Conserv. Ass’n v. Morton,
The federal government is required by law to consider price when it decides which competitor should be awarded a contract. FAR § 15.304(c)(1);
see also
FAR §§ 15.101, 15.101-1, 15.101-2. This type of information is most often deemed a required element of government solicitations, and hence involuntarily submitted.
See, e.g., Martin Marietta Corp. v. Dalton,
A. The Air Force’s Decision that Disclosure is Unlikely to Impair the Government’s Future Interests
With respect to the “impairment inquiry,” the Air Force argues that there is little room for courts to second-guess the government’s assessment of its own interests.
See, e.g., General Elec. Co. v. NRC,
The Air Force disposed of plaintiffs’ arguments by claiming that it, as a government entity, was “in the best position to determine” whether its own interests would be harmed. Admin. Rec. Exh. 14 at 8. The sole support for this assertion was a reference to earlier pages of the decision letter addressing the history of FOIA and procurement regulations, which concluded that this type of information had been released by the government for more than forty-five years.
5
Id.
The logic behind the conclusion was that because the Air Force’s interpretation supported the view that such information was not protected by Exemption 4, it had consistently followed a practice of releasing the information; therefore, a continued adherence to the disclosure practice was unlikely to cause future impairment for the government.
See id.
The missing link in this chain of analysis is any nexus between the practice allegedly supported by the Air Force’s legal interpretation and actual implementation of such a disclosure practice over the past forty-five years. Quite simply, the record is devoid of any evidence that the Air Force has actually disclosed this type of information, as it claims, on a consistent basis. The burden to produce such evidence rests with the Air Force, because it — not plaintiffs — has access to all relevant information and documentation regarding prior bids and disclosures.
See McDonnell Douglas,
On first blush, it also seems that the Air Force failed adequately to consider plaintiffs’ argument that disclosure would harm the integrity of the negotiated procurement process because Mr. Ford, a former government employee who allegedly had access to plaintiffs’ sensitive pricing and cost information during his government tenure, had subsequently joined the management ranks of Sabreliner. To be sure, as Mr. Ford’s employer — and the custodian of plaintiffs’ sensitive information — at the time in question, the government may be in the best position to determine whether or not plaintiffs’ allegations are true. Hence, it was incumbent upon the government to entertain and fairly assess plaintiffs’ concerns. Arguably, the Air Force did not do so, choosing instead summarily to rejeсt plaintiffs’ arguments without any indication of having researched them. Essentially, the Air Force shifted the burden to plaintiffs, and then looked no further. See Admin. Rec. Exh. 17 (‘You also expressed concerns based on speculation about a former government employee. I have considered your allegations but no evidence has been presented to warrant a change in my decision.”); Admin. Rec. Exh. 10 at ¶ 2(d) (stating that “[w]e have no reason to believe this employee accessed Orenda’s sensitive cost and pricing information”).
The Air Force has not provided any analysis or facts to support its conclusions regarding Mr. Ford. Tellingly, neither decision letter claims that the Air Force ever investigated the situation at all. The statement that “[e]ven if [Mr. Ford] did [access Orenda’s sensitive cost and pricing information], release of these contract unit prices would not broaden the scope of his understanding of Orenda’s sensitive cost and pricing information” is somewhat con-clusory and fails to explain why disclosure would not augment any pre-existing basis of knowledge. Admin. Rec. Exh. 10 at ¶ 2(d). But the fault does not lie with the Air Force alone. It is plaintiffs’ burden to support the claim that disclosure of cost and pricing information to Mr. Ford would create some unique threat to sensitive cost and pricing strategies. Beyond simply saying so, plaintiffs have not done so. After all, if Mr. Ford has seen the information before, then disclosure would not seem to pose any real threat. Furthermore, Mr. Ford is not the only one (at Sabreliner or elsewhere) with an understanding of the industry dynamics, or who plaintiffs contend could use the information to harm plaintiffs.
