OPINION AND ORDER
Richard L. Brodsky, Westchester’s Citizens’ Awareness Network, Public Health and Sustainable Energy, and the Sierra Club-Atlantic Chapter (collectively “Plaintiffs”) allege that the United States Nuclear Regulatory Commission (“NRC” or “Commission”) acted unlawfully in granting an exemption to Entergy Nuclear Operations, Inc. (“Entergy”), the owner, operator, and licensee of Indian Point Energy Center 1 (“IPEC” or “IP3”).
The NRC moves to dismiss the Complaint pursuant to Federal Rule of Civil Procedure (“Rule”) 12(b)(6), or, in the alternative, for summary judgment pursuant to Rule 56. At oral argument, all parties agreed that the case was appropriate for resolution on summary judgment. An administrative record has been submitted to the Court, and it is appropriate that the Court consider that record in reviewing the Commission’s actions. Therefore, the Court treats the Commission’s motion as one for summary judgment.
For the following reasons, the Commission’s motion for summary judgment is granted.
I. BACKGROUND
In 1954, Congress passed the Atomic Energy Act, as amended, 42 U.S.C. § 2011
et seq.,
(the “AEA” or “Act”). The Act created the Atomic Energy Commission, later renamed the Nuclear Regulatory Commission, to regulate and develop nuclear energy, including all nuclear plant licensing. The AEA is “virtually unique in the degree to which broad responsibility is reposed in the administrative agency, free of close prescription in its charter as to how it shall proceed in achieving the statutory objectives.”
Siegel v. Atomic Energy Comm’n,
In accordance with the AEA, the Commission is charged with determining whether a plant’s operation is “in accord with the common defense and security and will provide adequate protection to the health and safety of the public.” 42 U.S.C. § 2232(a). Additionally, under the AEA, the NRC has the power to amend, revise, or modify all licenses, by reason of rules and regulations issued by the Commission, See id. § 2237.
A. The Commission’s Fire Protection Program
In 1980, the NRC adopted fire safety rules in response to a nearly catastrophic fire at the Browns Ferry power plant. *451 The fire prompted the NRC to adopt a comprehensive program to prevent, detect, control, and extinguish fires in operating nuclear power plants. In promulgating these rules, the Commission’s goal was to design safe, alternative shutdown measures. A nuclear power plant must have duplicate systems for shutting down reactor units in the case of an emergency. The regulations, in part, set in place fire barriers to protect redundant systems that power the plant’s shutdown systems. See Fire Protection Program for Operating Nuclear Power Plants, 45 Fed.Reg. 76,602 (Nov. 19, 1980). These rules (codified at 10 C.F.R. § 50.48 and 10 C.F.R. Pt. 50 App. R) are at issue here. 2
The Commission’s rules provide three fire-safety options that a licensee could adopt to protect duplicate shutdown capacity. Id. These three methods are: (1) separation of cables and equipment of a redundant system by a barrier capable of withstanding fire for three hours; (2) separation of the redundant system by a distance of more than twenty feet with no intervening combustible material or fire hazards, together with fire detectors and an automatic fire suppression system; and (3) enclosure of cable and equipment and associated non-safety circuits of one redundant system in a barrier able to withstand fire for at least one hour, along with fire detectors and an automatic fire suppression system. 10 C.F.R. Pt. 50, App. R, III.G.2 (1980). The final rules stipulated that “alternative shutdown capacity” must be protected by one of these three methods. Id. In this case, Plaintiffs challenge the NRC’s decision to grant Entergy an exemption from the third method that requires electrical cables to withstand fire for at least one hour. (Compl. ¶ 15.)
In
Connecticut Light and Power Co. v. Nuclear Regulatory Commission,
According to the court, the exemption procedure indicated that the NRC did not intend “to limit protective measures to the three methods stipulated in the rule, 10 C.F.R. 50, App. R, III.G.2 (1980).” Id. at 536. Plaintiffs argue that the exemptions *452 in Connecticut Light concerned only those filed within thirty days of the new rules taking effect. Here, neither the Commission nor Entergy discovered that certain electrical cables were non-conforming to the rules established in 1980 until twenty-five years later in 2005. Therefore, the NRC argues that the Connecticut Light rationale for granting exemptions exists under the present circumstances.
