113 Minn. 382 | Minn. | 1911
The facts in the case, as disclosed by the findings of the trial court, are as follows:
A contract for the construction of the Young Mens Christian Association building in the city of St. Paul was awarded to George J. Grant. In preparing his proposal for the contract, Grant obtained from other contractors proposals or bids for different parts of the work. He offered the marble and tile work in one subcontract. Plaintiff in this action, a corporation engaged in marble construction work, contemplated bidding for that part of the work, and solicited defendant, a contractor in tiling, to submit a proposal to plaintiff for the tile work. Defendant thereupon submitted to • plaintiff a verbal offer to do the tile work in accordance with the plans and-specifications for a stated price per lineal foot for certain parts of the work and a certain price per square foot for other parts. Plaintiff subsequently requested defendant to reduce his offer to a lump or fixed amount, and suggested that he examine the plans and specifications in the office of Butler Brothers, in the city of St. Paul. Defendant made the examination, but, having left his spectacles at
Grant subsequently requested some modifications in plaintiff’s bid, caused by changes made by the owner of the building to be constructed, and plaintiff in turn requested of defendant a new statement of his offer, which request was in the form of a letter bearing-date March 5, 1907, in the following language:
“We have been figuring some little changes in the marble and tile work for the Y. M. C. A. building, and we would like to have a letter from you stating how much per square foot we should allow for the tile floors in toilet rooms. Kindly let us have your written proposal for doing the whole job, and embody in your letter the price per foot to deduct for work which will not be required.”
To this defendant replied on March 11, 1907, as follows: “I will furnish and lay tile in Y. M. O. A. building, as per plans and specifications, for $894. Por all vit [meaning vitreous] tile cut out, deduct 45 cents per square foot.”
Plaintiff made no reply to this last proposal of defendant until October 25, 1907, when it was formally accepted in writing. In the meantime the contract had been awarded by Grant to plaintiff. Shortly- after the receipt of. plaintiff’s letter of acceptance, just referred to, defendant discovered that he had made a mistake in his offer, and notified plaintiff that he would not perform the same. His computations of space to be covered were made on the theory that the. plans were drawn on a scale of one-fourth of an inch to
In connection with the finding that plaintiff had no actual notice of defendant’s mistake, the court found that it ought to have known thereof, and by the exercise of reasonable care and prudence could have ascertained the fact. After the contracts had been entered into some changes were made in the building plans, by the mutual consent of the contractors, plaintiff and Grant, and the owners of the building, by which, among other things, the tile work was materially and substantially reduced. Plaintiff performed its con-' tract, doing both the marble and the tile work. The latter, as re-' duced by the changes in the plans, was reasonably worth and of the value of $1,630.80, for which amount plaintiff demanded, judgment against defendant for his breach of and refusal to perform the contract. Defendant pleaded ' in defense a mutual mistake ■ in respect to his proposal to do the tile work, lack of-mutuality in the contract obligations, and want of consideration. The trial court held that defendánt was entitled to equitable relief upon the grounds of mutual mistake and lack of mutual obligations in the contract between plaintiff and defendant. Judgment was ordered for defendant, which was entered, and plaintiff appealed.
The assignments of error challenge certain of the findings of the court, its refusal to modify and amend the same, and the conclusion of law. that defendánt was entitled to judgment. 'It is unnecessary to consider all these assignments, for our conclusion, upon
1. The first ground upon which the trial court based its decision was that there was a mutual mistake of fact, justifying the relief granted. In this we are unable to concur. The power of a court of equity to relieve parties from their contracts, upon the ground of mutual mistake of fact, or mutual mistake of mixed law and fact, is well settled and not questioned in the case at bar. To authorize the relief, however, the mistake must be clearly shown to be mutual to both parties, for equity will rarely relieve from the mistake of one of the parties, except in those instances where the mistake was in a measure induced or brought about by the inequitable conduct of, or when known to and wrongfully. acted upon or taken advantage of by, the other contracting party. Mutual mistake consists in a clear showing of a misunderstanding, reciprocal and common to both parties, in respect to the terms and subject-matter of the contract, or some substantial part thereof. We fail to discover, from the findings, a mistake of this character.
Defendant prepared and presented his proposal for the work upon his independent judgment and after an examination of the plans and specifications. Plaintiff in no manner assisted in securing the information necessary to a determination of the amount of work to be done, and it does not appear that any of its agents were familiar with the facts in reference to the amount of work or the value thereof. 'The finding of the court below that plaintiff ought to have known, and with the exercise of reasonable care could have ascertained, the facts, does not bring the case within the rule of mutual mistake. Plaintiff was under no obligation to investigate and discover the mistakej The relations between the parties were not of a character to require' of plaintiff efforts to discover whether or. not a mistake had been made, and its failure to do so does not deprive it of the right to insist that the contract be performed. But if, as intimated in the memorandum of the trial court, plaintiff discovered or was informed of the mistake by defendant’s repudiation of his offer, or possessed knowledge of facts sufficient in equity and good
2. We also are of the opinion, and so hold, that the court below erred in its conclusion that there was want of mutuality in the-obligations and that the contract was therefore not enforceable. While it is probable that defendant’s verbal proposal and plaintiff’s verbal acceptance thereof were both superseded by the subsequent written proposal and acceptance, it is clear that the latter constituted a valid contract between the parties. Chaplaine v. Gruner, 137 Mo. App. 451, 118 S. W. 665; Brown v. Levy, 29 Tex. Civ. App. 389, 69 S. W. 255. Nor is it material that the offer and acceptance contemplated that changes in the plans of the building might reduce defendant’s proposal to such an extent as to leave no work for him to perform. The plans and specifications made provision for changes and alterations, and defendant was informed of and well understood that fact. His offer must therefore be taken to have been made subject to the exercise of that right by the owner of the building. Unless changes and alterations were made entirely eliminating the tile work, defendant was entitled to perform the same, and plaintiff, to whom the contract was awarded, would have been liable as -for a breach of the contract had it refused him the right to do so. The consideration necessary to support the contract is
3. This covers all questions necessary to be considered. It is not a case where judgment should be ordered for plaintiff, and a new trial will be awarded.
Judgment reversed and a new trial ordered.
On February 17, 1911, the following opinion was filed:
Attention is called in a petition for a rehearing to an error in the opinion wherein it is stated that “plaintiff claims to have verbally accepted this offer * * * early in 1906.” The date given should have been 1907, but is not important for the subsequent written acceptance completed the contract. Counsel are in error in' the suggestion that this court may look to the evidence and be guided thereby as to facts not embraced within the findings. The findings of the trial court control the disposition of the case in this court.
Application for rehearing denied.
See opinion on page 388, infra-