This was a suit instituted to enforce the lien of a special tax bill issued by the city of St. Joseph under the powers conferred by the statutes upon cities of the second class, of which it was one. The property-owners on, Francis street, among whom was defendant, petitioned the city council to have a part of said street ■ paved with brick. At the time the *438petition was signed and presented, that portion of the street sought to be paved had a street railway track laid down thereon. The city had, by an ordinance, passed in conformity to its charter, section 1270, Revised Statutes, previously granted the street railway company owning said track permission to lay it down in the street. The ordinance required the said street railway company to pave “the space between the rails and for eighteen inches outside of the rails * * * with the same kind of paving with which the streets are now or may hereafter be paved, and by them kept in repair.” The street railway company, by consent of the city, had removed its track from the street before the improvement thereof was begun.

Neither in the petition, ordinance, specification^ r r contract for the improving of said street was there any reference made to said street railway track. The plaintiff had judgment, and the defendant appealed.

I. The defendant’s first ground of complaint is that it was the duty of the street railway , company to pay for paving the space between its rails, and for eighteen inches on the outside thereof, which it did not do. He insists that the part of said street improvement which was chargeable to said street railway company has been erroneously charged against his property and that of the other abutting owners. We do not think this contention can be sustained. By reference to the statute, sections 1404, 1405, 1406, which is the charter of the city, it will be seen that it is there provided that “the costs of all work on streets, avenues and highways or any part thereof shall be charged as a special tax on lands on both sides of and adjoining the street, avenue or highway or part thereof. ’ ’ There is no statute which authorizes or requires a special tax bill to be made out against the property of a street railway company for any part of the cost of an improvement made in a street *439over -which it has laid its track. It is not disputed hut that the street railway company not only removed its track from the street, but that it had the lawful right to do so, before the work of improving the street begun. The whole theory of street improvement provided by the statute is that the property benefited thereby must be charged with the cost thereof. It may be, and doubtless is, true, that if the street railway company had continued to occupy a part of the street with its track that it would have been liable for such improvement to the extent of the cost of paving the space between its rails and for eighteen inches outside thereof. As to whom liable, or how such liability should be enforced in such case, we need express no opinion as the question does not arise in the case. It nowhere appears that the street railway company was bound to perpetually maintain its track on said street. Its duty to pave was coextensive with the existence of its street franchise. If its license to occupy the street with its railway track was revoked by the city, the corresponding duty to pave the space required by the ordinance necessarily terminated. How could the railway company or the contractor pave the space between the rails and for eighteen inches on the outside thereof, if there was no such railway track in the street? How could it be benefited in such case by the street improvement? What principle can be invoked to make it liable for any part of that improvement under such circumstances? It must be presumed that the defendant had notice of the provisions of the ordinance granting the street railway company the right to use the street. He must be held to have known when he petitioned the common council to order the improvement of the street that the duty of the railway company to pave did not extend beyond the time when it should cease to maintain its track on the street under the license granted it by the city. The *440defendant petitioned the city to improve the street when he knew that the duty of the street railway company to pave the space required by the ordinance granting it the right to occupy the street with its track was contingent in its nature, and not a continuing one. We cannot discover that the defendant has any just grounds for complaint on this account.

II. The defendant further contends that the trial court should have directed a verdict for the defendant for the reason that the city in making the improvement of the street failed to follow the mode and to use the material prescribed by the general ordinances of the city, in that there was no plan and specifications of the proposed improvement on file in the office of the city engineer when the special ordinance was passed requiring such improvement .to be made or at the time the notice was given that bids therefor would be received by the engineer. The evidence conduces to show that, previous to the passage of the ordinance providing for the improvement of Francis street, there was on file in the engineer’s office specifications for all street-paving with brick. 'There was also a plan showing the heights of the curbing along the street, a plan showing the elevation and lines of the curbing along the street, and the condition in which it existed before the work was done on it. It showed the height of the curbing and the width of the street and curbing. There was some evidence tending to show that this plan, with the specifications, was in the engineer’s office before the special ordinance was passed or the notice for the bids for doing the work given. This, it seems to us,' sufficiently met the requirements of the ordinance for all practical purposes. The specifications called for artificial stone curbing. Greneral ordinance number 158 required that the material for all street curbing should consist of the best quality of lime or sand stone. *441The notice that bids would be received for the work called for natural stone. The bids were accordingly made.

The objection urged is, that the specifications called for artificial stone for the curbing, while the general ■ordinance, notice and bids called for natural stone. The bidders, who doubtless knew the requirements of the general ordinance, made their bids as if natural stone had been called for in the specifications. We are inclined to think that the plan and specifications were in substantial compliance with the ordinance in every essential particular, except as to the natural stone. We should deem this departure fatal, were it not that the notice and bids were for the kind of stone required by •the ordinance, and, besides this, it does not seem to have misled bidders or to have operated prejudicially to .'the interests of the abutting property-owners in any way. It is to be observed, too, that the infirmity in the case does not arise from a want of power, but from the mode of exercising it. Now, defendant, after the bids had been received, for natural curbing, petitioned the common council to substitute artificial stone in the place of natural stone, which was accordingly done. The contract was let to Gibson, who was the lQwest bidder for the work. The council fixed the price of the artificial curbing, so that there was. no competition among the bidders as to that item; but as this was brought about by the action of defendant and the other property-owners themselves, they cannot complain of the matter. The defendant not only requested the city council to change the curbing from natural to artificial stone, but he also directed the contractors to remove the old curbing in front of his property, and put in new curbing, which he knew was by the contract to be of artificial stone. He saw the contractor put in the artificial curbing in front of his property, and made *442no objection.whatever thereto. It, therefore, appearing that the defendant, with others, having procured, the substitution of the contract made for the one contemplated by the ordinance, he is by every principle of right estopped to deny the validity of the assessment. And, even if he had not procured the change in the contract, he would be estopped on the further ground that he had actual knowledge of the change, and acquiesced in the work done under it. These views are supported by the rulings made in Galbreath v. Newton, 30 Mo. App. 380, and in Sheehan v. Owen, 82 Mo. 464.

II. There is no dispute but that there was a substantial compliance with the contract for doing the work. The mere fact that the contractor caused the work to be performed by another was, we think, of no consequence. It is not pretended that there was a formal assignment of the contract. Gibson entered into bond for the faithful performance of the work. When the work was performed and accepted by the city, the tax bills therefor were issued to him. No one was prejudiced by his action in causing the work to .be done by another, Besides this, it may be well questioned whether the property-owners would be permitted to-defeat the tax bills where there had been substantial compliance with the contract, and the work accepted by the city, even if there had been an assignment. We do not think the court erred in its action in refusing to tell the jury, if they found there had been an assignment, of the contract, there could be no recovery.

The case was fairly tried, and, discovering no error-prejudicial to the plaintiff on the merits, we must, affirm the judgment.

All concur.