B. The Indian Point 3 Nuclear Power Plant
Over approximately the last thirty years, Entergy applied for and received specific exemptions from the fire protection requirements at IP3. 3 The instant application to the Commission requested a revision to the earlier granted exemptions. First, in 1984, the NRC granted IP3 exemptions from the Appendix R features in designated areas, including Fire Area ETN-4 (Fire Zones 7A, 60A and 73A). (JA 44-55.) 4 At that time, IP3 was employing a fire barrier called Hemyc, which was believed to satisfy the one-hour fire requirement under Appendix R. Based on NRC’s investigation, the agency granted IP3 an exemption. (Id.) The exemption order discussed, among other things, the fire detection and suppression systems, the distance between shutdown systems, and the durability of the glass and asbestos braided cables in the areas based on a series of fire tests. (JA 50-51.) In the end, the Commission concluded that “the existing fire protection for the configuration inside the cable tunnels and electrical penetration area provides an acceptable level of fire protection equivalent to that provided by Section III.G.2.” (JA 51.) Second, in 1987, the NRC revisited the earlier-granted exemption for Fire Area ETN^4 and concluded that the exemption should still be considered valid. (JA 143-45.) Further, the Commission considered an additional exemption request for Fire Area PAB (Primary Auxiliary Building)-2 (Fire Zone 1). (JA 127, 138.) After analyzing the alternative fire protection measures, the NRC concluded that “if a fire occurs in this location, safe shutdown could still be achieved and maintained.” (JA 143.)
In 2005, the NRC discovered that Hemyc was actually nonconforming to its rules. Despite its one-hour fire barrier rating, it could only withstand a fire for 27 to 49 minutes. The NRC informed all licensees in the country of the deficiency with Hemyc cables. (NRC Information Notice 2005-07, JA 167.) The NRC directed licensees to confirm compliance with the existing regulations in light of this new information. (NRC Generic Letter 2006-03, JA 209.)
In June 2006, Entergy notified the NRC to potentially non-conforming Hemyc barriers at IP3. (JA 229.) Based on NRC tests, Entergy revealed that the Hemyc installations at IP3 were declared “inoperable.” (JA 230.) On July 24, 2006, Enter *453 gy requested the NRC provide it with revised exemptions from the Appendix R requirements for Fire Areas ETN-4 and PAB-2 which were granted in 1984 and 1987, respectively. (JA 234.) Entergy’s position was that a “Hemyc ERFBS [electric raceway fire barrier system] fire resistance rating of 30 minutes will provide sufficient protection for the affected raceways, with adequate margin, to continue to meet the intent of the original request for exemption and conclusions presented in the January 7, 1987 SER [safety evaluation report].” (JA 235.) Entergy attached to its request a safety report to support its revision request. (JA 234-51.) In that evaluation, Entergy discussed, inter alia, the Hemyc fire barriers, structural features in the two fire zones, ignition sources, transient combustible and hot work controls, and fire detection and suppression systems. (Id.)
In response, on February 2, 2007, the chief of the Commission’s Fire Protection Branch requested, by letter, additional information on the requested revision of existing exemptions. (JA 275.) The NRC forwarded to Entergy detailed questions asking about case-specific concerns, including the type and amount of transient combustibles in the areas, proximity to other fixed combustibles, postulated fire scenarios, and the location of drains and dikes in the area. (JA 277.) On April 30, 2007, Entergy submitted its responses to the Commission’s request for additional information. (JA 444-60.) On August 16, 2007, Entergy amended its exemption request to ask that Fire Area ETN-4 be rated for only 24 minutes. (JA 461.)
On September 24, 2007, pursuant to the National Environmental Policy Act (“NEPA”), the NRC issued an Environmental Assessment (“EA”) and a finding of no significant impact (“FONSI”) holding that Entergy’s revised exemption would not significantly impact the environment. (JA 488.) According to Plaintiff, this is when the public first became aware of Entergy’s exemption request. (Compl. ¶ 29.) Four days later, on September 28, 2007, the NRC granted Entergy’s application for an exemption. (JA 496.)
On October 4, 2007, the NRC issued an order granting Entergy an exemption from NRC fire protection rule, 10 C.F.R. pt. 50, App. R, III.G.2.A.C. The NRC published the approval in the Federal Register. See Revision to Existing Exemptions, 72 Fed.Reg. 56,798 (Oct. 4, 2007).
On December 3, 2007, Plaintiffs filed a formal objection with the NRC contesting the exemption granted to Entergy. (JA 513.) Petitioners requested that the NRC hold a public hearing on the issue. (Id.) On January 30, 2008, the NRC rejected Plaintiffs’ petition. (JA 909.)
C. The Court of Appeals’ Decision
On March 27, 2008, Plaintiffs filed a petition with the Court of Appeals appealing from the NRC’s rejection of their objection to the exemption granted Entergy.
