25 Colo. 161 | Colo. | 1898
delivered the opinion of the court.
The appellant here was plaintiff, and the appellees were defendants, below. For the sake of brevity and convenience, in the opinion, the appellant is designated as the plaintiff, and the defendant Water Supply and Storage Company as the “ water company,” and the Colorado' Milling and Elevator Company as the “milling company.” The ultimate and substantial facts alleged in the voluminous complaint are in the main fairly summarized by defendants’ counsel in their brief as follows:
In 1868 the defendant milling company constructed a ditch diverting from the Cache la Poudre river sixty cubic feet of water per second of time to be used in propelling its mill
In 1881 the defendant water company constructed a ditch taking water directly from the river at a point above the head-gate of the milling company’s ditch, and the uses actually made of such appropriation were the irrigating of agricultural lands during the summer season, and the storing of water, outside of the winter months, in certain of its reservoirs, having an aggregate storage capacity of 500,000,000 cubic feet, and then using it in the latter part of the season for irrigating lands belonging to its stockholders.
In 1892 the plaintiff reservoir company constructed a ditch taking water from the river at a point below the discharge of the milling company’s ditch, and the object of this appropriation was to store the water in its reservoir, having a storage capacity of 450,000,000 cubic feet, to be used during the late irrigation season for irrigation purposes.
There are sixty-five ditches which rightfully divert and take for irrigation all of the water which flows in the river during the irrigating season, except during the period of floods in the month of June, when there is some water available for storage. Between November 1 and April 1 of each year, prior to the winter of 1892-1893, the amount of water which was accustomed to flow in the river down to the place where now is located plaintiff’s head-gate was about sixty cubic feet per second, sometimes more, sometimes less. During this winter the sixty cubic feet of water diverted and used by the milling company for propelling its machinery and afterwards discharged into the river, flowed down and was taken into the head-gate of the plaintiff company’s ditch, where it was by it diverted and stored in its reservoir.
Beginning with the winter of 1893-1894, and continuing during the following winter, the defendant water company di
It should be borne in mind that it is distinctly alleged in the complaint that, prior to the winter of 1893-1894, and not until after the' plaintiff company had made its appropriation, the defendant water company had never diverted in the winter time any water whatever from the river, to the extent of sixty cubic feet, or any other quantity, either during nights, Sundays, or at intervals when the mill was not in actual operation, although such temporary nonuse for power purposes had frequently occurred; and that not until after the plaintiff
The milling company suffered a default,* and the other defendants filed a demurrer to the complaint containing several grounds, but the only one argued by counsel on this appeal is that the complaint does not state facts sufficient to constitute a cause of action, and to this our consideration is confined.
From the foregoing statement it clearly appears that after the use and subsequent discharge into the stream of the sixty' cubic feet of water diverted by the milling company, the first beneficial use thereof, as well as of other so-called winter waters, was made by the plaintiff; and that no attempt was made by the water company to cause any waters to flow in its ditch until a year after the plaintiff had actually stored water in its reservoir.
Neither party questions the first priority of the milling company, so that question is eliminated. The case may first be considered as though all allegations concerning the mill ditch were absent, though this method will occasion some repetition.
To sustain its claim to the first appropriation of the winter • waters of the stream, counsel for the water company makes a plausible and ingenious argument. It is this: When, in 1881, it conceived its plan for diverting water for irrigation and storage, it was confronted with senior demands existing against the flow of the river for irrigation and milling purposes. ’ Whether these demands were satisfied by means of ditches above or below its intake, defendant was obliged to
For the purposes of this case, we may concede the validity of the argument up to this point, and further concede that this statement defines the status of the defendant company with respect to senior appropriators; and that when they ceased to use water, it became subject to appropriation. Therefore, as the argument proceeds, the defendant might acquire a right to divert such Unused waters, either for irrigation or for storage. Indeed, we might go further, and say that it may have perfected its right thus to take water during the summer season. But the argument stops short here, probably for the reason that the facts of this case require it. For if the water company did not make such an appropriation to be enjoyed during the winter season (which is directly negatived by the complaint)' until- after the plaintiff made its appropriation, and limited to that season, the latter, as to the volume of water actually appropriated by it, becomes the senior appropriator as to the winter flow. -
' Applying the foregoing principles to the admitted facts of this case, it-appears that, as to sixty'cubic feet of water, the
No right is acquired by merely possessing facilities for making an appropriation, unaccompanied by a bona fide attempt within a reasonable time to utilize them. Under our law an appropriation can be made only by an actual diversion of water followed by an application thereof, within a reasonable time, to a beneficial use. The fact, therefore, that the defendant water company, from 1882 to 1892, and during the winter seasons of these years, neither diverted water nor beneficially applied it until after the plaintiff made its diversion in 1892, makes the former the junior appropriator, and the latter the senior, for such periods of time, as to the quantity actually appropriated by the latter.
