186 Iowa 1147 | Iowa | 1919
.Much is said in the pleadings that is not necessary to an understanding of the issues in this case. Briefly stated, it is conceded, or shown without controversy, that, in the year 1907, a drainage district known as “No. 29” was established in Pocahontas County, and the district was improved by the construction of a drainage system composed of a certain main, with other laterals or branches. While some of these drains were of the closed or tile pattern, a large proportion thereof was open. In the year 1910, the engineer in charge of the district reported to the board of supervisors that a certain portion of the open main ditch, and one or more of the branches, had become filled with silt or sediment, to an extent making it necessary or proper to clean the obstructed channels. He estimated the- necessary excavation at 5,500 yards. Nothing seems to have been done with reference to this report during that year, or until March, 1911, when the engineer brought up the subject anew, but this time recommending a more extensive cleaning and repairing of the open ditches in the district, and estimating the entire excavation at about 4,500 cubic yards. Acting on this report and approving it, the board voted to employ >S. F. Hiatt to do the work, being approximately 7,317 yards, at 30 cents, in the upper part of the district, 36,104 yards, at 28 cents, in the lower part, and
The trial court, after hearing the evidence, entered a decree adjudging the equities to be with defendants; that the board of supervisors had complied with the law in letting the contract to Hiatt; and that Hiatt had performed his l>art of the agreement, and was entitled to a compliance with such contract on the part of the board of supervisors and the county auditor.
To ascertain the nature of the work contemplated, we turn to the written contract-entered into with Hiatt, and find it there recited that he agreed “to deepen, clean, re
The engineer’s report and recommendation, upon which the board acted in letting the contract, do not appear to be embodied in the record; and, the engineer making it being since deceased, we do not have the advantage of -his testimony; but it may be presumed that the contract as made with Hiatt is in substantial accord with such recommendation. The work was done under the supervision of the county’s engineer; and the testimony tends to show that, in so doing, the contractor not only took out the sediment with which the ditches had, to a greater or less extent, become filled or obstructed, but, under the direction of the engineer, or in pursuance of the plans furnished by him, the contractor also, in certain places, increased the depth of the excavation below its original grade, and in other places sought to insure greater permanency of the banks of the ditch by increasing their slope; and to that extent increased the original width of the channel. There is also evidence of some original excavation at the outlet.
It further appears that the contractor extended an ex-
The Avitnesses generally agree that the ditches had become filled and obstructed to a degree rendering it. necessary, or at least appropriate, that they should be cleaned out and repaired, if they were to be of real benefit to the lands of the district; and it is also reasonably certain that, when this work was completed, the ditches were, in part at least, somewhat deeper and wider than they Avere as originally constructed. No witness undertakes to say that the work done Avas uncalled for, or did not constitute a substantial betterment of the drainage system; but there is some evidence to the effect that the compensation to the contractor, as fixed in the agreement, was in excess of its fair value. The charge in the plaintiff’s petition, and repeated in argument, that the work contracted for and. done included a lengthening or extension of the ditch or ditches beyond their original dimensions, is not justified by the record; but, as Ave have said, it is to be conceded that the channels Avere not only reopened, cleaned, and emptied of silt and obstructions, but were, to some extent, materially deepened.
Such being, in part, the nature of the work contracted for. and done, the material, legal inquiry is whether, under the provisions of the statute, the board was authorized to undertake it without notice to the property, owners, or to let the contract except upon competitive bidding.
If we will bear in mind that this work here done was in a drainage district, the organization of which had been perfected for several years, and that the drainage improvements contemplated in such organization had been fully completed long before the extension of this contract to re
The first of these sections, 1989-all, prescribes the procedure, to be followed when, after the establishment of the district, “and before the completion of the drainage improvements therein,” it becomes apparent that a levee or drain should be enlarged, deepened, or otherwise changed, and provides that- the board may authorize such change by resolution, subject to the provision that, if such change operates to increase the burden upon any property, notice of the proposed alteration shall be given the owner or owners so affected, and opportunity afforded them to present their claims for damages.
But, by the other section, 1989-a21, provision is made for the maintenance and care of the drainage system after the “district shall have been established and the improvement constructed” For that purpose, it is there provided that the improvement “shall at all times be under the control and supervision of the board of supervisors and it shall be the duty of the board to keep the same in repair and for that purpose they may cause the same to be enlarged, reopened, deepened, toidened, straightened or lengthened for a better outlet.” The cost of such repairs and changes is to be paid from the drainage fund of the district or by assessing it upon the lands in the same .proportion that the-cost of the original construction was assessed, except where additional right of way is taken; and in such case, the board must proceed as the statute provides for establishing an original improvement. '
In the nature of things, and especially with open ditches having but slight natural slopes or grades, the duty should rest upon some responsible officer or board to see that they are kept open and in repair, and if they do not work efficiently, to 'cause the removal of the difficulty, if practicable.
This responsibility, Section 1989-a2¡l places upon the board of supervisors. The duty is one which is continuous, calling for supervision from day to day and month to month, or, in the language of the statute, “at all times.” The work to be done may involve considerable expense, or it may be a succession of petty repairs, each of which is comparatively inexpensive. To require that in each case the board must advertise the job and seek the lowest bidder would be to hamper and prevent its efficient action, without any corresponding benefit to the public. It is not at all strange that a drainage system, once completed and put to practical use, should develo]), here and there, a defect ; and if such defect can be remedied or the efficiency of the system be increased by lowering the bottom of the channel at some point, or by widening the cut in another place, the right of the board to which the duty of care and maintenance is committed, to do what ought to be done to that end, ought not to be unreasonably restricted.
Appellants place chief reliance upon the decision by the court in Lade v. Board of Supervisors, 183 Iowa 1026; and in candor we must say that, if we are to construe some of the language there employed according to its literal terms, as a statement of the law as it now exists, it is out of harmony with the views hereinbefore expressed. For example, the opinion in the cited case says that:
“While it is true the board of supervisors has authority to have an existing ditch widened and deepened and make the assessment for the costs thereof, this may be done only if notice be given; and none was given. See Code Supplement, 1907, Section 1989-all, as amended by Section 10, Chapter 118, Acts of the Thirty-third Hen eral Assembly, and Section 4, Chapter 87, Acts of the Thirty-fourth General Assembly.”
Nothing here said in any manner detracts from the right of the owner of property within the drainage district to object to an assessment for .a new and independent drainage improvement which is sought to be imposed under the guise of a mere work of repair, such as is authorized by Section 1989-a21. That subject we have treated in the case of Chicago & N. W. R. Co. v. Board of Supervisors, 184
The conclusions we have announced appear to ms to be inevitable, unless we are to judicially neutralize the plainly expressed will of the legislature. The decision of the trial court is, therefore, — Affirmed.