Perhaps plaintiffs’ real lament is that a significant government official with some knowledge of their relevant cost and pricing information could wind up in an important position with a key competitor at all. That is the gist of their “harm to the integrity of the procurement process” claim. But this reverse-FOIA lawsuit cannot address that situation. In the end, then, it is plaintiffs who have failed adequately to support their claim of a unique threat of harm from disclosure based on Mr. Ford’s employment at Sabreliner.
*32
Finally, the second decision letter never establishes that the type of information allegedly releasable all along under the procurement regulations is the same type of information at issue in this case. The decision letter makes use of the amorphous term “contract prices,” failing to analyze whether the information is, for example, “cost breakdown” information (which, as detailed below, is protected from disclosure by the plain language of the FAR — regardless of the Air Force’s interpretation of FOIA and procurement regulation history) or “unit price” information (which may be disclosed under the FAR so long as it is not conceivably protected by Exemption 4,
see MCI Worldcom,
Still, the most significant defect in the Air Force’s decision remains that it was reached through an analytical framework that disregards applicable D.C. Circuit precedent. To begin with, the Air Force’s decision largely ignores the recent
McDonnell Douglas
decision, as discussed further below. Moreover, under
National Parks I,
an Exemption 4 analysis considers whether the information is commercial or financial, obtained from a person, and privileged or confidential.
See Nat’l Parks I,
*33
Congress has never delegated to the Air Force — or any other agency — the authority to create a body of FOIA law that would strictly curtail the “reverse-FOIA” cause of action.
See Tax Analysts v. I.R.S.,
B. The Air Force’s Conclusion that Disclosure Is Unlikely to Cause Plaintiffs to Suffer Substantial Competitive Harm
The second way to qualify involuntarily-submitted information as “privileged or confidential,” and hence within Exemption 4, is to prove that its disclosure would likely cause plaintiffs to suffer substantial competitive harm. Plaintiffs’ fear is that disclosure of its cost and pricing information could enable competitors to match or undercut their pricing, which would allow competitors to submit more attractive, unsolicited proposals for the option-year work. According to plaintiffs, the government could then either accept these unsolicited proposals or use them as a reason to test the market by issuing a new solicitation for the option-year work. Plaintiffs further contend that disclosure could jeopardize their competitive position (on a national and international scale) by allowing competitors to discern their pricing method, which would facilitate the forecasting and undercutting of plaintiffs’ offers in future procurements. To support their arguments in this regard, plaintiffs submitted the Bayley Memorandum, as well as other written materials from counsel, containing examples of how competitors could use the information to ascertain key components of plaintiffs’ pricing strategy. Ultimately, the Court need not consider plaintiffs’ arguments regarding future procurements because it rejects the Air Force’s analysis with respect to option-year J85 work. 8
*34 With respect to the option-year work, plaintiffs submit that disclosure would cause substantial competitive harm in two ways: (1) competitors could submit unsolicited, lower bids to the Air Force, which the Air Force could then accept, or (2) if the Air Force chose to re-bid the option-year work, then competitors could respond with offers that undercut plaintiffs’ prices. The Air Force rejected plaintiffs’ first argument on the rationale that unsolicited bids “based on price alone” could not be considered because they do not meet the definitions of an “unsolicited proposal” or “valid unsolicited proposal” under FAR § 2.101 and Subpart 15.6, respectively. Admin. Rec. Exh. 14 at 11. FAR § 2.101 defines an “unsolicited proposal” as “a written proposal for a new or innovative idea that is submitted to an agency on the initiative of the offeror for the purpose of obtaining a contract with the Government, and that is not in response to a request for proposals ... or any other Government-initiated solicitation or program.” Subpart 15.6 sets forth the criteria for accepting, evaluating, and rejeсting such unsolicited proposals. FAR § 15.600. Under FAR § 15.603(c), an unsolicited proposal is invalid if it is not “innovative and unique,” or if it “address[es] a previously published agency requirement.”
