MEMORANDUM OPINION
Presently pending and ready for resolution in this Fair Labor Standards Act (“FLSA”) case are motions for conditional certification of a collective action and facilitation of notice (ECF No. 41), and to seal (ECF No. 43) filed by Plaintiffs Jeffry Butler and Charles Dorsey. Also pending is a motion to seal filed by Defendants DirectSAT USA, LLC (“DirectSAT”), UniTek USA, LLC (“UniTek”), and UniTek Global Services, Inc. (“UGS”). (ECF No. 56). The issues are fully briefed, and the court now rules pursuant to Local Rule 105.6, no hearing being deemed necessary. For the reasons that follow, Plaintiffs’ motion for conditional certification of a collective action and facilitation of notice will be granted in part and denied in part, as will the parties’ motions to seal.
I. Background A. Factual Background
Defendant DirectSAT, a subsidiary of UniTek and UGS, provides satellite installation services to DirectTV customers throughout the country. Plaintiffs are technicians who previously installed, upgraded, and serviced DirectTV equipment at customer locations in Maryland, Virginia, and the District of Columbia. (See ECF No. 41-8) (setting forth the job description for the “technician” position).
Defendants pay their technicians “based on job or piece rates.” (ECF No. 54, at 14).
Plaintiffs assert that although Direct-SAT’s employee handbook provides that technicians will be paid for any overtime hours worked, the company did not follow
Plaintiffs also insist that they were instructed by their general managers not to record overtime on their weekly time-sheets. Mr. Butler occasionally recorded his excess hours despite this instruction, but the company regularly refused to pay him overtime. Mr. Dorsey’s timesheets were returned to him for correction when he recorded more than forty hours in a given week, and he does not recall ever being paid any overtime. Both complained to management at their warehouses about this issue. In response, management informed them that “[tjhere was nothing [it] could do” because the non-payment of overtime was “a corporate decision” (ECF No. 54-15, Butler Dep., at 31), and that “[t]hose were the rules, follow them or work somewhere else,” (ECF No. 54-17, Dorsey Dep., at 24).
B. Procedural Background
Plaintiffs filed a complaint against Defendants on October 4, 2010, on behalf of themselves and similarly situated others.
On November 1, 2011, Plaintiffs moved for conditional certification of a collective action for DirectSAT technicians based out of the company’s Waldorf and Beltsville warehouses during the past three years. (ECF No. 41).
After taking Mr. Dorsey’s deposition, Defendants filed their response to Plaintiffs’ motion for conditional certification. (ECF No. 54). They submitted numerous exhibits in support of their opposition and filed a motion to seal twelve of those exhibits pursuant to the confidentiality order. (ECF No. 56). Plaintiffs timely replied to Defendants’ opposition. Both interim motions to seal, as well as Defendants’ motion to compel discovery responses, are unopposed.
II. Motion for Conditional Certification and for Court-Facilitated Notice
“Under the FLSA, plaintiffs may maintain a collective action against their employer for violations under the act pursuant to 29 U.S.C. § 216(b).” Quinteros v. Sparkle Cleaning, Inc.,
An action ... may be maintained against any employer ... in any Federal or State court of competent jurisdiction by any one or more employees for and in behalf of himself or themselves and other employees similarly situated. No employee shall be a party plaintiff to any such action unless he gives his consent in writing to become such a party and such consent is filed in the court in-which such action is brought.
“This provision establishes an ‘opt-in’ scheme, whereby potential plaintiffs must affirmatively notify the court of their intentions to be a party to the suit.” Quinteros,
A. Conditional Certification Is Appropriate Because Plaintiffs Have Made a “Modest Factual Showing” that Technicians in the Waldorf and Beltsville Warehouses Are “Similarly Situated”
“Determinations of the appropriateness of conditional collective action certification ... are left to the court’s discretion.” Id.; see also Hoffmann-La Roche, Inc. v. Sperling,
Here, Defendants assert that the court should require Plaintiffs to make a heightened showing (through use of an “intermediate standard”) because the parties have completed some discovery. (ECF No. 54, at 20-22). Defendants cite several cases from other districts to support this argument, but they identify no authority for this proposition within the District of Maryland.
