Plaintiff — C & T Associates, Inc. (C & T) thе apparent low bidder on a sewer construction project, seeks preliminary injunc-tive relief against the awarding of the contract to another. New Cаstle County proposes to award the contract to the second lowest bidder because it is claimed that C & T did not comply with 29 Del.C. § 6911 which requires the listing of subcontractors on public building сontracts. For the reasons set forth, I hold that 29 Del.C. § 6911 does not apply to this contract and there *28 fore preliminary injunctive relief must be granted.
In response to a bid solicitation C & T submitted a proposal which was the apparent low bid at the time of the bid opening. Subsequently, however, C & T learned thаt its bid had been challenged by First State Enterprise, Inc., the next lowest bidder on the project. Thereafter, C & T was informed by letter that its low bid had been rejected on the grounds that it had failed to comply with the applicable requirements of 29 Del.C. § 6911(a) which requires the listing of the names and addresses of those subcontractors whose services it intends to use in performing the proposed work. C & T was also informed that the County intends to award the contract to the next lowest bidder. C & T then commenced this action to enjoin the awarding of the contract to First State. It is conceded that the only possible defect in C & T’s bid was the failure to properly list the names of subcontractors.
I
The legal issue presented is whether or not this sewage system construction project falls within the purview of 29 Del.C. § 6911(a), since that section refers only to contracts for public buildings. 29 Del.C. § 6911(a) provides:
§ 6911. Contracts for public buildings; listing subcontractors; bidder as subcontractor; substitution of subcontractors; penalties.
Any contract, the probable cost of which exceeds $5,000, for the construction, alteration or repair of any public building of the State, or any political subdivision thereof, shall, in addition to the other requiremеnts of this chapter be subject to the following provisions:
(a) Such contract shall be awarded only to a bidder whose bid is accompanied by a statement contаining the names and addresses of the subcontractors whose services the bidder intends to use in performing the work. No bidder for such a contract shall list himself in any accоmpanying statement as the subcontractor of any part of the public building unless the bidder, in addition to being licensed by a general contractor of the State, shall also be recognized in the trade as a subcontractor in and for any such part or parts of such work so listed in such accompanying statement, (emphasis addеd)
In
Haddock v. Board of Public Education in Wilmington,
Del.Ch.,
[T]he sole purpose seems to be the requirement that a general contractor bidding on a public project name the subcontractors who will be used by him in the performance of the work in the event that the contract should be awarded to him. (84 A.2d at 162 )
It is clear that the statute makes the naming оf subcontractors'a condition precedent to the awarding of the bid. Such a statute is mandatory and never merely discretionary.
Haddock v. Board of Public Education in Wilmington,
supra, at 162. If there is any materiаl defect or omission in the bid required by 29
Del.C.
§ 6911, the contract may not be awarded to the party submitting the defective bid.
Kuhn Construction Co.
v.
State,
Del.Ch.,
C & T, however, takes the position that the contract in issue is not a contract for the construction of a “public building” and therefore is not covered by the requirements of 29
Del.C.
§ 6911. The contract calls for the installation of an underground public sewer system. It is clear that the sewer mains themselves are not public buildings. See
Nikis v. Commonwealth,
Va. Supr.,
II
The meaning of the words “public building” as used in 29
Del.C.
§ 6911 is ambiguous as the word “building” alone can mean many things. See 12 C.J.S.,
Building.
“There seems to be no single, restricted, and well-accepted definition of the term [building].”
Great Eastern Casualty Co. v. Blackwelder,
Ga.App.,
The words “public building” may have either a narrow meaning or a broad meaning. A broad meaning of a “public building” includes any building used by the government. See Black’s Law Dictionary. A narrow meaning limits a “public building” to a building open to the public. 29
Del.C.
§ 6917. In construing a statute, a word’s use in a particular context is more important than a dictionary meaning.
U. S. v. Bradford,
In
Barnes v. Scranton Poor District,
Pa. Super.,
A case which is similar to the present case is
Deary v. Town of Dudley,
Mass. Supr.,
Chapter 69, Title 29,
Delaware Code,
provides a unified system for bidding on public projects and the words “public works contracts” are used throughout the chapter to indicate projects to be covered by the Act. “Public works contracts” is defined to mean “any contract for the construction, alteration or repair of any publiс building, road, street, highway or other improvement.” 29
Del.C.
§ 6901. The General Assembly, however, limited the scope of 29
Del.C.
§ 6911 to “public buildings” rather than to “public works contracts” when it provided for the mandatory listing of subcontractors. The General Assembly, therefore, must have intended “public buildings” in 29
Del.C.
§ 6911 to have a more restricted meaning than “public works”. The Legislative body is presumed to have inserted every provision for some useful purpose and construction, and when different terms are used in various parts of a statute, it is reasonable to assume that a distinction between the terms was intended.
Albano v. Kirby,
N.Y.App.,
In construing statutory language courts should relate words in question to associated words and phrasеs in the statutory context.
Commonwealth v. Baker,
Mass. Supr.,
In
Masten Lumber and Supply Co., Inc. et al. v. Brown et al.,
Del.Supr.1979,
The provisions of 29 Del.C. ch. 69 must, therefore, be considered and construed together and harmonizеd if reasonably possible. It is a basic principle of draftsmanship that a statute can define terms as the lawmakers see fit in order to make clear what is intended. Stiftel v. Malarkey, supra. In 29 Del.C. § 6917 “public building” is defined as “any building all or part of which is usually held open to the public and which is owned, rented or to be rented by any governmental unit.” It is reasonable to assumе that the General Assembly intended public buildings to have the same meaning throughout chapter 69, title 29, Delaware Code because that chapter provides a unified scheme for publiс bidding on public works.
“Public building”, as used in 29 Del.C. § 6911, is limited, therefore, to a building which is usually held open to the public. A sewer system pumping station does not fall within that limitation. .
My holding is consistent with the holdings in
Dasey Concrete, Inc. v. City of Wilm.,
Del.Ch., C.A. # 4977-N.C. (unreported 1/30/76) and
Cropper & Thomas, Inc. v. Fontana Bros.,
Del.Super., C.A. # 674-N.C. (unreported 2/6/74). It is also сonsistent with
Bader v. Sharp,
Del.Ch.,
I have not considered and do not decide whether a public body may by specification or condition require the listing of subcontractors, even if not required by 29 Del.C. § 6911.
In summary, it is conceded that C & T was the low bidder on the sewer system construction project and its bid is suspect only because it did not contain a list of subcontractors. Since the Delaware Code does not require that a bidder list its subcontractors on a public sewer system, C & T’s application for injunctive relief must be granted.