If one of plaintiffs’ competitors submitted an unsolicited proposal for the option-year work, the proposal would not be innovative or unique, and clearly it would address a previously published agency requirement. Hence, as the Air Force argues, it could not be accepted by the government. But this does not mean that such a proposal is unlikely to cause plaintiffs to suffer substantial competitive harm. The mere submission of such a proposal could alert the Air Force to the possibility of cost savings, and could induce the Air Force to re-bid the option-year work.
In this way, plaintiffs’ two arguments are actually intertwined, and the reasonableness of the Air Force’s conclusion regarding the first is dependent on its analysis of the second argument. Here, the Air Force’s decision breaks down. Relying on FAR § 17.207(c), the Air Force claims that options are regularly exercised “unless funds are not available to fund the requirement or the incumbent’s performance was less than satisfactory.” See Admin. Rec. Exh. 14 at 11. But this conclusion rests on *35 an unconvincing interpretation of that provision. FAR § 17.207(c) merely sets forth the conditions under which a contracting officer may exercise an option. It does not mandate — or even express a preference for — the exercise of options, and it never alludes to a regular course of action by the government. Indeed, the provision expressly states that options may not be exercised unless they are determined to be “the most advantageous method of fulfilling the government’s need,” and specifically directs the government to consider price when making that determination. FAR § 17.207(c)(3). Moreover, the Air Force neglected to consider the import of FAR § 17.207(d)(1), which specifically contemplates “testing the market” through the issuance of a new solicitation. Although a new solicitation should not be issued “[i]f it is anticipated that the best price available is the option price or that [the option] is the more advantageous offer,” id, that is not the situation plaintiffs fear. Plaintiffs are troubled by the possibility of a competitor obtaining sensitive pricing and cost information, and using it to draw up and submit a lower-priced proposal that then prompts the government to issue a new solicitation. Under such circumstances, it appears that the FAR actually prefers the issuance of a solicitation, and there is certainly nothing in the FAR to suggest that such action would be rare. Hence, the FAR provisions themselves do not support defendant’s contention that it “has no practice of issuing new solicitations to test the market” and “regularly and routinely exercises” options.
According to the Air Force, plaintiffs’ argument of substantial competitive harm fails because they did not present evidence that the Air Force has previously chosen not to exercise options in its dealings with plaintiffs, or that the government generally follows “a pattern of such action.” Admin. Rec. Exh. 14 at 11. But this is another circumstance in which the Air Force improperly shifted the burden to plaintiffs. To begin with, plaintiffs have never argued that the Air Force follows a pattern of re-bidding option work, nor did they contend that the Air Force had previously done so with resрect to plaintiffs’ contracts. Rather, plaintiffs claimed that the Air Force could, do so with respect to this contract, because nothing requires the government to exercise options.
The Air Force’s bald assertions of “past practice” to the contrary are insufficient under
McDonnell Douglas.
Phrases like “based on past practice” and “based on our experience” do not flip a switch that mandates blind deference by the Court. As the entity that decides whether to exercise an option, the Air Force is in the best position to produce evidence to support its contentions that it “regularly and routinely” does so. Indeed, this is a statement of empirical fact that, if true, is quite capable of substantiation.
See McDonnell Douglas,
Indeed, the Air Force’s unsubstantiated rationale is essentially a repackaging of the familiar “price is one of many factors” argument that has been unequivocally rejected by the D.C. Circuit on at least two prior occasions.
9
See McDonnell Douglas,
*36
[t]his is a requiremеnts contract, which means that the government would be billed under the contract using delivery orders that vary in amount depending on the type and amount of work to be done. The total annual contract amount is an estimate of the work that will be required during that period. Review of unit prices under the contract is essential in evaluating the proposals for this contract.
Admin. Rec. Exh. 14 at 8. Accordingly, the very reasons why plaintiffs were required to submit the information at issue also support the conclusion that price is the most significant factor considered during the bid evaluation process.
Hence, “the decision of the Air Force is neither ‘at least as compelling as [that of plaintiffs’],’ nor ‘well-reasoned, logieal[,] and consistent’; it is, in short, arbitrary and capricious.”