While no case in this court may have required the announcement, it seems, both upon principle and authority, that one may make a prior appropriation of a certain quantity of water to be enjoyed for a designated period of time, and another person an appropriation of a like quantity from the same source during another period, and as to the same be a prior appropriator himself. In other words, there is no difference in principle between “ an appropriation measured by quantity and an appropriation measured by time.” Kinney on Irrigation, § 177, et seq., and cases cited; Black’s Pomeroy on Water Rights, §§69, 91, 92, and cases cited; Barnes v. Sabron, 10 Nev. 217; Smith v. O’Hara, 43 Cal. 371, and cases cited.
After this volume of water fulfilled its mission of running the mill machinery, it was turned back into the natural channel, and such have been the extent and method of use by the milling company since the day of its appropriation. In effect, the milling company thereby gave notice to the public that its only use of this water was for power purposes, and when that function was performed, its claims terminated, and such, indeed, is the only claim it now makes. After the water had again reached the natural channel, the plaintiff had the right to appropriate it directly from the stream, and such right is entitled to protection under the law. When the milling company ceased to use this water, the water company has no prior right over the plaintiff, for the latter first appropriated it. That the water eompany wanted to use it, or was prepared to use it if he could get it, but did not until
Now, it is further manifest that after the plaintiff made its appropriation, while the milling company may change the character of its use, or the place of diversion, it may not do so to the injury of the former. Strickler v. Colo. Springs, 16 Colo. 61. Neither could it, by sale to the water company or other person, empower its grantee to do what it could not do. But, say counsel, plaintiff may not compel the milling company to divert water into its race for the former’s benefit, and therefore the latter may cease altogether to use its mill race. True, but is this equivalent to holding that it may, by abandonment, confer, or that it may make such other use of its appropriation as to confer, upon others a right to deprive the plaintiff of its appropriation ?
This leads to a consideration of the second general contention of defendants, that when the milling company ceases temporarily, or, as in case of abandonment, permanently, to exercise its rights, the water theretofore diverted must be allowed to flow in the stream subject to appropriation by other appropriators higher up the stream in accordance with their relative priorities, irrespective of the question whether or not the unused or abandoned waters have been appropriated by ditch owners farther down the stream before the date of such temporary or permanent nonuse.
It is somewhat singular in this case that opposing counsel rely upon the same authorities, which are cited in all the briefs, though not so strange that they disagree in their conclusions drawn therefrom, or as to the legal effect of an abandonment. The position of defendants is that, when an abandonment occurs, the situation is as though no appropriation had ever been made; and at the very moment an abandonment occurs, the water resumes its original quality of being a part of the public waters, and may be taken by other appropriators in the order of their original dates of priority.
It has been determined, where an appropriation of water for a use that wholly absorbs it, as for irrigation, is abandoned
It follows, therefore, when the plaintiff went upon the-stream and saw the use that was being made of water by the-milling company and then made its appropriation, no subsequent act of omission or commission by the milling company could operate to the injury of the plaintiff; and by virtue-of its appropriation, the plaintiff, on the basis of then existing conditions, secured a vested right to have the water continue to flow either from the mill race or from the stream itself, in substantially the same quantity as it flowed when
This conclusion would seem to be in accordance with equity,, and, in principle, well established by the authorities cited. The water company could not, by purchase, acquire from the milling company any superior right to this sixty cubic feet of' water appropriated by the plaintiff, for the milling company had no prior rights to convey. Why, if the milling company ceases temporarily or permanently to use its appropriation-the water company could, or should, obtain a right which it could not get by purchase, is difficult to perceive, for one may not abandon a right in favor of another.
An illustration used by plaintiff’s counsel serves to bring out more clearly this point. Suppose the water company owned all the water rights, both for irrigation and milling, on this stream, and had used them for years, as the present, owners have done. Could it, after the plaintiff had made its-appropriation, change the character of the use of the mill appropriation, and use the same quantity of water during the winter season for storage in its reservoirs, and thus prevent, plaintiff from enjoying its appropriation during the same season ? Or could it change the place of diversion by discharging water from the mill race at a point below the plaintiff’s-head-gate in order to store it in some reservoir that it might, own farther down the stream ? Manifestly not; and, if not, why should a different result follow by any act of the present owners, whether they act in conjunction, or entirely independent of each other?
Reversed.