Brodsky v. U.S. Nuclear Regulatory Comm’n,
On May 5, 2008, the NRC moved to dismiss the petition, arguing that the exemption was properly granted and that exemptions do not require hearings under the Commission’s regulations. Brodsky, 578 at 179. On August 27, 2009, the Court of Appeals dismissed Plaintiffs’ petition on jurisdictional grounds. Id. at 183-84.
*454
The Court of Appeals held that “[t]he plain text of § 2239(a) does not confer appellate jurisdiction over final orders issued in proceedings involving exemptions, irrespective of any hearing requirement.”
Brodsky,
Therefore, the Court of Appeals held that it lacked jurisdiction under the Hobbs Act to review exemptions. Id. at 182. However, because it would only lack jurisdiction if the order challenged was indeed an exemption, the Court went on to decide whether the October 4th NRC Order was an exemption or amendment. Id.
1. The Commission’s Order Is an Exemption, Not an Amendment
The Court of Appeals held that while the label placed upon an order by an agency is not conclusive, the labels deserve deference when they are reasonable.
Id.
at 182. The NRC applied 10 C.F.R. § 50.12 in deciding whether to grant an exemption. The
Brodsky
court held that “[a]n agency’s application of its own regulations is ‘controlling unless plainly erroneous or inconsistent with the regulation[s].’ ”
Brodsky,
In concluding, the Court of Appeals held that because it lacked jurisdiction it expressed no opinion as to, inter alia, whether the NRC’s denial of a hearing was proper or whether the exemption at issue is arbitrary and capricious. Id. at 183-84. The Court held only that Petitioners were challenging an exemption, not an amendment, and exemptions are not directly reviewable by the Court of Appeals. Id. at 184. In a final footnote, the Court of Appeals remarked that “Petitioners are *455 free to seek review in the district court of the NRC’s actions pursuant to the APA.” Id. at 184 n. 6.
II. DISCUSSION
Pursuant to Rule 56, summary judgment is appropriate if the record shows that there is no genuine issue as to any material fact and that the moving party is entitled to judgment as a matter of law.
Celotex Corp. v. Catrett,
Plaintiffs allege twenty-one causes of action pursuant to the AEA, the Administrative Protection Act (“APA”), and NEPA. Plaintiffs’ claims can be grouped into five categories:
(1) The NRC lacks authority to create or issue exemptions to the fire protection program. (Counts 1-4)
(2) The AEA and APA required the NRC to hold public hearings on exemptions. (Counts 5-9)
(3) The NRC was required by NEPA to prepare an Environmental Impact Statement (“EIS”). (Counts 10-11.)
(4) The NRC failed to consider probative evidence or relied on evidence not in the administrative record. (Counts 12-19, 21)
(5)The NRC awarded the exemption too quickly and could not have had adequate time to evaluate the request. (Count 20).
The Commission’s position is that as a matter of law each of Plaintiffs claims fails. The Court addresses each of these charges in turn.
A. The NRC’s Exemption Authority
The AEA established a comprehensive regulatory framework governing the operation of nuclear power plants in the United States.
See Vermont Yankee Nuclear Power Corp. v. Natural Res. Defense Council, Inc.,
The NRC is charged with the “primary responsibility” to ensure that the “generation and transmission of nuclear power does not unreasonably threaten the public welfare.”
Cnty. of Rockland,
Plaintiffs contend that the AEA does not expressly authorize exemptions. (Compl. ¶¶ 52, 56, 62, 69.) Thus, Plaintiffs challenge the validity of 10 C.F.R. § 50.12, which authorizes exemptions. Plaintiffs concede, however, that the NRC has authority to grant, modify and amend licenses to nuclear power facilities and to make rules and regulations to govern their operation. (Compl. ¶ 52.) The Commission argues that as part of that mandate, it has authority to grant exemptions to the rules it promulgates. (Defs.’ Mem. 10.) Under Plaintiffs’ reasoning, the Commission’s regulations are “ironclad” and can only be altered through the formal amendment procedure. (See Pis.’ Mem. Opp. 1.)
Generally, the Commission has broad authority in making decisions regarding nuclear plant safety.
Cnty. of Rockland,
One of the most emotional issues confronting our society today is the adequacy of safety measures at nuclear power facilities.... [T]he debate over nuclear safety persists as public interest groups charge that serious problems remain and operator-utilities seek to assure the public that all reasonable measures have been taken to protect surrounding populations in the event of a major nuclear accident. But it is the United States Nuclear Regulatory Commission ... which must decide the difficult questions concerning nuclear power safety.
