Bonquois v. Monteleone

47 La. Ann. 814 | La. | 1895

The opinion of the court was delivered by

McEnery, J.

The plaintiff sued the defendant to recover the sum of two thousand seven hundred and sixty-eight dollars and eighty cents damages for injury to the front and side walls of his building No. 85 Customhouse street, which amount also includes loss of rents, all caused by defendant’s putting up a five-story building adjoining the building of plaintiff.

*818In the first petition filed, four hundred and eleven dollars was demanded; twenty-five dollars damage to interior wall, and to roof; thirty-six dollars for loss of rent, and the balance for injury to exterior front wall.

To this demand, a general denial was pleaded.

Construing the cause of action as continuous by the injury done plaintiff’s building by the unsettled condition of the building of defendant, which it was alleged was continually sinking, several supplemental petitions were filed, the first claiming an additional damage of nine hundred and five dollars, making six hundred and thirty-three dollars damage to the side wall, and two hundred and twenty-two dollars for additional rent by loss of tenants, and one hundred and eighty-six dollars for loss of rent to be sustained on account of loss-of tenants during the time required to repair plaintiff's building. The second demand claims the additional sum of two hundred and • eighty-five dollars for more rent for vacant third story, from April, 1893, to March, 1894. This last demand is based on the allegation that the building of defendant continues to settle, preventing plaintiff from making anything but temporary repairs, as plaintiff had been informed by the architect that no permanent repairs could be made until defendant’s building had permanently settled, and that the plaintiff, in consequence of these facts, could not guarantee his tenants that they would not be disturbed during the repairing of the building. An additional sum of one hundred and five dollars and eighty cents is claimed from the defendant on account of the plaintiff having paid him this amount in error for carrying up two chimneys of his building above defendant’s five-story wall.

These demands, were put at issue, defendant alleging that the wall claimed as a party wall had been condemned by the city of New Oileans, and that it was plaintiff’s fault to have permitted it to re-' main standing, and to use the same in violation of the city ordinance.' An exception of no cause of action was filed to the supplemental petitions, and the prescription of one year was pleaded to plaintiff’s several demands.

On the 25th April, 1894, plaintiff filed a third supplemental petition, alleging the sinking of the walls of his building since January 31, 1894, caused by the additional sinking of plaintiff’s building. This demand is for one thousand one hundred and sixty dollars and sixty-seven cents, and is based on the allegation that the continuous *819sinking of plaintiff’s building since the filing of the last1 petition necessitates radical repairs and reconstructions of plaintiff’s building to place it in a condition in which it existed prior to the year 1892, before it was damaged by plaintiff’s building. To this petition the same defences are filed as to the other demands.

Below there was judgment for the plaintiff for the sum of one thousand and fifty-eight dollars, with interest. From this judgment the defendant appealed.

In the record there is evidence that after a fire, which resulted in the defendant being compelled to erect the building which it is claimed injured plaintiff’s building, under the ordinances of the Oity Council, plaintiff’s entire building was condemned by the report of an inspector. But there was no notice given to the plaintiff of this condemnation, and the City Council took no action on the inspector’s report. This, then, was a matter between the city authorities and the plaintiff. Not having been forbidden to repair his building, he took steps to have it repaired, and the testimony of the painter, carpenter, tinners and plasterer who did the repairs is conclusive that the building of plaintiff was in good condition prior to the erection of defendant’s five-story building. This testimony is also corroborated by that of the tenants of the building, who vacated the same because of damage to it after the erection of the five-story building.

There is a considerable amount of expert testimony which, for the plaintiff, is conclusive as to the soundness, solidity and perfection of his building; and that for the defendant is equally as positive that his building has not settled, and that it has caused no damage to defendant’s building, which has been partially wrecked by its inherent defects caused by old age and faulty construction in the foundation.

Disregarding this testimony of the experts and looking at the facts, we find from the evidence of mechanics who repaired plaintiff’s building that it was in good repair when defendant erected his building; by the testimony of tenants that it was in good condition when they occupied it until compelled to vacate it after the erection of defendant’s building for the reason that it was so damaged as to be no longer, in the parts occupied, habitable. We find in the testimony of defendant’s witnesses that the offset or projecting bricks from the old foundation were removed and replaced by better work; that defendant’s wall was built on his own land, but on this offset, *820close to or against plaintiff’s wall, and then fastened to it by a course of brickwork, called a water table or shed, which was worked into defendant’s wall and then fastened to the wall of plaintiff, projecting over it about one inch.

