146 A. 709 | Pa. | 1929
Argued January 7, 1929. The facts in this case are similar to those in the preceding case. The Middle-City Real Estate Company, grantee of the premises, and Bassett and Kille, grantors and officers of the company, proposed to extend their garage located on the south side of Latimer Street between Fifteenth and Sixteenth Streets in Philadelphia. It is but a few doors from Hollinger's garage in the previous case on the same side of the street. The plaintiff brought this bill to enjoin the construction. The extension in the rear was to be three stories high and it was planned to replace the present garage with a similar construction. Together they will be 187 feet long and 44 feet wide. The building was to be fireproof with ramps to each floor, metal window frames and wire glass, and house 130 cars when completed. It was to have no repair nor machine shop. While defendants' property runs through to the north side of Spruce Street, the entire frontage on that street, for a depth of 50 feet, was not to be used for garage purposes. The court below refused to enjoin the construction.
The material assignment which will be discussed, which differs from the preceding case, is the finding of the trial judge, that the district was no longer predominantly residential in character. The finding as to the character of the locality was made in connection with *528
the identical neighborhood considered in the previous cases; obviously the two findings could not stand together. This finding, while material to the determination of this case, will not defeat the conclusion that followed. To avoid, however, a misunderstanding in the future, it will be discussed briefly. As stated in the prior case, commercial interests have intruded and this present district lies on the border of a strictly commercial district, but considering the apartment dwellers (Satterthwait v. Gibbs,
From our examination of the record we adopt the finding in the preceding case and deny the finding in this case. All the other questions presented were present in the Hollinger Case and have been discussed.
We affirm the order of the court below with the modification that the garage will be conducted in the like manner as the one before the court in the preceding Hollinger Case and any violation of those instructions will be brought to the attention of the court below for immediate redress. To this end we direct that the order dismissing the bill be revoked and that the bill be reinstated and remain pending for future action. Costs to be equally divided between the parties hereto. *529