McDonnell Douglas,
C. Application of McDonnell Douglas
The question remains, then, whether the assessment set out above is true to the D.C. Circuit’s most recent foray into the area in McDonnell Douglas. There, three categories of information were at issue: (1) option year line-item prices, which are the projected line-item prices for work performed during the optional term of the contract, following the completion of the contract’s base period; (2) vendor pricing CLINs, defined as the costs of materials and services procured from other vendors *37 during the contract term; and (3) over and above work CLINs, that is, the “fixed hourly labor rates” for the maintenance and repair work that is not required under the contract, which the Air Force is not mandated to direct to the contractor. Plaintiffs in this case contest the release of all option year line-item pricing, as well as some base year line-item pricing, and the release of over and above work CLINs (or “fixed hourly labor rates”). Vendor pricing CLINs, in this casе referenced as: “pricing and price-related information in the subcontracting plan,” are not at issue. In McDonnell Douglas, of course, the court upheld the Air Force’s release of over and above work CLINs, but held that option year prices and vendor pricing CLINs could not be released.
McDonnell Douglas
considered arguments that were specifically crafted with respect to these categories of information.
See
McDonnell Douglas focused on the “substantial competitive harm” prong of Nat’l Parks. With respect to the option-year line-item pricing in that case, the plaintiff argued that in the event that the Air Force decided not to exercise the options, competitors could use the information to undercut its pricing in the re-bidding process. The Air Force countered that options are usually exercised, and that under the FAR the contract could not be rebid unless market conditions changed considerably. The D.C. Circuit declined to consider these arguments because they were presented for the first time on appeal. See id. at 1188. The parties have advanced the same arguments again here. As explained above, the Court ultimately finds that the Air Force’s position is unpersuasive, because the FAR provisions do not express any preference for exercising options and the Air Force has failed to provide evidence to support its alleged past practice of routinely exercising options.
The plaintiff in
McDonnell Douglas
likewise argued that the requested information could be used by competitors preemptively to convince the Air Force to re-bid the option work. The D.C. Circuit determined that the plaintiff had not raised this argument below, and declined to consider it.
See
Similarly, the court in McDonnell Douglas refused to considеr the Air Force’s contention that any proposed prices from a competitor would have to offset the transaction costs associated with changing contractors (such as an interruption in service) in order to convince the Air Force not to exercise an option because the point was raised for the first time on appeal. See id. at 1188-89. The Air Force now makes the same argument here. Ultimately, this Court is unpersuaded, however, because the FAR merely suggests that such considerations “should” be taken into account, not that such a finding is required in order to decline to exercise an option. Moreover, the Air Force has presented no evidence that it has followed a practice of requiring such a finding notwithstanding the FAR’s permissive language.
Finally, the Air Force in
McDonnell Douglas
argued that any substantial competitive harm would be mitigated by the
*39
fact that price is only one of many factors that must be considered. The D.C. Circuit in
McDonnell Douglas
relied upon its earlier decision in
NASA,
This Court has not used McDonnell Douglas to create a strict mandate or per se rule. Rather, the Court’s decision is driven by the shortfalls in logic and evidence that characterize the Air Force’s administrative decision in this case. Specifically, the Air Force has failed to support several conclusory assertions of empirical fact, has unreasonably interpreted various FAR provisions, and has divined a new Exemption 4 standard while declining to follow the legal framework established by the D.C. Circuit, instead relying heavily on ambiguous legislative history of FOIA and the FAR that has never factored into the Exemption 4 analysis. The analysis by the D.C. Circuit in McDonnell Douglas, in short, which the Air Force would largely ignore, drives the conclusions reached here.
III. Does the TSA Prohibit Disclosure if the Information Is Within Exemption 4?
The D.C. Circuit has repeatedly stated that “the scope of the Trade Secrets Act ‘is at least co-extensive with that of Exemption 4 of FOIA.’ Consequently, whenever a party succeeds in demonstrating that its materials fall within Exemption 4, the government is precluded from releasing the information by virtue of the Trade Secrets Act.”