One rationale ... is that “when the parties have engaged in only limited discovery, it is premature to conclude that the evidence is representative of what the plaintiffs would present given further discovery.” Helmert v. Butterball, LLC, No. 4:08CV00324 JLH,2009 WL 5066759 , at *6 (E.D.Ark. Dec. 15, 2009) (citing Gieseke v. First Horizon Home Loan Corp.,408 F.Supp.2d 1164 , 1166-67 (D.Kan.2006)). A second justification is that “the notice stage analysis places the burden of proof on the plaintiff, but the opt-in stage analysis, which typically follows a motion to decertify, places the burden of proof on the defendant; merging the two stages of analysis would inevitably skew the burden of proof.” Id. (citing Hammond v. Lowe’s Home Ctrs., Inc., No. Civ. A. 02-2509-CM,2005 WL 2122642 , at *3 (D.Kan. Sep. 1, 2005)).... Another policy concern ... [relates to] the calibration of the intermediate standard. Although [the defendant] calls for an “intermediate” standard, [the defendant] has failed to give the Court guidance regarding the location of this standard between the poles that the first- and second-stage analyses occupy.
Id. The same concerns exist here and counsel against adoption of the intermediate standard espoused by Defendants. If Plaintiffs succeed in making only the “minimal evidentiary showing” required at this initial stage, Rawls,
To meet this burden and demonstrate that potential class members are “similarly situated,” Plaintiffs must set forth more than “vague allegations” with “meager factual support” regarding a common policy to violate the FLSA. D’Anna,
Second, Mr. Butler and Mr. Green have submitted declarations attesting to the practices that Mr. Hanson described. Both assert that they worked as technicians for DirectSAT, that they were based out of the Waldorf and/or Beltsville warehouses, and that they typically worked in excess of sixty hours per week but were not compensated for all of this time. (ECF No. 41-9, at 1, 4). Additionally, Mr. Butler and Mr. Green both state that company officials directed them not to record all of the time they worked, which “meant [they] were only supposed to record the time worked from arriving on site at [their] first job until completing [their] last job of the day.” (Id.). As a result, the company “caused” both Mr. Butler and Mr. Green “to work ‘off the clock’ ” performing uncompensated tasks such as preparing satellite dishes at home, pre-calling customers, planning routes, and attending warehouse meetings during ten or more hours per week. (Id. at 2, 5). These assertions suggest that technicians in the Waldorf and Beltsville warehouses were subject to a common policy, plan, or scheme that violated the' FLSA. See Essame,
Third, deposition testimony from Mr. Butler, Mr. Dorsey, and Mr. Green largely corroborates the above statements. Each testified that warehouse managers and supervisors instructed him not to record any overtime hours on his timesheets even though he routinely worked in excess of forty hours in a given week. (ECF No. 41-9, at 2-5; ECF. No. 54-15, at 30; ECF No. 54-16, Green Dep., at 20; ECF No. 54-17, at 13). Indeed, both Mr. Dorsey and Mr. Green stated that their timesheets were returned to them on the infrequent occasions when they tried to record more than forty hours in a given week, with an instruction from a project administrator to adjust the number of hours to no more than forty. (ECF No. 54-16, at 21; ECF No. 54-17, at 23-24). The three technicians also testified that they were told not to record most of the pre- and post-shift work they did at home or at the warehouses, which Mr. Butler and Mr. Dorsey insisted that management either strongly encouraged or directed them to perform.
Defendants present several counterarguments in an effort to avoid conditional certification. First, they emphasize their formal policy of paying overtime and instructing all technicians to record “all time worked for payroll and benefit purposes,”- (ECF No. 54, at 14), and contend that there is no-evidence they employed contrary informal policies in practice. “[I]t is well-settled,” however, “that the promulgation of written policies, per se, is insufficient to immunize an employer from conduct that otherwise contravenes the FLSA.” Essame,
Defendants also contend that the allegations made by Mr. Butler, Mr. Dorsey, and Mr. Green are dissimilar and warrant individualized treatment. They specifically highlight differences in the time periods these three individuals worked as technicians, the manner in which they recorded time on their timesheets, and the amount of time and type of tasks they performed “off the clock.” (ECF No. 54, at 28-41). This argument, however, “delves too deeply into the merits of the dispute” at this initial notice stage. Essame,
Defendants next argue that the court should deny Plaintiffs’ request for conditional certification because Mr. Butler and Mr. Green’s declarations are not credible and because Defendants have submitted an expert report, declarations, and testimony to contradict Plaintiffs’ assertions. This argument is also without merit. As an initial matter, it is not clear that purported discrepancies between Mr. Butler and Mr. Green’s declarations and deposition testimony are actually discrepancies at all. See Sjoblom v. Charter Commc’ns, LLC,
Additionally, even if purported discrepancies did cast some doubt on Mr. Butler or Mr. Green’s credibility, the court would not deny conditional certification on that basis alone because “credibility determinations are usually inappropriate for the question of conditional certification.” Essame,
Defendants further argue that conditional certification is improper because Plaintiffs have not identified other employees who “actually desire to join the proposed collective action.” (ECF No. 54, at 49). They cite numerous out-of-district cases in support of this argument. At the outset, this contention would appear to be without merit because two other technicians (Mr. Green and Mr. Baker) have sought to join this action as opt-in plaintiffs since Plaintiffs filed their motion for conditional certification.
