96 Mo. App. 467 | Mo. Ct. App. | 1902
This is a suit by appellant against defendants, Rnsco & Chaffee, contractors with plaintiff for the erection of a three story brick building in St. Joseph, Missouri, and the Fidelity and Deposit Company, their surety on a bond for the performance of the contract. Judgment was rendered against the defendants, Rusco & Chaffee, for the sum of $4,458.77. The court on the hearing of the case instructed for a finding for the Fidelity and Deposit Company, whereupon the plaintiff took a nonsuit against said company, and it is the judgment of the court in refusing to set ■aside same, from which plaintiff appeals.
The defendants, Rusco & Chaffee, by their contract in writing, dated the thirty--first’ day of May, 1898, undertook and agreed under the direction of .Messrs. Felt & Carr, architects, to erect a three-story brick building for plaintiff, and to provide and pay for all labor and materials necessary for the construction and completion thereof, as shown by certain specifications and drawings, and to fully complete said work on or before the first day of November, 1898, in consideration for which plaintiff was to pay them the- sum of $27,454, to be paid as the progress of said work should justify, etc. It was also agreed between the parties that.written alterations might be made in the work described in said drawings and specifications, upon the written order of the architects, and that when so made the value of the work so added or omitted should be added to, or deducted from the contract price, and that the work of .driving piling, and increasing footings, in addition to the amount specified in said contract, should be paid for extra.
A large -number of liens were enforced against the building, which plaintiff was compelled to pay. There is no objection urged against the judgment
But it is contended by the appellant that the increased work for the excavations and footings for the building were contemplated and provided for in the contract. The contract reads: “It is further agreed that the work of driving piling, or increasing the footings in addition to the amount specified is to be paid for in addition to the amount herein mentioned. ’ ’ It appears that it became necessary to make additional excavations and increase the footings in order that the building be erected upon a sure foundation. This provision of the contract clearly indicates that it was in the minds of the parties to the contract that a contingency might arise which would necessitate the additional work, which is claimed voided the contract of the surety, because it was done without the written consent of the architects. By the terms of the contract itself, the contractors were bound to perform the additional work, if the contingency arose, and it follows that the surety was also bound. The specifications in that respect were not like other specifications, which might be modified from time
But it is claimed by defendant that it was released by the other changes made in said specifications without the written order of the architects, viz.: a vestibule door, provided for the entrance to the main.building, as was also some of the tiling, was left out, and a copper roof was substituted for a glass roof. All these changes were made with the consent of the owner of the building but without the consent of the surety. But appellant claims that, as these changes did not materially enhance the cost of the structure, the liability of the surety was not affected. The question does not depend upon whether there was an increase or diminution in dollars and cents of the contract price, but upon a change in the contract itself. If a change be made in the contract without his consent, the surety is discharged. * ‘ The law is, that a surety has the right to stand upon the letter of the contract, and any alteration thereof without his consent, even though designed for his benefit, will discharge him.” Fullerton Lumber Co. v. Gates, supra; Beers v. Wolf, 116 Mo. 179; Bauer v. Cabanne, 105 Mo. 118; Nofsinger v. Hartnett, 84 Mo. 549.
It was a material change to substitute a copper roof