Widnall,
Although the D.C. Circuit’s interpretation of this interrelationship between Exemption 4 and the TSA has been described — in
dictum
— as possibly “no longer accurate in light of [the] ... more expansive interpretation of the scope of Exemption 4 [set forth] in
Criti
*40
cal Mass,
”
Widnall,
IV. Does the FAR Authorize Disclosure Notwithstanding the TSA?
Relying on FAR §§ 15.503(b)(l)(iv), 15.506(d)(2), and 5.303(b)(2), 12 the Air Force argues that the FAR explicitly authorizes — indeed, requires — it to disclose “unit pricing information.” Admin. Rec. Exh. 14 at 6. Plaintiffs, however, draw the Court’s attention to FAR § 15.503(b)(l)(v), which specifically excepts “cost breakdowns” and trade secrets from the otherwise-applicable disclosure requirements of FAR § 15.503(b)(l)(iv). Similarly, plaintiffs submit that FAR § 15.506(d)(2) is limited by FAR § 15.506(e), which unequivocally unauthorizes the disclosure of “information ... exempt from release under the Freedom of Information Act including ... commercial and financial information that is privileged and confidential, including ... profit, indirect cost rates, and similar information.” See also PL’s Suppl. Mem. at 2, 3.
The Court agrees that the Air Force has selectively quoted from the FAR and has misrepresented what the plain terms of the FAR require.
13
Section § 15.506(e) codifies the
Nat’l Parks
standard for FOIA Exemption 4, which the Court has already determined protects the information in this case from disclosure.
See Mallinckrodt,
CONCLUSION
For the reasons stated herein, the Air Force’s administrative decision reflected in its July 19, 2005 decision letter is “arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law” under the APA, except with respect to fixed hourly labor rates for over and above work CLINs. Accordingly, defendant’s motion for summary judgment is granted in part and denied in part, and plaintiffs’ motion will also be granted in part and denied in part. A separate order has been posted on this date.
ORDER
Upon consideration of plaintiffs’ motion for summary judgment, defendant’s cross-motion, the various memoranda of the parties, representations of counsel at the oral hearing held on this matter, applicable law, and the entire record herein, and for the reasons stated in the accompanying Memorandum Opinion, it is this third day of August, 2006, hereby
ORDERED that plaintiffs’ motion is GRANTED in part and DENIED in part; it is further
ORDERED that defendant is enjoined from releasing plaintiffs’ base and option period line-item pricing information; it is further
ORDERED that defendant’s motion is GRANTED in part and DENIED in part; and it is further
ORDERED that defendant may release plaintiffs fixed hourly labor rates for over and above work CLINs.
SO ORDERED.
Notes
. It is unclear exactly when this submission was made. The clarification letter itself is dated December 3, 2003, but it appears that the cover letter is dated December 4, 2003.
.
The reason for this discussion is presumably to provide the source of the two-part test that the Air Force has conclusorily identified on page 4 of the decision letter.
See id.
(quoting extensively from
Pierce v. United States,
. The Air Force acknowledges that Toyota Motor Mfg. addressed a different standard, but states (without any identifiable legal support) that “the requirement is equally applicable to FOIA since the Supreme Court has found that FOIA is 'exclusively a disclosure statute' and that its twin purposes are 'to check against corruption and to hold the governors accountable to the governed.' " See Admin. Rec. Exh. 14 at 10 (no citations provided for quoted language).
. Despite the Air Force's claim that the case was remanded to permit it to reconsider its earlier conclusion in light of McDonnell Douglas, most of the second decision letter does not relate to McDonnell Douglas.
. Defendant's original decision letter is similarly conclusory, dismissing plaintiffs’ argument because "based upon [its] experience in government contracting, [the Air Force] do[es] not anticipate [that] disclosure of the requested information will likely impair [its] ability to obtain contract unit prices or subcontracting goals on future acquisitions.” Admin. Rec. Exh. 10 at ¶ 2.
. The Court need not remand to the Air Force for consideration of this issue, however, because, as discussed below, FAR §§ 15.503 and 15.506 essentially codify the Exemption 4 standard.