Finally, Defendants rely heavily on a subsequent opinion from the Espenscheid court decertifying the nationwide class of DirectSAT technicians it had conditionally certified, contending that this opinion proves Plaintiffs will ultimately be unable to demonstrate that they are “similarly situated” to one another. (See ECF
Setting aside the distinct procedural postures of the cases, Defendants also fail to appreciate critical factual differences between Espenscheid and the present action. Espenscheid involved a nationwide class of more than 1,000 DirectSAT technicians, while this case involves technicians at only two DirectSAT warehouses in Maryland. In decertifying the collective action, the Espenscheid court emphasized the plaintiffs’ repeated failure to submit a satisfactory trial plan addressing certain technician subclasses that the court had imposed following conditional certification. It also expressly noted that the record— which the parties had developed during subsequent discovery — demonstrated that
In the end, despite Defendants’ vigorous assertions to the contrary, the evidence presented by Plaintiffs is sufficient to make the “minimal evidentiary showing” that a common policy or scheme to violate the FLSA existed in Defendants’ Waldorf and Beltsville warehouses. Rawls,
B. Court-Facilitated Notice to Potential Opt-in Plaintiffs Is Proper
Because Plaintiffs have made a preliminary showing that technicians in the Waldorf and Beltsville warehouses are “similarly situated,” notice of this action will be provided to technicians who currently work, or have worked in the past three years, out of these two locations. Plaintiffs have submitted a proposed notice form that they contend is “fair and adequate.” (ECF No. 41, at 10). They request to send this notice by first-class mail and by email. They also ask that the court give potential opt-in plaintiffs ninety days from the date the notice is mailed to determine whether to join the collective action. Defendants oppose the form of the notice, the request to send notice via email, and the ninety-day opt-in period requested by Plaintiffs. Plaintiffs have not responded to any of these objections.
The district court has broad discretion regarding the “details” of the notice sent to potential opt-in plaintiffs. Lee v. ABC Carpet & Home,
Defendants’ requests to shorten the opt-in period and to prevent Plaintiffs from notifying potential plaintiffs via email will be denied. With regard to the length of the opt-in period, Defendants’ concern that a ninety-day period would result in “a never-ending certification process” is unwarranted. (ECF No. 54, at 56) (internal quotation marks omitted). Notice periods may vary, but numerous courts around the country have authorized ninety day opt-in periods for collective actions. See, e.g., Wass,
Both parties have also filed unopposed motions to seal. A motion to seal must comply with Local Rule 105.11, which provides:
Any motion seeking the sealing of pleadings, motions, exhibits or other papers to be filed in the Court record shall include (a) proposed reasons supported by specific factual representations to justify the sealing and (b) an explanation why alternatives to sealing would not provide sufficient protections. The Court will not rule upon the motion until at least 14 days after it is entered on the public docket to permit the filing of objections by interested parties. Materials that are the subject of the motion shall remain temporarily sealed pending a ruling by the Court. If the motion is denied, the party making the filing will be given an opportunity to withdraw the materials.
This rule endeavors to protect the common law right to inspect and copy judicial records and documents, Nixon v. Warner Commc’ns, Inc.,
Before sealing any documents, the court must provide the non-moving party with notice of the request to seal and an opportunity to object. Id. This notice
requirement may be satisfied by either notifying the persons present in the courtroom or by docketing the motion “reasonably in advance of deciding the issue.” Id. at 234. Finally, the court should consider less drastic alternatives to sealing, such as filing redacted versions of the documents. If the court decides that sealing is appropriate, it should also provide reasons, supported by specific factual findings, for its decision to seal and for rejecting alternatives. Id. at 235.