709 F.2d at 766 .
Plaintiffs’ arguments are unpersuasive. Pursuant to 10 C.F.R. § 50.12, the NRC may grant exemptions where “the exemptions are authorized by law, will not present an undue risk to public health or safety, and are consistent with the common defense and security” and where “special circumstances” are present.
The regulations set forth six special circumstances.
6
The Commission need only
*457
find that one special circumstance applies in order to grant an exemption.
7
The authority to grant exemptions has been a part of the agency’s regulatory structure for over fifty years.
See Brodsky,
Plaintiffs rely principally on
Alabama Power Co. v. Costle,
[W]e are not concerned here with the “equitable” discretion of agencies to afford case-by-case treatment taking into account circumstances peculiar to individual parties in the application of a general rule to particular cases, or even in appropriate cases to grant dispensation from the rule’s operation. The need for such flexibility in appropriate cases is generally recognized, and enhances the effective operation of the administrative process, though Congress may, of course, restrain the agency by mandating standards from which no variance is permitted.
Id. at 357-58. Clearly, the Alabama Power holding was not intended to hamstring an agency’s ability to make case-specific decisions where necessary for special circumstances.
Moreover, the
Alabama Power
court reviewed an exemption contrary to the express language in a congressional statute. The court described the agency’s action as seeking “vindication of an approach con
*458
trary to the explicit statutory design on the basis of its estimate of its lack of capacity to handle the task delegated to it.”
Id.
at 359-60. This is not the issue before this Court. Here, the Commission promulgated the rules in Appendix R, pursuant to a mandate from Congress to establish fire-safety rules. The NRC did not grant an exemption to Entergy contrary to an express statutory requirement. There is nothing in the record to suggest that the Commission’s creation of fire safety rules was anything but in conformity with its legislative mandate. Rather, the Court of Appeals in
Connecticut Light
affirmed the Appendix R fire safety program as adopted by the Commission.
The argument that the NRC is authorized to promulgate rules but does not have the ability to modify those rules on a case by case determination defies common sense. The NRC’s authority to establish rules and regulations must go hand in hand with the agency’s ability to grant exemptions on a case by ease basis to those very same rules.
B. Section 2239(a) Does Not Require Public Hearings for Exemptions
Only the items listed in § 2239(a)(1)(A) give rise to the right to a public hearing. 8 Plaintiffs assert three reasons for why a public hearing was necessary. (Pis.’ Mem. Opp. 11-12.) None of their reasons falls within the scope of § 2239(a)(1)(A).
First, Plaintiffs assert “that the IP3 ‘exemption,’ because of its scope, permanency, and safety and public health consequences was in fact and effect an amendment to Entergy’s license.” (Pis. Mem. 11.) As discussed above, the Court of Appeals decided this issue. Section 2239(a) does not mention exemptions, and the Court of Appeals, in this case, deferred to the judgment of the Commission that categorized this action as an exemption, not an amendment.
Brodsky,
The Court of Appeals held that “the plain text of § 2239(a) does not confer appellate jurisdiction over final orders issued in proceedings involving exemptions,
irrespective of any heañng requirement.” Id.
at 180 (emphasis added). Plaintiffs focus on this language to argue that the Court of Appeals’ decision not to extend jurisdiction is irrelevant to whether a hearing is required pursuant to § 2239(a). Plaintiffs are correct that “the jurisdictional element and hearing requirement of § 2239(a) are not coextensive,”
id.,
however, only to demonstrate that the Court of Appeals has jurisdiction over “all final orders in licensing proceedings whether or not a hearing before the Commission occurred or could have occurred.”
Id.
(quoting
Florida Power & Light Co. v. Lorion,
*458 In any proceeding under this chapter, for the granting, suspending, revoking, or amending of any license or construction permit, or application to transfer control, and in any proceeding for the issuance or modification of rules and regulations dealing with the activities of licensees, and in any proceeding for the payment of compensation, an award or royalties under sections 2183, 2187, 2236(c) or 2238 of this title, the Commission shall grant a hearing upon the request of any person whose interest may be affected by the proceeding, and shall admit any such person as a party to such proceeding.
*459
In the end, the Court of Appeals adopted the NRC’s distinction of exemptions from amendments in concluding that it did not have jurisdiction, pursuant to § 2239(a).
