60 N.J. Eq. 211 | New York Court of Chancery | 1900
Mr. George Pfeiffer, Jr., entered into a contract with the city of Camden on June 24th, 1899, to construct a municipal waterworks. Some dispute having arisen in respect to the execution of the work, and in respect to the amount due by the city, the matters were settled on May 25th, 1899, by an agreement which fixed the amount still due at the sum of $120,000; of this sum there is still in the hands of the city, to the credit of Mr. Pfeiffer the sum of $38,759.04. Under date of May 18th, 1898, the Camden Iron Works served a notice upon the city of Camden, claiming that Mr. Pfeiffer owed it the sum of $32,228.45.
The claim attached to the notice displayed a demand for castings shipped, the sum of $54,971.65, with a credit of $36,307.55, leaving a balance due amounting to $18,664.10. The charges were at the rate of $22.50 per two thousand pounds.
In addition to this claim there was another for two hundred and twenty-five pieces of thirty-inch and thirty-four pieces of
The claim for $11,714.70 for pipe not shipped, must be disallowed. There were two contracts between Mr. Pfeiffer and the Camden Iron Works, one for furnishing a stand-pipe, and another dated October 31st, 189 G, for castings. It is under the contract of October 31st, 1896, that the claim for castings not shipped, but held subject to order, must fall. ’ Under that contract the Camden Iron Works agreed to sell such quantities of straight pipes and special castings as Mr. Pfeiffer may desire at the price of $21.64 per ton of two thousand two hundred and forty pounds for all straight pipe, and $24 per ton of two thousand two hundred and forty pounds for all ball joints, and two and one-quarter cents a pound for all special castings, delivered f. o. b. cars at Camden, consigned to such freight station or stations between certain points on the Pennsylvania railroad as Mr. Pfeiffer should from time to time designate. The pipe and eastings were to be delivered at such designated stations within thirty days after each written monthly order for the same.
The pipes not shipped were never ordered by Mr. Pfeiffer, either verbally or by writing. It appears, also, that these pipes have been sold to other parties by the complainant. Under the terms of the contract, Mr. Pfeiffer is not liable to pay for them.
In respect to the claim for the pipes actually shipped, there is an overcharge in the price charged per ton. The castings included in this claim are “all pipes and special castings,” and the prices are fixed by the contract of 31st October. Instead of adhering to the prices designated in this contract, charges are made at the rate of $22.50 for two thousand pounds. There should be a- reduction for the difference.
Then there must be a reduction for overweight. The contract provides that any overweight in excess of one per cent, is not to be paid for. The contract states that the water pipe, hub and spigot, shall be twelve feet lengths. Now the total weight divided by the number of lengths, shows an excess in weight of more than one per cent. In explanation of this, it is
■ HTor is there proof of a general usage in the trade, of which Senator Pfeiffer must have had notice, that when the length of cast pipes is stated in a contract, it is understood to mean three or four inches more than the lengths stated. There must be a reduction for this excess in weight.
Then it is admitted that there must be a reduction for the tool-house of $48.69.
I think there should be also a reduction for pipes No. 36 and No. 215, as I think they were defective.
So far in respect to the merits of the claim itself.
The defence, however, does not rest upon a claim of overcharge, but it is insisted that the bill to enforce the lien should be dismissed. In support of this insistence, it is urged that this claim is not included within the provisions of the act of March 30th, 1S92, because the complainant does not stand in the posture of a laborer, mechanic, merchant or trader, and it is only the class of persons mentioned in the first section of the act that can claim the benefit of its provisions. It is ¡perceived that the title of the act is broader than the first section, inasmuch as the title covers, not only the class mentioned, but also persons employed upon or furnishing materials towards the performing of any work in public improvements, &c. I am of the opinion that the term “mechanic, merchant or trader/' is broad enough to include the Camden Iron Works who furnished material towards the performance and completion of this contract.
■ It is secondly insisted that the bill should be dismissed upon the ground that the lien as filed was for an amount so greatly in excess of that due the lienor as to exhibit a fraudulent purpose. If I were satisfied that the excess in the claim so filed was introduced into the claim for the purpose of tying up the money due to Mr. Pfeiffer, and to coerce him into making a settlement upon the claimant’s terms, I would not hesitate a moment to dismiss the bill. If any creditor willfully files a
■ Unless counsel can agree upon the amount which a calculation in accordance with the views herein expressed will produce, I will refer it to a master.