The parties seek to seal certain exhibits in connection with their motion papers addressing conditional certification and court-facilitated notice. These exhibits, produced pursuant to a court-approved confidentiality order, include Defendants’ employee handbooks and policy manual, payroll and other personnel records for Defendants’ employees, a document signed by Mr. Butler acknowledging receipt of the employee handbook, a document explaining Defendants’ piece-rate compensation system, and an expert report concluding that Defendants did not employ an informal policy against payment of overtime. With regard to Defendants’ employee handbooks, policy manual, and personnel records, the “confidential” designation would not seem to be without basis. Indeed, Defendants emphasize that these exhibits contain proprietary business information and sensitive personnel records. Thus, the exhibits containing these items or excerpts thereof will be sealed.
The parties’ requests to seal the remaining exhibits will be denied.
IV. Conclusion
For the foregoing reasons, Plaintiffs’ motion for conditional certification and for court-facilitated notice will be granted in part and denied in part, as will both parties’ motions to seal. A separate Order will follow.
Notes
. Defendants classified Plaintiffs' positions as non-exempt under federal and state wage and hour laws.
. In this memorandum opinion, the page numbers cited in the text are the page numbers provided by the ECF system.
.Prior to this time, Mr. Butler had opted-in to a nationwide collective action against Defendants that was proceeding in the United States District Court for the Western District of Wisconsin. He subsequently elected to opt-out of that action, but he did not obtain court approval to do so as required by Federal Rule of Civil Procedure 41(a). Before decertifying that collective action, the Wisconsin court entered partial summary judgment in favor of Defendants, concluding that a limited number of pre- and post-shift tasks at issue in that case were not compensable under the FLSA. Espenscheid v. DirectSAT USA, LLC, No. 09-cv-625-bbc, slip op. at 49-52 (W.D.Wis. April 11, 2011). When the collective action was decertified, the court dismissed the remaining claims without prejudice to the opt-in plaintiffs.
. Specifically, the court dismissed Plaintiffs’ claim under the Maryland Wage Payment and Collection Law, Md.Code Ann., Lab. & Empl. § 3-501, et seq. All other claims were allowed to proceed.
. Plaintiffs have presumably not sought conditional certification for technicians who worked in the Capitol Heights warehouse because it closed in early 2008, a time period outside the FLSA’s three-year statute of limitations.
. Two technicians at DirectSAT — Derrick Green and Gary Baker — have since filed consent forms seeking to opt-in as plaintiffs. (ECF Nos. 40, 51). The parties have submitted a declaration and deposition testimony from Mr. Green in support of their positions in this case. (No such information was submitted from Mr. Baker.) Mr. Green worked out of DirectSAT's warehouses in Capitol Heights, Waldorf, and Beltsville, Maryland from August 2007 through July 2010. He has stated that, while employed at these locations, he received instructions to perform work "off the clock” and to avoid recording more than forty hours per week on his timesheets. (See generally ECF No. 41-9, Green Deck, at 4-5).
. Shortly before the telephone conference, Plaintiffs filed a letter with the court, stating that they had provided all necessary discovery responses. (ECF No. 48). Defendants' motion to compel these responses was not resolved during the telephone conference. On March 28, 2012, Defendants filed a second motion to compel discovery responses from Mr. Dorsey. In that motion, Defendants indicated that Mr. Dorsey had responded to their interrogatories and document requests in late 2011, but that he had not responded to a subsequent request regarding discrepancies between his deposition testimony and responses to document requests. (ECF No. 61). Accordingly, Defendants' original motion to compel will be denied as moot. The new motion to compel will be resolved following full briefing by the parties.
. Defendants cite Slavinski v. Columbia Ass’n, Inc., No. CCB-08-890,
. Defendants’ assertion that the recent opinion of the Supreme Court of the United States in Wal-Mart Stores, Inc. v. Dukes, - U.S. -,
. To the extent Defendants’ brief suggests that Plaintiffs have not submitted a sufficient number of declarations to support conditional certification, this argument is patently without merit. The crux of the "similarly situated” analysis is not quantitative; rather, it focuses on whether plaintiffs have demonstrated by "affidavits or other means” that a common policy, plan, or scheme to violate the FLSA exists. Williams,
. The numerous cases cited by Defendants in support of this argument are, therefore, inapposite because they all involved circumstances in which no evidence existed of an informal company policy that violated the FLSA. See, e.g., Syrja,
. In Makes, the defendant wanted to use an expert report to demonstrate that the plaintiffs, who asserted that they were routinely denied lunch breaks, were not "similarly situated.” "[A]ccording to the report, [the plaintiffs] ha[d] all received some overtime compensation ... and ha[d] been tracked on a GPS device at restaurants for more than their half-hour lunch break.” Id. The court reasoned, however, that the plaintiffs had identified flaws in the report’s method, which made reliance on the report at the initial notice stage improper.