Brodsky,
Second, Plaintiffs assert that “the AEA requires a public hearing if the NRC takes an action that results in a ‘modification of a rule or regulation.’ ” Plaintiffs argue that by granting the exemption changing the fire insulation requirement at IP3, the NRC modified the rules or regulations. This argument misses the mark also. The Commission could have modified the fire safety regulations themselves but did not do so. Instead, it granted an exemption, based on a case-by-case review, to one particular facility, pursuant to 10 C.F.R. § 50.12. Therefore, the exemption does not trigger § 2239(a)’s mandatory hearing requirements.
Third, Plaintiffs argue that the NRC has a regulatory requirement that “the public be given notice of a proposed ‘significant modification’ to a license and a thirty-day period to comment on the significant modification.” (Pis. Mem. Opp. 11-12.); see 10 C.F.R. § 50.91(a); 10 C.F.R. § 2.104. Plaintiffs assert that the “IPEC ‘exemption’ significantly modifies the actions, responsibilities and obligations of the licensee, and as such is subject to the hearing requirements of 10 C.F.R. 50.91(a).” (Pis. Mem. Opp. 13.) Like § 2239(a), this section only applies to an application for a license amendment and thus is not applicable here for the same reasons. The very language of this section states that it only applies to a “significant modification” to a license.
It is well settled that the “grant of an exemption from a generic requirement does not constitute an amendment to the reactor’s license that would trigger hearing rights.”
Kelley v. Selin,
The exemptions here are unrelated to licensing. Therefore, this Court follows the guidance of the several circuit courts that have deferred to the Commission’s discretion to not grant hearings for exemptions.
C. The APA Does Not Require a Public Hearing
Plaintiffs argue that, pursuant to the APA, 5 U.S.C. § 554, a hearing is required because the “exemption” process used by the NRC was (1) “not in accordance with law,” (2) “in excess of statutory jurisdiction,” insofar as the modification of Appendix R via an “exemption” was ultra vires, and (3) “without observance of procedure required by law” as set forth in Section 189(a) of the AEA (42 U.S.C. 2239). (Pis. Mem. Opp. 15.)
Plaintiffs cite no case law for these propositions. Plaintiffs’ argument under the APA is the same as under the AEA; specifically, the Commission does not have authority to grant exemptions. Section 554 of the APA applies only to “adjudication[s] required by statute to be determined on the record after opportunity for an agency hearing,” 5 U.S.C. § 554(a), and the Court of Appeals has held that § 2239 does not require such a hearing.
See II North 73 West, Inc. v. U.S. D.O.T.,
Additionally, Plaintiffs argue that Entergy’s request for an exemption did not conform with the options provided by the NRC in its Generic Letter 2006-03 responding to non-conforming conditions with respect to Hyme. However, in the Generic Letter under the section entitled “Requested Actions” the NRC states that corrective actions must be implemented in accordance with existing regulations. (JA 215.) Defendants argue, correctly, that those regulations include 10 C.F.R. § 50.12, which authorizes exemptions. Plaintiffs’ claim that the APA mandated a hearing, independent of the AEA requirements, is without merit.
D. An Environmental Impact Statement Was Not Required
On September 24, 2007, pursuant to NEPA, the NRC issued an EA and FONSI holding that Entergy’s requested exemption would not significantly affect the environment. Plaintiffs argue that the Commission was required to issue an EIS, which is more comprehensive than an EA. The Commission’s decision that an EIS was not necessary was not arbitrary, capricious or an abuse of discretion.
The Supreme Court has described the purpose of NEPA as “where an agency action significantly affects the quality of the human environment, the agency must evaluate the ‘environmental impact’ and any unavoidable adverse environmental effects of its proposal.”
Metropolitan Edison Co. v. People Against Nuclear Energy,
*461
NEPA mandates that federal agencies prepare an EIS for “major federal actions significantly affecting the quality of the human environment.”
9
42 U.S.C. § 4332(2)(C);
see Limerick Ecology Action, Inc. v. U.S. Nuclear Regulatory Comm’n,
The Commission followed this procedure.
See Robertson,
The Commission’s finding was reasonable. The EA and FONSI discuss the revision of the existing exemption and refer to the more detailed safety evaluation (JA 474-490) issued along with the approval of the exemption. The EA concludes that “the proposed action will not significantly increase the probability of consequences of accidents.” (JA 492.) It discusses various environmental impacts and finds that the revision to the existing exemptions from 1987 will have no additional environmental impact. Additionally, the EA found that if the Commission, in the alternative, denied the exemption application it would have a similar lack of impact on the environmental analysis. (JA 493.) In plain words, if the Commission ordered that the facility comply with the one-hour requirement it would reach the same result in the EA. The NRC argues that Plaintiffs ignore “the nature of the regulatory action”; revisions to long standing exemptions for two discrete areas of the plant, which have been analyzed compre *462 hensively for fire risks. (Defs.’ Mem. Opp. 13.) The Commission’s decision not to issue a more strict EIS was reasonable and far from an abuse of discretion. 10 This is exactly the type of circumstance where courts should defer to the NRC’s expertise in conducting substantive safety evaluations.
