delivered the opinion of the Court.
Plaintiffs sued several defendants for damages based on the latters’ negligence in causing a fire which destroyed plaintiffs’ home and its contents. The jury returned a verdict for plaintiffs in the sum of $30,500 and judgment was entered thereon. Plaintiffs moved that the judgment be amended to award them the sum of $60,542.64 or in the alternative for a new trial on the issue of damages. The District Court ordered the judgment amended to award the homeowner $50,614.93. One of the defendants appeals for reinstatement of the jury’s damage award or for a new trial on all issues. Plaintiffs cross-appeal, seeking a further increase in the damage award to $60,542.64.
In the spring of 1973 plaintiff Seymour Bohrer, a native of New York who had never visited the west before, purchased a tract of land in a recreational subdivision near Ennis, Montana, for the purpose of constructing a vacation home thereon for his family.
After the purchase of the land, plaintiff asked the seller about building a house there. The seller informed him that he had a dealership arrangement with Levitt Construction Systems, Inc., a California based manufacturer of modular homes, and that several such homes were being constructed on other nearby homesites. Plaintiff arranged for his wife to go to California and meet with an interior decorator who the seller had indicated was handling the furnishings and equipping of several of the other homes. Mrs. Bohrer subsequently visited the factory where the homes were *236 manufactured, selected a model she wanted, and together with the interior decorator began ordering the furniture, decorations and other items for the home.
Among the items that plaintiffs wanted included in their home was a fireplace, but Levitt Construction did not have any models including that feature. Levitt Construction therefore, at plaintiff’s request, ordered a free-standing metal fireplace manufactured by the Majestic Company and placed it, still in its shipping carton, inside the modular home to be transported to Montana.
In early August, 1973, Morgan Drive Away Trucking Company delivered thé Levitt home to the homesite. Several local firms in Ennis, Montana, were then hired to perform into a functional vacation home. Defendant Steve Clark a construction contractor, was employed to lay a foundation for the unit, join the two halves of the home together, and otherwise perform the work necessary to “set up” the modular home on the building site. Clark also added an extra room and deck onto the house at plaintiff’s request. Another local firm, Shaefer Plumbing & Sheet Metal, Inc., was employed by plaintiff to make repairs to plumbing which had been damaged in transit and to replace the furnace with a larger model.
In mid-August, 1973, Mr. Bohrer visited the homesite to check on the progress of the construction. He noted that the fireplace was unattached and spoke with defendant Clark about installing it. Defendant informed him that a flue, a length of pipe to go through the ceiling, was needed and that someone with sheet metal knowledge and experience would be required to handle the job. After further discussion, plaintiff returned home with the understanding that between defendant Clark and Shaefer Plumbing & Sheet Metal, Inc., the installation of the fireplace would be completed.
The record is unclear whether plaintiff himself requested Shaefer Plumbing to order the flue or whether defendant Clark told Shaefer to order it for plaintiff. In any event, the flue arrived at Shaefer Plumbing in early September. Shortly thereafter Shaefer Plumbing directed its employee, Jonathan Todd, to accompany defendant Clark to the homesite and install the flue. Between the two of them *237 the flue was installed and hooked up to the fireplace. The Majestic Company provides with each of its fireplaces a detailed set of installation instructions requiring that a protective noncombustible floor covering should be placed under the fireplace. Defendant Clark did not see any instructions with the fireplace. The fireplace was installed standing on the bare, unprotected carpet.
On December 24, 1973 plaintiffs arrived to spend Christmas in their new vacation home. Mr. and Mrs. Bohrer planned to spend a week in Montana and then go to California to spend New Year’s and the following week. They therefore had brought with them a considerable wardrobe for themselves and their two children.
During the early evening after plaintiffs’ arrival it developed that insufficient fuel had been ordered for the propane tanks to the furnace. Plaintiff contacted several neighbors, who in turn contacted the delivery service. Several of the neighbors came over to plaintiffs’ home to make sure that the propane delivery was made. After the propane arrived at about 9:30 in the evening, the neighbors stayed to visit, make sure the furnace was operating, and have a few Christmas toasts to welcome plaintiffs to Montana. Plaintiffs do not drink, but did provide Christmas cheer for their guests.
