557 F.2d 845 | D.C. Cir. | 1977
Opinion for the Court filed by Circuit Judge WILKEY.
This proceeding consolidates two petitions for review of respondent’s orders
I. PROCEDURAL BACKGROUND
On 27 August 1975 petitioner filed its S-4 rate schedule for a rate increase conforming to the regulations established by the FPC in 1973, Order No. 487,
By letter dated 24 September 1975 the respondent PPC notified petitioner that its S-4 rate filing was deficient because the Period I data provided was out-of-date, and advised that data should be submitted for a period ending no earlier than four months, prior to the filing date. On 11 November 1975 the four-month period was changed by the PPC to no more than seven months prior to the new tender of filing. Then on 14 November 1975 the FPC issued an order denying rehearing to petitioner and reiterating that Period I data which is eight months old when filed is “too stale to be the most recently available as required by Section 35.13(b)(4)(iii). . . .”
In defense of its actions re petitioner’s filings the FPC asserts that since issuance of an order on 10 September 1975 in Interstate Power Co.,
The above filing and rejection became the subject of appeal No. 75-2123 in this court. No. 76-1392 arose out of petitioner’s revised S-4 rate filing.
On 23 January 1976 petitioner filed a revised S-4 rate schedule containing Period I data which were less than four months old when filed, as petitioner had been specifically advised to do, requested an effective date of thirty days after submission, and further requested that if a suspension period was to be imposed, it be limited to four days so that it would end on 27 February 1976, which is the date on which the original rejected rate filing would have become effective if the FPC had accepted and suspended it for the maximum allowable period of five months.
The practical question ultimately to be answered in dollars and cents is thus what rate petitioner is entitled to charge its customers for the period 27 February to 24 July 1976.
II. DISCUSSION
The regulation promulgated by Order No. 487 in 1973 responded to a need by the Federal Power Commission for more current cost-of-service data in ratemaking proceedings in a period when inflationary forces were causing an upward spiraling of fuel and other costs. Order No. 487 contained the following:
Upon further review of the make-up of Period II, we conclude that that period should be made more flexible by designating it as any twelve consecutive month period beginning after Period I but no later than the date on which the new rates become effective. This change will permit companies to file costs projected on a calendar year basis if they so desire.9
The FPC concedes that utility companies interpreted Order No. 487 to allow Period I cost-of-service data to be filed on a calendar
On 10 September 1975 in Interstate Power Co., supra, respondent for the first time rejected calendar year data for Period I as being stale. Fourteen days later petitioner’s S-4 rate filing was rejected and subsequently the filings of other utility companies were accorded the same treatment.
On 3 September 1975 the Commission issued a Notice of Proposed Rulemaking
In its present form, the provision requiring a cost of service statement for twelve months of actual experience does not specify how current the actual data must be. Our experience indicates that the modifying phrase, “for the most recent twelve consecutive months for which actual data are available,” is ambiguous and has given rise to varying constructions.
Recognition was made of the fact that companies which used a calendar year basis of bookkeeping had filed cost-of-service data on a calendar year basis and that this has resulted in less recent data than if the company had utilized a split-test-year cost of service. The notice further stated, “We believe the proposed change should develop a standard of uniformity in the filing requirements . . . and more accurately project future conditions.” This notice of rulemaking was, like the order in Interstate Power Go., supra, subsequent to petitioner’s rate filing but prior to the FPC rejection of those rates.
Order No. 545, issued 20 January 1976,
Aside from the regulations’ admitted lack of specificity, it is readily apparent that after the 1973 amendment calendar year cost-of-service data for Period I had been customarily received by the FPC in relation to rate increase filings. By 3 September 1975 the FPC realized stale data was frustrating the purpose of having the data filed, and so launched upon a Proposed Rulemaking proceeding to correct its' own ineffective regulations.
So we come to the legal issue originally posed, which somewhat restated is, whether the Commission was acting within its authority in rejecting a rate filing already pending on 3 September 1975, which had been filed pursuant to then effective regulations. We think not.
A similar situation was presented in Golden Holiday Tours v. Civil Aeronautic Board,
Petitioner’s S-4 rate increase filing must be viewed in the posture of respondent’s regulations on 27 August 1975. These regulations permitted cost-of-service data of the most recent calendar year for Period I. The applicable law is cogently stated in Greater Boston Television Corporation v.
The FPC acted arbitrarily and abused its discretion in applying a standard contrary to its existing regulations. Although an administrative agency is not bound to rigid adherence to its precedents, it is equally essential that when it decides to reverse its course, it must give notice that the standard is being changed, Columbia Broadcasting System, Inc. v. Federal Communications Commission,
In applying the appropriate remedy on the authority of Indiana & Michigan Electric Company v. Federal Power Commission,
CONCLUSION
The orders here in issue are vacated and the case remanded for action consistent with this opinion.
So Ordered.
. The orders under review in No. 75-2123 are dated 24 September 1975 and 14 November 1975; in No. 76-1392 they are dated 20 February 1976 and 12 April 1976.
. The S-4 rate is a wholesale electric power rate, the rate applicable to intervenors.
. Unfortunately, this opinion is replete with recitation of dates, order numbers, and calculations of periods of time. It must be realized that the argument over these rate filings revolves around precisely these matters.
. 50 F.P.C. 125 (1973), rehearing denied, 50 F.P.C. 736 (1973), 18 C.F.R. § 35.13(b)(4)(iii).
. Ibid.
. Ibid.
. Docket No. ER-76-70.
. 16 U.S.C. § 824d(e).
. 50 F.P.C. 125 at 128 (emphasis added).
.Montaup Electric Company,-F.P.C.-, 3 Nov. 1975, Docket No. ER76-46; Consumers Power Company,-F.P.C.-, 29 Oct. 1975, Docket ER76-45; Western Power Division, Central Telephone and Utilities Corporation, -F.P.C.-, 5 Nov. 1975, Docket No. ER7692; Toledo Edison Company,-F.P.C.-, 31 Dec. 1975, Docket No. ER76-132.
. Docket RM76-6, 40 Fed.Reg. 42029.
. - F.P.C. -.
. 174 U.S.App.D.C. 292, 531 F.2d 624 (1976).
. 143 U.S.App.D.C. 383, 394, 444 F.2d 841, 852 (1970), cert. denied, 403 U.S. 923, 91 S.Ct. 2229, 29 L.Ed.2d 701.
. 147 U.S.App.D.C. 175, 183, 454 F.2d 1018, 1026 (1971).
. 163 U.S.App.D.C. 334, 341-46, 502 F.2d 336, 343-48 (1974) (Opinion on Rehearing).