E. Substantive Challenges to the Commission’s Decision
Finally, Plaintiffs challenge the merits of the NRC’s decision. Plaintiffs raise several arguments including, inter alia, that the Commission did not consider relevant and probative evidence, that the administrative record lacked specific documents relied upon by the NRC, and that the exemption must be invalid because the Commission’s review was conducted too quickly. Plaintiffs’ arguments are without merit. The record demonstrates that the NRC’s decision was neither arbitrary nor capricious.
The APA allows courts to set aside agency action that is “arbitrary” or “capricious.” 5 U.S.C. § 706(2)(A).
See F.C.C. v. Fox Television Stations, Inc.,
1. The Commission’s Decision was Neither Arbitrary Nor Capricious
The Commission performed a comprehensive safety evaluation in concluding that Entergy “continues to meet the underlying purpose of 10 C.F.R. Part 50, Appendix R, Subsection II.G.2.” (JA 502.) The Commission described the purpose of Appendix R as a “defense-in-depth” 11 approach intended “to prevent, control, and promptly extinguish fires, and to protect structures, systems, and components necessary for a safe shutdown of the plant.” (Id.) In its analysis, the NRC staff deter *463 mined that “limited ignition sources plus administrative controls and fire detection/suppression features of these areas provided the requisite defense-in-depth for safe shutdown.” The NRC Order approving the exemption concluded:
The underlying purpose of Subsection III.g.2 of 10 CFR Part 50, Appendix R, is to ensure that one of the redundant trains necessary to achieve and maintain hot shutdown conditions remains free of fire damage in the event of a fire. Based on the existing fire barriers, fire detectors, automatic and manual fire suppression equipment, administrative controls, the fire hazard analysis, the Hemyc configuration, and the absence of significant combustible loads and ignition sources, NRC staff judges that application of Subsection II.G.2 of 10 CFR Part 50, Appendix R, for those fire areas is not necessary to achieve the underlying purpose of this regulation.
(Revision to Existing Exemptions, 72 Fed.Reg. 56,798 (Oct. 4, 2007).) Plaintiffs dispute the Commission’s use of a defense-in-depth approach. According to Plaintiffs, the Commission states inaccurately in its papers that Appendix R requires defense-in-depth measures. Rather, Plaintiffs assert that “Appendix R contains specific, ironclad requirements for, among other things, the amount of time that insulation on the cables that control reactor shutdown must survive.” (Pis. Mem. Opp. 1.) However, Plaintiffs ignore the very language of Appendix R. Under “General Requirements,” Appendix R describes the purpose of the rule as defense-in-depth:
The fire protection program shall extend the concept of defense-in-depth to fire protection in fire areas important to safety, with the following objectives:
To prevent fires from starting;
To detect rapidly, control, and extinguish promptly those fires that do occur;
To provide protection for structures, systems, and components important to safety so that a fire that is not promptly extinguished by the fire suppression activities will not prevent the safe shutdown of the plant.
10. C.F.R. Pt. 50, App. R, II.A. Contrary to Plaintiffs’ assertion, the purpose of Appendix R is to satisfy the three objectives of “defense-in-depth” listed above.
As to the first defense-in-depth objective, the Commission evaluated the likelihood and severity of fires in the ETN-4 and PAB-2 Fire Areas. (JA 502-03.) The NRC was satisfied that “administrative controls of hot work and transient combustibles have improved since the previous exemptions.” (JA 506.) Fire Areas ETN-4 and PAB-2 were now labeled “Level 2” combustible control areas, which limited transient combustibles in those areas to “moderate” quantities. (Id.) Additionally, any transient combustibles that may exceed the allowable limit would not be allowed into the fire zones without a prior evaluation by a Fire Protection Engineer and further compensatory measures. (JA 507.) The Commission concluded that potential ignition sources in the fire areas had only a “combined fire severity of less than 10 minutes.” (JA 507.) According to the NRC, the cables were asbestos-jacketed, and the “flame retardant characteristics” of this cable ensured that any fire would not reach significant degrees. (Id.) As such, the Commission found that that the first defense-in-depth objective was achieved. (Id.)