At any rate, sometime prior to the arrival of the fuel truck, a fire was started in the fireplace. It was not a roaring blaze, and shortly before 11:30 p.m. when the guests were leaving, one of the neighbors, Walter Johnson, reached into the fireplace and with his bare hands stacked the remaining embers and cinders toward the back. Plaintiffs retired shortly thereafter. Just before she fell asleep, Mrs. Bohrer thought she smelled smoke. When Mr. Bohrer went to investigate, he found the wall behind the fireplace ablaze. He attempted to beat the flames out with a blanket, but his efforts were fruitless. He evacuated his wife and children and they drove to a neighbor’s for assistance. Before any firefighting efforts could be initiated, the modular home and all of its contents were destroyed by the fire.
A complaint was filed in the District Court of the Second Judicial District, Silver Bow County, on January 27, 1975. The complaint named as defendants Steve Clark, d/b/a Steve Clark Construction; *238 Levitt Construction Systems, Inc. (the modular home manufacturer), and the Majestic Company (manufacturer of the fireplace). An amended complaint adding Shaefer Plumbing & Sheet Metal, Inc. as a party defendant was filed on February 27, 1975. A second amended complaint later added Morgan Drive Away as another defendant on the theory that the trucking company’s negligence may have caused the loss of the installation instructions. The second amended complaint alleged that the negligence of one or all of the defendants had caused the destruction of plaintiffs’ home and its contents.
The action was removed to federal court, subsequently remanded back to state court, and came on for trial by jury on January 24, 1977. By that time, the pleadings had been amended again to add a claim for personal injuries allegedly sustained by the Bohrer family in the fire.
During the presentation of plaintiffs’ case, negotiations between plaintiffs and defendants Levitt Construction Inc., the Majestic Company, and Morgan Drive Away, Inc., resulted in a agreement whereby those defendants would pay plaintiffs $8,000 as a settlement, and in return plaintiffs would not resist their motions for dismissal and directed verdict after plaintiffs rested their case. Levitt, Majestic, and Morgan continued to participate in the trial, but pursuant to the agreement plaintiffs presented no evidence of negligence on their part. When plaintiffs rested, the unopposed motions for dismissal of Levitt, Majestic and Morgan were granted. Thereafter, the court advised the jury that three of the defendants were no longer in the case and that they would be further instructed on that matter later in the trial. Defense counsel for the two remaining defendants, appellant Clark and Shaefer Plumbing, requested that the jury specifically be advised that the dismissed parties had settled for $8,000 and that the jury was to deduct that amount from any award they might make to plaintiffs. The trial court judge chose to withhold the details of the settlement from the jury and elected to make the necessary deduction himself after the jury had returned its verdict.
*239 On Janüary 28, 1977 the jury returned a special verdict finding both Clark and Shaefer Plumbing guilty of negligence which caused the fire. The jury awarded no damages for personal injuries, but awarded $30,500 for property damage.
On -February 8 plaintiffs moved to alter and amend the judgment or, in the alternative, for a new trial. The motion alleged that the jury verdict was contrary to the undisputed evidence at the trial. Plaintiffs contended that the evidence required an award of $60,542.64 and moved the court either to enter judgment in their favor for that sum or grant them a new trial on the sole issue of damages.
On March 11 the District Court entered an order amending the judgment to award plaintiff $50,614.93 damage. Both sides subsequently appealed; defendant Steve Clark seeks reinstatement of the original judgment or a new trial of the entire action, and plaintiffs seek a judgment increasing the damage award to $60,542.64.
The issues on appeal can be summarized in this manner:
(1) Was the District Court correct in increasing the damage award from $30,500 to $50,614.93?
(2) Can this Court on appeal increase a jury award of damages?
(3) Was the giving and refusal of certain jury instructions reversible error?
(4) Sufficiency of the evidence to establish defendant’s liability.
The first two issues both deal with the question of “additure”. Issue number one raises the question from the perspective of the trial court’s power to increase an award of damages, and issue number two poses the same inquiry as to this Court’s power to increase the verdict and judgment.