A similar conclusion is warranted here. Much like the defendant in Makes, Defendants have submitted an expert report to demonstrate that technicians in the Waldorf and Beltsville warehouses are not "similarly situated” because there is no informal policy denying overtime compensation. In the report, Crandall compares technicians’ payroll hours with the hours recorded on their vehicles’ GPS devices and concludes that differences between these two records contradict Plaintiffs’ claims. Yeit as Plaintiffs point out, the tables of records that accompany Crandall’s report reveal that the GPS devices recorded many technicians working well in excess of forty hours per week. These hours did not, however, correspond to the hours recorded on technicians’ timesheets, which could suggest systematic under-reporting of hours. Additionally, the principal basis of Plaintiffs’ FLSA claim is that Defendants instructed them not to record pre- and post-shift work performed at home. If this assertion is proven true, the records on which Crandall’s report relies would not have captured any of this time. Accordingly, at this early stage, Defendants’ expert report does not preclude certification of a collective action.
. The clerk will be .instructed to add Mr. Green and Mr. Baker to the docket as opt-in plaintiffs.
. Defendants also contend that Mr. Butler’s involvement in the Espenscheid case renders him an inadequate representative to potential plaintiffs in this case, thus requiring the court to deny conditional certification. This argument suffers from numerous flaws and must, therefore, be rejected. First, while a handful of courts have found the adequacy of a named plaintiff to be an "equitable consideration” in determining whether to grant conditional certification, e.g., In re FedEx Ground Package Sys., Inc.,
Yet even if the court found Mr. Butler’s adequacy as a named plaintiff to be an "equitable consideration” at this stage, the action would nonetheless proceed. When the FedEx Ground court declined to grant conditional certification due to inadequacy of the named plaintiffs, it did so only after first concluding that neither of the original named plaintiffs was adequate.
Defendants' asserted reasons for Mr. Butler's purported inadequacy are also unpersuasive. The Espenscheid court may have concluded that the members of a nationwide class of Directs AT technicians were not "similarly situated” to one another, but it made no findings regarding whether Mr. Butler is “similarly situated” to the putative class at issue here. In addition, even if — as Defendants contend— Mr. Butler is collaterally estopped from pursuing compensation for a limited number of pre- and post-shift tasks by the Espenscheid summary judgment ruling, there are numerous other forms of pre- and post-shift work that Mr. Butler alleges he performed without compensation. Finally, the fact that Mr. Butler was employed during a different time period than Mr. Green and Mr. Dorsey and that his claims would require a three-year limitations period go to individualized inquiries and merits considerations that are inappropriate at this stage of the case. See Essame,
. Plaintiffs have also requested that the court appoint their counsel as counsel for this collective action. Defendants have not opposed this request. Thus, any potential opt-in plaintiff who does not enter an appearance through his own counsel, or indicate a desire to represent himself, will be represented by Plaintiffs' counsel.
. Pursuant to Plaintiffs’ motion papers, the court will also clarify the scope of the collective action to make clear that it covers only technicians who worked out of the Waldorf or Beltsville warehouses during the past three years.
.To effectuate this notice, Defendants will be required to produce a file containing the full names and last known home and email addresses of potential opt-in plaintiffs within fourteen days of the issuance of the accompanying Order. Defendants will not, however,
. In their motion to seal, Plaintiffs state only that they seek to seal the exhibits pursuant to the confidentiality order, an explanation insufficient to satisfy the "specific factual representations” that Local Rule 105.11 requires. Sensormatic Sec. Corp. v. Sensormatic Elec. Corp.,
. These exhibits are: ECF Nos. 42-2, 42-3, 42-4, 54-1, 54-2, 54-3, 54-4, 54-5, 54-6, 54-7, 54-8, and 54-10.
. These exhibits are: ECF Nos. 42-1, 54-9, 54-11, and 54-12.
.Defendants’ expert report is partially based on the employee payroll records submitted with their opposition papers, but the report does not discuss those records in any detail. Rather, the expert report merely presents a high-level summary of the total hours listed on employee timesheets. Defendants’ opposition papers, which they have not moved to file under seal, also quote extensively from this report.