Second, based on the fire detection and suppression systems in the two fire zones, the Commission staff “determined that any postulated fire is expected to be promptly detected by the available automatic fire detection systems in Fire Area ETN-4 (Fire Zone 60A) and Fire Area PAB-2 (Fire Zone 1).” (Id.) The Commission dis *464 cussed the administrative procedures in place and found that the second objective of defense-in-depth was met. Finally, the Commission determined that based on the limited ignition sources, the administrative controls in place, and the fire detection and suppression features granting the exemption “would not impact IP3 post-fire safe-shutdown capability” as required under objective three. (JA 508.)
Further, the Commission evaluated the fire-resistant capacity of the Hemyc fire wrap at IP3. The NRC concluded: “that the licensee has adequately demonstrated a 30-minute rated fire wrap for the [Fire Area PAB-2 configurations]. The [configuration in Fire Area ETN^4] has been adequately demonstrated to provide a 24-minute rated fire wrap.” (JA 504-05.) According to the NRC, the two critical considerations were the existing separation from other fire areas by 3-hour rated fire barriers and automatic and manual fire detection features in the two fire areas. (JA 505.)
As many courts have emphasized, it is not the role of the courts to substitute their judgment for the substantive decisions of the Commission.
See, e.g., Duke Power Co.,
Plaintiffs’ remaining arguments are also without merit. Plaintiffs contend that the Commission mischaracterized the record, either by excluding probative documents or by including documents improperly. Other circuits have held that the Commission, in conducting a performance-based safety review, should not be limited to facts in the record.
See Eddleman,
Moreover, Plaintiffs do not identify which specific documents were not considered (or, alternatively, relied upon unlawfully) that would invalidate the Commission’s decision. The NRC’s final order addressed comprehensively the different factors under 10 C.F.R. 50.12 for granting an exemption. At oral argument, Plaintiffs argued that the exemption order made reference to a “Fire Hazards Analysis” study conducted by Entergy, which was not in the record and therefore as a matter of law, the court should find that the Commission’s decision was contrary to law. The Court disagrees.
In the exemption order, the Commission wrote that “[b]ased upon consideration of the information in the licensee’s Fire Hazards Analysis; administrative controls for transient combustibles and ignition sources; previously-granted exemptions
*465
for this fire zone; and the considerations noted above, the NRC staff concludes that this exemption meets the underlying purpose of the rule.” (JA 510.) The Commission argued that while there is no document titled Fire Hazards analysis in the record, the information and documents comprising the analysis are in the record. The Court limits its review to the documents in the administrative record.
12
See Lemon,
Plaintiffs’ final argument is that the Commission granted Entergy’s exemption too quickly. There is no foundation to this claim, in fact or law. There is nothing suspicious about the amount of time it took the Commission to review the request (the initial request was on July 24, 2006 (JA 234) and the exemption was granted on September 28, 2007-approximately fourteen months later). Also significantly, these were revisions to earlier granted exemptions on an issue that the Commission had reviewed previously.
The APA requires a court to set aside agency action if it appears in the record that such action is “arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law.” Here, there is nothing in the record that demonstrates such. The Commission based its decision “on a consideration of the relevant factors.”
Citizens to Preserve Overton Park v. Volpe,
This is a case where deference to the substantive decision of the Commission, as it relates to nuclear safety, is warranted.
III. CONCLUSION
For the foregoing reasons, Defendant’s motion for summary judgment [dkt. no. 5] *466 is granted in its entirety. The Clerk of the Court shall mark this action closed and all pending motions denied as moot.
SO ORDERED.
Notes
. The facility, located in Westchester County, is known also as the Indian Point 3 nuclear power plant. On June 25, 2010, Entergy was granted status as an Intervenor Defendant.
. Section 50.48(b) sets forth the Commission's fire protection rule. Appendix R to this part "establishes fire protection features ... with respect to certain generic issues for nuclear plants licensed to operate before January 1, 1979.'' 10 C.F.R. § 50.48(b). Therefore, the specific features from which exemptions were granted are located in Appendix R.
. In 1982, Entergy submitted an evaluation of IP3 to the Commission reviewing its compliance with Appendix R. Simultaneously, Entergy requested twenty-six exemptions from the Appendix R requirements. The Commission staff recommended that eight exemptions be granted, sixteen exemptions be denied, and found two exemptions to be unnecessary. (JA 136.) From 1984 through 1987, Entergy supplemented the evaluation of IP3 and requested an additional seven exemptions. (Id.) Therefore, the Commission has a long history of reviewing the Appendix R regulations at IP3 and in most cases has denied requests for exemptions.
