198 Conn. 660 | Conn. | 1986
The principal issue on this appeal is whether the defendants, the city of Norwalk (hereinafter Norwalk), and William R. Guarnieri, the former chief building inspector for Norwalk, fraudulently concealed the existence of a cause of action so as to toll the running of a statute of limitations. The plaintiffs, owners and former owners of houses in the Bound Brook Estates subdivision in Norwalk, commenced a suit against the defendants
The underlying facts are not in dispute. In 1965 and 1966, Bound Brook Estates, Inc. (hereinafter Bound Brook), received the approval of the city of Norwalk’s planning commission and its common council to build a residential subdivision of 102 homes in Norwalk. Part of the land to be developed was a swamp composed of “soft, wet, marshy” soils. Bound Brook hired Harry E. Bryan, a well known professional engineer and surveyor of excellent reputation in the area, to plan the subdivision. Because of the soil conditions, Bryan determined that many of the houses would have to be built on pilings.
Subsequently, Raymond Wennik, president of Bound Brook, engineer Bryan, the defendant Guarnieri, and a deputy building inspector met to discuss the pending construction. At the time, Guarnieri had been chief building inspector of Norwalk for approximately eight
Following this meeting, Guarnieri issued building permits for the project, and construction began, with untreated wood pilings used to support many houses. In accordance with his regular practice, Guarnieri opened a separate file in the building department office for each house to be constructed. When completed, each file contained the building permit, with a notation on its face that the house had a wood pile foundation; the certificate of occupancy signed by Guarnieri, certifying substantial compliance with the building and zoning regulations of Norwalk; the inspection field sheet, recording periodic inspections of the house during the construction process; a plot plan; and a letter signed and sealed by engineer Bryan,
Shortly after construction had been completed, several houses in the Bound Brook subdivision developed serious settlement problems, necessitating the repiling of three of them by Bound Brook. Bound Brook neither applied for nor obtained building permits for this work. During the next few years, settlement problems of varying degrees developed in some additional houses, culminating in the collapse in 1976 of the ground floor of one house.
In 1977, Norwalk commissioned an engineering study of all the houses in the subdivision to determine the cause and extent of the problem and to attempt to find solutions. The study concluded that the wood pile foundations had been improperly designed, and that the use of untreated wood pilings had been inappropriate because of the fluctuating water table in the area. Following the release of this report, the plaintiffs filed the instant action.
On appeal from the judgment against them, Norwalk and Guarnieri both claim that the trial court erred in failing to direct verdicts in their favor, or to render judgment notwithstanding the verdicts, because the evidence produced at trial was insufficient to establish that they had fraudulently concealed from the plaintiffs the existence of a cause of action. Without proof of fraudulent concealment, the plaintiffs’ cause of action was
To establish that the defendants had fraudulently concealed the existence of their cause of action and so had tolled the statute of limitations, the plaintiffs had the burden of proving that the defendants were aware of the facts necessary to establish this cause of action; Puro v. Henry, 188 Conn. 301, 311, 449 A.2d 176 (1982); and that they had intentionally concealed those facts from the plaintiffs.
The plaintiffs claim that they sustained this burden by establishing: (1) that Guarnieri, and through him Norwalk, issued the building permits and certificates of occupancy without first obtaining test results and affidavits required by the Building Code; (2) that a deputy building inspector signed misleading field inspection reports and filed them in the building department office; (3) that Guarnieri permitted the repiling of several houses without requiring building permits; and (4) that both Guarnieri and Norwalk later failed to investigate or to warn the plaintiffs or to revoke the certificates of occupancy when they became aware that settlement problems had developed in a number of houses. The defendants, on the other hand, claim that, even if these allegations were true, they do not establish that the defendants intended to conceal the cause of action from the plaintiffs. Since intent to conceal is an essential element of fraudulent concealment, they maintain that the plaintiffs have not sustained their burden of proof, and that the trial court erred in denying their motions for directed verdicts and for judgment notwithstanding the jury’s verdicts.
Contrary to the plaintiffs’ claim, the evidence that Guarnieri issued building permits and certificates of occupancy without first obtaining affidavits and test data concerning the piling foundations does not prove an intent to conceal the facts underlying the present cause of action. The evidence presented at trial established that Guarnieri’s failure to require the test data was prompted by his reliance on the representations of a professional engineer that the piling foundations met the code specifications. Such reliance on outside experts is specifically authorized by the code, especially in situations such as the instant one in which the building inspector lacks the technical expertise to handle a particular project. See Connecticut Basic Building Code
In like manner, evidence that a deputy building inspector incorrectly completed field inspection reports falls to prove an intent to conceal the cause of action. There was no evidence whatsoever that the deputy was aware of any deficiencies in the construction of the piling foundations at the time he signed the reports. On the contrary, the evidence established that he relied on the engineer’s representations that the construction satisfied code specifications when he made his reports. The plaintiffs conceded in oral argument before this court that there was no evidence that the defendant Guarnieri knew that the inspection reports contained misleading statements. Without such knowledge, he could hardly have intended to conceal the rights the plaintiffs now claim to have. For similar reasons, even if the deputy’s actions could be deemed attributable to Norwalk, a question we do not decide, the deputy’s possible misconduct does not establish an intent to conceal on the part of Norwalk.
