143 Mich. 10 | Mich. | 1906
Plaintiff and defendant, in August, 1903, entered into a contract having the form of a proposal and acceptance, in the following terms:
“Columbus Machine Co.,
‘ ‘ Columbus, Ohio,
“ Manufacturers of Gas and Gasoline Engines.
“Mr. E. P. Bunday,
“St. Johns, Mich.
“We propose to furnish and deliver f. o. b. cars Columbus, Ohio, one 40 H. P. gasoline engine, specified as follows:
“Horse Power. The engine shall be of 40 actual horse power, and shall be tested at our works before shipment, and 40 actual horse power shall be developed.
“ Supplies. There shall be furnished by us with each gasoline engine one 56x14 in., one 30x12 in. drive pulley; one set of batteries with spark coil (batteries guaranteed for period of three months when properly installed); switch and 20 feet of wire; 100 gal. gasoline tank; neccessary wrenches, oilers, and muffler; but no piping unless specified in this contract. All piping and fittipgs for gasoline and water. All exhaust pipe and fittings to extend out of engine room. One plunger pump for water circulation. One exhaust pot. One 24x14 in. friction clutch pulley for line shaft 2 3-16 in. bore.
“ Foundation. You are to build foundation according to plans furnished by us, and you are to furnish a competent man to assist in installing engine.
“Defective Material. We will furnish free of charge any defective part or parts for a period of one year. Also guarantee the engine not to use to exceed one gallon of 74 degrees gasoline per horse power per ten hours when developing full load.
“Terms. Price ($1,150)eleven hundred and fifty dollars, payment to be made as follows: As soon as the engine is set and running successfully, I agree to pay three hundred dollars ($300) cash and one St. Johns 25 H. P. gasoline eng. complete f. o. b. cars St. Johns. One hundred and twenty-five dollars ($125) in 60 days from starting engine, one hundred dollars.($100) in four months and*12 one hundred dollars ($100) in six months from starting engine. With interest at 6 per cent, per annum, secured by-note subject to strjkes, fires or other unavoidable causes.
“ Ownership. Said engine shall not belong to you until the price herein stipulated shall be paid in full. Until the price herein stipulated is paid in full, the title and ownership in said engine is to be and to remain in the Columbus Machine Company, and said engine and machinery so furnished shall not become a part or parcel of the real estate to which it is attached, or be permanently attached to said real estate, but said engine and machinery shall be and remain the personal property of the Columbus Machine Company. Engine to have air starting outfit.
“ Respectfully submitted,
“Columbus Machine Company,
“Per H. C. King.
“Acceptance. The above proposal, especially that part thereof reading as follows: ‘ Said engine shall not
belong to you until the price herein stipulated shall be paid in full. Until the price herein stipulated is paid in full, the title and ownership in said engine is to be and to remain in the Columbus Machine Company, and said engine and machinery so furnished shall not become a part or parcel of the real estate to which it is attached, or be permanently attached to said real estate, but said engine and machinery shall be and remain the personal property of the Columbus Machine Company’ — is hereby accepted this 28th day of August, 1903.
“Columbian Maneg. Co.,
“Per E. P. Sunday.
“Engine must be delivered,on cars, Columbus, Ohio, within one week from above date.”
The engine was shipped and received by the plaintiff and set up on a foundation prepared for that purpose; the 25 horse power engine referred to in the contract was delivered to defendant, but the cash payment provided has not been made. It was soon discovered that the engine furnished by defendant failed to answer the guaranty as to the quantity of gasoline required, and after some delay and negotiations this action was brought. On a trial before a jury a recovery was had by plaintiff, and the case is brought before us for review on error.
Plaintiff’s counsel rely chiefly upon the cases of Chicago Railway Equipment Co. v. Merchants’ Bank, 136 U. S. 268; Choate v. Stevens, 116 Mich. 28 (43 L. R. A. 277); and Van Den Bosch v. Bouwman, 138 Mich. 624. In Chicago Railway Equipment Co. v. Merchants’ Bank, the contract was materially different from the one under consideration here, as is manifest from the finding of the trial judge (approved by a majority of the Supreme Court) that any one contemplating a purchase of the notes would draw the inference that the freight cars had already been sold by the payee to the maker, and that the
. For the error pointed out, the judgment is.reversed, and a new trial ordered.