. "JA” refers to the "Joint Appendix,” attached to the Declaration of Benjamin H. Torrance. Also attached to the Torrance Declaration is the Certified Index of the Record. The Joint Appendix and Certified Index constitute the record submit to the Court for its review.
. The Court of Appeals noted that it lacked jurisdiction to consider the validity of the regulations themselves. Id. at 182 n. 4. In part, Plaintiffs are asking this Court to rule the Commission’s rules and regulations unlawful.
. Any one of the following "special circumstances" can justify an exemption:
(i) Application of the regulation in the particular circumstances conflicts with other rules or requirements of the Commission; or
(ii) Application of the regulation in the particular circumstances would not serve the underlying purpose of the rule or is not necessaiy to achieve the underlying purpose of the rule; or
(iii)Compliance would result in undue hardship or other costs that are significantly in excess of those contemplated when the regulation was adopted, or that are significantly in excess of those incurred by others similarly situated; or
*457 (iv) The exemption would result in benefit to the public health and safety that compensates for any decrease in safety that may result from the grant of the exemption; or
(v) The exemption would provide only temporary relief from the applicable regulation and the licensee or applicant has made good faith efforts to comply with the regulation; or
(vi) There is present any other material circumstance not considered when the regulation was adopted for which it would be in the public interest to grant an exemption. If such condition is relied on exclusively for satisfying paragraph (a)(2) of this section, the exemption may not be granted until the Executive Director for Operations has consulted with the Commission.
10 CFR § 50.12.
. According to Plaintiffs, if an exemption is permitted, it must be temporary in order to be valid. However, that is only one of the six special circumstances listed in 10 C.F.R. § 50.12. Clearly, the plain language of the rule does not require that all exemptions be temporary.
. Section 189(a) of the AEA, codified at 42 U.S.C. § 2239(a)(1)(A), provides:
. Section 4332(2)(C) requires that federal agencies:
include in every recommendation or report on proposals for legislation and other major Federal actions significantly affecting the quality of the human environment, a detailed statement by the responsible official on—
(i)the environmental impact of the proposed action,
(ii) any adverse environmental effects which cannot be avoided should the proposal be implemented,
(iii) alternatives to the proposed action,
(iv) the relationship between local short-term uses of man’s environment and the maintenance and enhancement of long-term productivity, and
(v) any irreversible and irretrievable commitments of resources which would be involved in the proposed action should it be implemented.”
. To the extent Plaintiffs argue that the Commission, in drafting the EA, should have considered the possibility of a terrorist attack, this should be rejected. The Third Circuit recently held, in a case involving renewal of a license, that the NRC did not need to consider independently a terrorist attack because the effect on the environment would be no worse than that of a severe accident at the plant.
See N.J. Dep’t of Env. Protection v. U.S. Nuclear Regulatory Comm’n,
. Defense-in-depth means:
An approach to designing and operating nuclear facilities that prevents and mitigates accidents that release radiation or hazardous materials. The key is creating multiple independent and redundant layers of defense to compensate for potential human and mechanical failures so that no single layer, no matter how robust, is exclusively relied upon. Defense-in-depth includes the use of access controls, physical barriers, redundant and diverse key safety functions, and emergency response measures.
U.S.N.R.C. Glossary, http://www.nrc.gov/ reading-rm/basicrel/glossary/defense-in-depth. html.
. The 914-page record, comprised of twenty-eight documents from the NRC, includes several studies and memoranda concerning Entergy's and the Commission’s review and analysis. The record contains the exemption applications and analysis from 1984 and 1987 as well. (JA 62, 114, 127.) The July 24, 2006, Entergy submission requesting a revision of existing exemptions (JA 234), includes as Attachment 1 (JA 237) the conclusions of the Entergy engineering evaluation. Also included, among other documents, are the internal memorandum from the NRC examining the test results for industiy-sponsored Hemyc cable (JA 252); memorandum from the chief of the NRC Division of Operating Reactor Licensing requesting supplemental information from Entergy in order to evaluate their request (JA 275); a request to Entergy for additional information (JA 278); a supplemental response answering the Commission’s additional information requests (JA 444, 451); internal memorandum from the NRC Fire Protection Branch enclosing its safety evaluation report (JA 472); the EA and FONSI issued by the NRC (JA 487); and the September 28, 2007 Exemption (JA 495).