Rule 59(g), M.R.Civ.P. provides for motions to alter or amend a judgment and states that such motions may be combined with a motion for new trial. In this case, plaintiffs made such a motion, requesting that the jury verdict be increased to $60,542.64, or in the alternative that a new trial be granted on the sole issue of damages. A similar motion was the subject of an appeal to this Court in
State
*240
Highway Commission v. Schmidt
(1964),
In recent decision, however, this Court contradicted the holding in
Schmidt
by dictum.
Ferguson v. Town Pump, Inc.
(1978),
We recognize that there is a split of authority on this question. Having re-evaluated it in all its implications, however we conclude that the reasoning articulated in
Schmidt,
states the better rule. Therefore, we expressly overrule that portion of
Ferguson v. Town Pump, Inc.
(1978),
*241
We should point out that
Schmidt
was the controlling law at the time the trial court made the additure here, as
Town Pump
had not yet been decided. The primary authority cited by the trial court in its memorandum accompanying the order increasing the verdict was
Zook Brothers Construction Co. v. State of Montana
(1976),
Reference to Zook Brothers brings us to the second issue on peal; that is, this Court’s power to increase an award of damages. Plaintiffs have cross-appealed for an order of this Court increasing the award from the $30,500 jury verdict to $60,542.64, which plaintiffs contend they are entitled to by virtue of undisputed evidence. Plaintiffs rely on Zook Brothers as authority for such an award by this Court. Zook Brothers, however, as we indicated above, involved a special set of limited circumstances. It was a case appealed from a trial to the court rather than to a jury, and a case in which we found the inadequacy of the award to be merely the result of an error in mathematical calculation.
Plaintiffs here argue that their damages are calculable with even greater mathematical certainty than in Zook Brothers. We have not undertaken to evaluate that contention because we hold that Zook Brothers should be strictly construed and that it is not controlling here. Zook Brothers, tried to the court, is not authority for us to add to the verdict here in a case tried to a jury, regardless of the presence or absence of the aspect of mathematical certitude.
We are aware that, as plaintiffs stated in their brief, the cases
*242
cited in
Zook Brothers
as authority for scaling upward the lower court’s award are all jury cases.
Nesbitt v. City of Butte
(1945),
We decline, therefore, to expend our holding in Zook Brothers to encompass the relief requested by plaintiffs. Zook Brothers is not general for appellate additure. Rather, the rule in Zook Brothers may be invoked only for an adjustment of an award of damages made by a District Court sitting without a jury, and only to correct an error ascertainable by mathematical calculation.
Having determined that the District Court erred when it added to the jury verdict, and that this is not a proper case for increase of the award by this Court, we are still left with the task of reaching a resolution of this controversy. Defendant has asked us either to order reinstatement of the original judgment of the jury verdict, or remand for a new trial of the entire action (on other specified grounds of error which we will address further below). Plaintiffs, on the other hand, sought in the District Court either additure to $60,542.64 or a new trial on the sole issue of damages, but on appeal have requested only that this Court amend the judgment upward to the sum they contend the evidence proves.
In actions involving injury to property, the proper amount of recovery is usually ascertainable by reference to fixed action appears to be inadequate, a new trial will be ordered. 58 *243 Am.Jur.2d New Trial § 154. Generally, the allowance or refusal of a motion for a new trial on the grounds of inadequate damages is a matter for the discretion of the District Court. 66 C.J.S. New Trial § 201(6).
Rule 59(a), M.R.Civ.P., provides that “a new trial may be granted on all or part of the issues” in a case.
Seibel v. Byers
(1959),
It is apparent from the trial court’s action on plaintiff’s motion to amend that the court was convinced the jury had reached a proper verdict on the issue of liability. Clearly, also, the trial court concluded that the jury’s award was inadequate. The court stated in its order amending and altering judgment that the evidence would have supported summary judgment for plaintiffs for at least $41,364.62, yet the jury returned a verdict of only $30,500. Under these circumstances, an order granting a new trial limited to the issue of damages would have been within the court’s discretion. Such an order, rather than amendment upward of the award, would have been a proper exercise of the court’s discretion here. Since the District Court did not rule on the motion for new trial, however, and since plaintiffs have not requested us on appeal to order a new trial on the sole issue of damages, we will not do so. Therefore, we order instead that the District Court’s order amend *244 ing and altering judgment is hereby vacated and the cause is remanded for a new trial, the scope of which shall be left to the District Court in the sound exercise of its discretionary powers.