There is no evidence that plaintiff’s wall sunk before the building of defendant’s wall. There is evidence of the fact that plaintiff’s building was injured after the building of defendant was erected, and it was evidently caused by some disturbance in defendant’s building, or by the sinking of plaintiff’s wall in consequence of the disturbance of its foundation. Although not perceptible to the naked eye, and it escaped the scientific scrutiny of the experts, yet we think that defendant’s building settled, and by both causes, the weakening of the foundation by disturbing it, and the gradual settling of defendant’s wall, fastened to that of plaintiff, the latter’s building was injured. A part of defendant’s wall rested on the reconstructed set-off, and, although it went up only against or alongside of the wall of plaintiff, which joined by the “ water table,” the weight of the five-story building rested partly on this portion of the foundation, upon which plaintiff’s wall in part rested; this we think was sufficient to cause some disturbance in plaintiff’s building.

The wall was one held in common, and it is very manifest that the defendant, in building the five-story structure, did not abandon the wall and erect one exclusively on his own property, free from plaintiff’s wall.

Having made use of a part of the original foundation, and having attached his wall to that of plaintiff, the defendant was compelled to have provided against any injury to plaintiff’s building. He neglected to strengthen the wall in common to support the additional weight which he added to it by the water table attachment, and he failed to strengthen the foundation on which the common wall rested, on the side which supported plaintiff’s building. The soil in the city of New Orleans is yielding, baffUng at times the skill of- the expert engineers to overcome the difficulties in the way of arresting the settling of large and heavy buildings. It is not unreasonable then to suppose that a large five-story building, partly built on an old foundation, would, to some extent, sink, and it is more plausible that an old foundation, partially taken up on one side, and reconstructed and not strengthened on the other, on which partly rests a heavy wall, would disturb a’>d disarrange the old and existing *821wall. The fact that the new building visibly shows no signs of sinking is an evidence of the skill of the architect and builder, but the damaged and partially wrecked condition of the old building is also an evidence that the new work, in its solidity, was done at the expense and the sacrifice of the old.

The old wall was not sufficiently strong to support the additional weight placed upon it by defendant, and the foundation was so cut away on one side and not strengthened on the other as to endanger plaintiff’s wall.

In building, the defendant made use of the old wall to support his new wall, both in the foundation and in the attachment, although the latter was not intended for the purpose of supporting the new wall. But from the views we have expressed it is plain to us that the attachment by means of the water table brought the weight of the new wall to bear on the old. These facts bring this case within the doctrine announced in the case of Pierce vs. Musson, 17 La. 389, in which it was held that “ an adjacent proprietor has no right to cut away part of the foundation of his neighbor’s wall or house, or to cause the projections of his wall to rest on that of his neighbor in building a new wall, and if it causes injury or damage he is responsible.”

In the instant case there was no effort made to strengthen the old wall as required by Art. 655, C. C., and by Arts. 681, 682.

The testimony does not show that the plaintiff has made an effort towards the permanent repair of his building. His demands for rent and for additional damages are repeated in supplemental petitions, with alarming frequency. Under these conditions the damages to be assessed against the defendant would be prolonged to an indefinte period and the old building would be a good investment, as it would be filled with tenants paying- rents through defendant, and reconstruction and repairs would be never ceasing. We do not say that in such a case, if repairs were completed and new damage done, no cause of action would arise. The contrary is the law. But we do say that an old building injured by the erection of a new one can not be kept out of repair, and a demand constantly growing and enlarging against the party erecting the new structure. Under the pleadings we can not safely estimate the rents. For all demands in the sevei'al supplemental petitions to the time of filing the same, we think the estimate of the District Judge liberal. *822After repairs have been made, plaintiff’s rights to demand damages for new injuries will be reserved, and for rents during a reasonable time taken for repairs.

Judgment affirmed.