See MCI Worldcom,
. The Air Force's analytical framework amounts to a
per se
rule that the type of information at issue here is never exempt under Exemption 4. That result is, of course, expressly rejected by
McDonnell Douglas.
. The Air Force's analysis regarding future procurements may be more convincing. Although plaintiffs submitted an affidavit and several memoranda containing specific, arithmetic examples and calculations to show how competitors would be able to deconstruct plaintiffs' pricing formula, the Air Force carefully considered — and rejected — each one, using specific and illustrative reasoning. It may well be that disclosure would facilitate
*34
the reverse-engineering of plaintiffs’ pricing strategy. The burden was on plaintiffs, however, to show that such an occurrence was not merely possible, but likely. The examples plaintiffs chose for support were not the most convincing illustrations. The Air Force highlighted their shortfalls and the ease with which subjective variables that factor into the cost analysis could cause a seemingly small mistake that would result in a substantial miscalculation of plaintiffs' future offer.
See Acumenics Res. & Tech. v. Dep’t of Justice,
. The Air Force’s first decision letter expressly stated that “price is just one of many factors considered!, which] means [that] the effect of undercutting and ratcheting down *36 would be diluted by the other factors and the likelihood of competitive harm would be greatly reduced.” Admin. Rec. Exh. 10 at 3-4 ¶ 2(b)(4).
. An exception is the "fixed hourly labor rates for over and above work CLINs” category. In
McDonnell Douglas,
the plaintiff argued that a competitor with knowledge of the “over and above work CLINs” could use the information to craft a more attractive bid for the performance of that work.
In the present case, plaintiffs make the same type of argument, but with a slight twist. They assert that Orenda is an International Association of Union Machinists shop, and that competitors' employees could (through their union memberships) learn the negotiated wage rate. See Admin. Rec. Exh. 14 at 15; Admin. Rec. Exh. 7 at 8-9. The combination of these negotiated pay rates and the fixed hourly labor rates for over and above work CLINs would allegedly enable competitors, through arithmetic calculations, to determine plaintiffs' "overhead rates.” See Admin. Rec. Exh. 14 at 15; Admin. Rec. Exh. 7 at 8-9. Specifically, plaintiffs argue that "[i]f competitors had access to both labor rates and line-item pricing data, and given the fact that the cost of material is relatively similar for all companies, they could very simply deduce Orenda’s overhead rates.” Admin. Rec. Exh. 7 at 9. Much like the argument rejected in McDonnell Douglas, plaintiffs' contentions assume too much. It may well be possible for union members to learn the negotiated pay rates and to communicate them to one of plaintiffs’ competitors, and for that competitor then to calculate plaintiffs' overhead rates. But plaintiffs have not offered any evidence that this multiple-step occurrence is lilcely, which is the applicable standard here. Moreover, plaintiffs’ argument depends upon the release of the "line-item pricing” information, which this Court is not ordering. Any competitive harm, then, does not flow from the release of the fixed hourly labor rates themselves, but rather from the release of that information coupled with the release of the line-item pricing information. Hence, consistent with McDonnell Douglas, the Court will uphold the Air Force's decision that substantial competitive harm is not likely to result from the disclosure of fixed hourly labor rates for over and above work CLINs.
. It is well-settled that a decision of the D.C. Circuit may only be overruled by either an
en banc
panel or the Supreme Court.
See, e.g., United States v. Torres,
. It is unclear why the Air Force relies on § 5.303(b)(2). That provision applies when an agency has elected to make a local announcement to the media at the time the contract is awarded. Such circumstances are not, as far as the Court is aware, presented here.
.This appears to be an oft-employed strategy for the government.
See MCI Worldcom,
. The Air Force's attempt to argue that these cases should not guide the Court's analysis because they do not address the history of the FOIA and the FAR as set forth in its decision letter is unconvincing. The legislative history of the FOIA is, at best, ambiguous and incon-elusive. Moreover, "[t]he FAR may not be interpreted in a way that contravenes [the] statutory prohibition on disclosure” that is contained in both the FAR and its authorizing statute.
See MCI Worldcom,