Similarly, the evidence that Guarnieri failed to require building permits for the repiling of several
Finally, the plaintiffs failed to establish that Guarnieri’s subsequent failure to warn the plaintiffs about settlement problems or to revoke certificates of occupancy after problems had developed was motivated by an intent to conceal from the plaintiffs the existence of a cause of action in order to delay their filing suit.
In short, after reviewing all of the evidence presented, we find as a matter of law that the plaintiffs did not sustain their burden of proof, and that the jury could not reasonably and legally have concluded that the defendants had fraudulently concealed from the plaintiffs the existence of their cause of action. Consequently, the plaintiffs’ action was barred by the statute of limitations, and the trial court erred in failing either to direct verdicts in favor of the defendants or to render judgment for the defendants notwithstanding the verdicts.
There is error, the judgment is set aside and the case is remanded to the trial court with instruction to render judgment in favor of the defendants Guamieri and Norwalk.
In this opinion the other judges concurred.
The plaintiffs are owners or former owners of fifty-nine houses in the subdivision. In this action, they joined as defendants Bound Brook Estates, Inc., the development company; Raymond Wennik, the president of Bound Brook Estates; Harry E. Bryan, the design engineer; Louis J. Gardella, Inc., the pile driver; the city of Norwalk; and William R. Guarnieri, the Norwalk building inspector. Bryan died prior to trial and his estate defaulted in this action.
General Statutes § 52-595 provides: “fraudulent concealment of cause OF action. If any person, liable to an action by another, fraudulently conceals from him the existence of the cause of such action, such cause of action shall be deemed to accrue against such person so liable therefor at the time when the person entitled to sue thereon first discovers its existence.”
Verdicts were also rendered against all but one of the other defendants. Bound Brook Estates, Inc., and Raymond Wennik were found liable by the jury and subsequently reached an agreement with the plaintiffs,
The plaintiffs have not challenged the jury’s finding that the action was commenced more than three years from the acts and omissions in question and so would be barred by the statute of limitations absent fraudulent concealment by the defendants. In oral argument before this court, counsel for the plaintiffs conceded that the suit would be barred by the statute of limitations if fraudulent concealment were not established.
The city of Norwalk adopted the state building code in 1961, and this code was in effect throughout the period of construction of the subdivision.
Two of the plaintiffs’ expert witnesses testified that only a professional engineer or architect was capable of designing a piling system.
The text of the letter of certification is as follows: “In accordance with Building Permit Applications filed in the Office of the Building Inspector, we certify to the following: The piling and the reinforced concrete foundation for house on lot_are in accordance with the plans filed with the
This letter was signed and sealed by Harry E. Bryan, registered professional engineer.
General Statutes § 52-584 provides in relevant part: “limitation of action for injury to person or property. No action to recover damages for injury to the person, or to real or personal property, caused by negligence, or by reckless or wanton misconduct . . . shall be brought but within two years from the date when the injury is first sustained or discovered or in the exercise of reasonable care should have been discovered, and except that no such action may be brought more than three years from the date of the act or omission complained of . . . .”
General Statutes § 52-577 provides: “action founded upon a tort. No action founded upon a tort shall be brought but within three years from the date of the act or omission complained of.”
The plaintiffs, pursuant to Practice Book § 3012 (a), challenge the trial court’s instruction that reliance is a necessary element of fraudulent concealment. Because of our holding that the plaintiffs failed to prove intent to conceal, we do not address this claim.
We do not decide whether affirmative acts of concealment are always necessary to satisfy General Statutes § 52-595, as the trial court instructed the jury, or whether a failure to act would be sufficient. See comment, “The Application of the Doctrine of Fraudulent Concealment to Modern Federal Trade Conspiracy Cases,” 14 Conn. L. Rev. 115 (1981).
It was established that the building code requires permits for this type of repiling, and that Bound Brook never applied for them. It is unclear from the evidence whether Guarnieri learned of the repiling before it had begun, or after it was already underway.
In view of our finding that this evidence does not establish an intent to conceal, we need not decide whether Guarnieri had a duty to investigate or to warn, or whether an intentional failure to act in such circumstances would be sufficient to establish fraudulent concealment.
The plaintiffs also claim that Norwalk is liable because other members of the building department knew of problems in the subdivision and yet did nothing to correct them. We find no clear, -unequivocal evidence that anyone in the building department was informed of continuing problems in the subdivision after the repiling of several of the houses from 1969 to 1971. It is not necessary for us to decide whether, even if they were aware of the problems, Norwalk had a duty to investigate or to warn because we find no evidence whatsoever that any alleged inaction was motivated by an intent to conceal from the plaintiffs the existence of the cause of action.
Instead, the only evidence on the issue indicated that, when Norwalk became aware of the seriousness of the problem in 1976, it held public hearings, authorized an engineering study which led to the filing of the instant action, and cooperated fully with the plaintiffs in their efforts to find solutions.