Defendant urges that numerous errors were committed by the District Court in its choice of instructions to the jury. To avoid the possibility of a future appeal should the same instructions be used at the retrial, we will address those arguments in this opinion.
Six alleged errors are raised:
(a) Defendant objects to the court’s refusal of his proposed instruction on contributory negligence. Defendant argues that plaintiffs may have been found contributorily negligent in purchasing a fireplace for a modular home without inquiring as to its safety or suitability, or for not obtaining or reading instructions on the installation before ordering it done.
It is true that as a general rule, issues of negligence and contributory negligence should be decided by the jury.
Parrish v. Witt
(1976),
*245
(b) Defendant objects to the court’s refusal of his proposed instruction on damages. Defendant offered an instruction in language taken from
Spackman v. Ralph M. Parsons Co.
(1966),
(c) Defendant complains of the District Court’s refusal of his offered instructions on imputed negligence, alleging that certain of plaintiffs’ agents had acted negligently and that their negligence amounts through agency principles to negligence of the plaintiffs themselves. The same rules as stated in our discussion of the contributory negligence issue apply to any alleged negligence on the part of plaintiffs’ agents which might be imputed to plaintiffs. There was no evidence establishing that the acts of any plaintiffs’ agents other than defendant Clark and Shaefer Plumbing were a proximate cause of the fire. Both defendant Clark and Shaefer Plumbing admitted in their testimony at trial that it was their duty to insure that plaintiffs’ home would not be damaged by the fireplace they installed. No such duty was established as to any of the other parties involved.
Defendant Clark argues that the negligence of Shaefer Plumbing should be imputed to plaintiffs. If so, then couldn’t Shaefer Plumbing argue that Clark’s negligence is likewise imputed to plaintiffs, leaving plaintiffs no remedy against either? This is a case of joint and several liability. We find no error in the refusal of the imputed negligence instructions.
(d)Defendant objects to the court’s instruction that the cause of the fire was the defectively installed fireplace. Defendant argues that this was a question of fact for the jury to determine. There is, however, no evidence in the record that the fire originated
*246
from any other source. An instruction is not objectionable because it assumes an uncontroverted fact, or one which is admitted or conclusively shown by the evidence.
Hogan v. Shuart
(1892),
Defendant argues that the instruction that the fireplace was the cause of the fire was inconsistent and contradictory in that the court also instructed the jurors that they were not bound by the opinion of two expert witnesses who testified on that issue. We agree that the giving of conflicting instructions upon a material issue is reversible error.
Skeleton v. Great Northern Ry. Co.
(1940),
(e) Defendant argues that he was only following a floor plan supplied by plaintiffs when he installed the fireplace. He objects to the court’s refusal of his instruction that damages resulting from defective or insufficient plans furnished by an owner cannot be blamed on a construction contractor.
Leigland v. McGaffick
(1959),
(f) Defendant alleges error in the District Court’s failure to instruct the jury more thoroughly in regard to the dismissal of the defendants who had settled with plaintiffs. There is an even division of authority as to whether the terms of a settlement should be revealed to the jury and whether the jury or the court itself should make the necessary deduction from any award óf damages. Annot: 94 A.L. R.2d 352. In our opinion, this is a matter that should be left to the discretion of the trial court. We agree with those jurisdictions holding that the trial court’s decision on the matter should
*247
not be disturbed unless it clearly appears that a fair trial has been jeopardized. Cf.
Degen v. Bayman
(1972), S.D.,
We now turn to the final issue for review; the sufficiency of the evidence to support a finding of liability on the part of defendant Clark. Defendant contends that there was no contract between him and plaintiffs for installation of the fireplace and no duty upon him in that regard. The only charges made to plaintiffs relating to the fireplace installation, he argues, were made by Shaefer Plumbing. Therefore, he concludes, the jury’s finding against him was not supported by the evidence and the District Court should have granted his motion to dismiss at the close of plaintiffs’ case-in-chief.
Evidence in support of a verdict is not insufficient if it is substantial.
State Highway Commission v. Arms
(1974),
The order of the District Court amending the judgment to award plaintiffs the sum of $50,614.93 is vacated together with the original judgment. The cause is remanded for a new trial consistent with this opinion.